Jump to content

List of Mumbai Metro stations

From Wikipedia, the free encyclopedia
(Redirected from Suman Nagar metro station)

Topological map of Mumbai's public transport system

This is a list of all stations of the Mumbai Metro, a rapid transit system serving Mumbai in the Mumbai Metropolitan Region of India. The Mumbai Metro is the Fifth transit system to be built in India. The first line of the Mumbai Metro was opened on 8 June 2014 with the Blue Line 1, with the current total number of 53 stations operating as of November 2024[1]

Currently, the expansion of the Mumbai Metro network is going to be around 200 km (120 mi). This expansion will allow Mumbai to connect with its satellite cities that lay in the Mumbai Metropolitan Region.[2][3][4]

Each line of the Mumbai Metro is identified by a specific color. The system uses rolling stocks of standard gauge trains and has a combination of elevated, underground and at-grade lines.[5]

Metro stations

[edit]
Terminal station
* Transfer station
†* Terminal and transfer station to other lines
†† Transfer station to Mumbai Suburban Railway and Mumbai Monorail
** Transfer station to other lines and Mumbai Suburban Railway and Mumbai Monorail
#* Terminal and transfer station to Mumbai Suburban Railway, Mumbai Monorail and Indian Railways
†¤ Terminal, transfer station to other lines, Mumbai Suburban Railway, Mumbai Monorail and Indian Railways

This list is sortable. Click on the icon in the column header to change sort key and sort order

Sr. No. Station name Line Layout Platform Layout Status Notes Refs
English Marathi
1 Aarey JVLR आरे कॉलनी Line 3 At-grade Side Operational from 5 October 2024 [6][7]
[8]
2 Acharya Atrey Chowk आचार्य अत्रे चौक Line 3 Underground Island Under construction Also known as Worli Naka metro station [9]
3 Airport Road विमानतळ रस्ता Line 1 Elevated Side Operational from
8 June 2014
[10]
4 Andheri†† अंधेरी Line 1 Elevated Side Operational from
8 June 2014
Transfer station for Andheri railway station [11]
5 Asalpha असल्फा Line 1 Elevated Side Operational from
8 June 2014
[12]
6 Azad Nagar आझाद नगर Line 1 Elevated Side Operational from
8 June 2014
[13]
7 Aarey आरे Line 7 Elevated Side Operational from
2 April 2022
[14]
8 Adarsh Nagar* आदर्श नगर Line 6 Elevated Side Under construction Interchange with Yellow Line 2 on Shastri Nagar metro station [15]
9 Airport Colony विमानतळ कॉलनी Line 7 Elevated Side Under construction [16]
10 Amar Mahal Junction अमर महाल जंक्शन Line 4 Elevated Side Under construction [17]
11 Amar Palace (Miragaon)* अमर पॅलेस (मिरागाव) Line 9 Elevated Side Under construction Interchange with Green Line 10 and Purple Line 13 on Shivaji Chowk (Mira Road) [18]
12 Anand Nagar (Dahisar) आनंद नगर (दहिसर) Line 2 Elevated Side Operational from
2 April 2022
Also known as Upper Dahisar metro station [19]
13 Andheri (East)* अंधेरी (पूर्व) Line 7 Elevated Side Operational from 19 January 2023 Also known as Gundavali metro station with Interchanging at Blue Line 1 on Western Express Highway [20][21]
[22][23]
14 Anik Nagar Bus Depot आणिक नगर बस डेपो Line 4 Elevated Side Under construction [24]
15 Anjur Phata अंजूर फाटा Line 5 Elevated Side Under construction [25]
16 Badhwar Park बधवार पार्क Line 3 Underground Island Under construction [26]
17 Bale बाळे Line 12 Elevated Side Under construction
18 Balkum Naka बाळकुम नाका Line 5 Elevated Side Under construction [27]
19 Bandongri बाणडोंगरी Line 7 Elevated Side Operational from
2 April 2022
Also known as Akurli metro station [28][29]
20 Bandra†† वांद्रे Line 2 Elevated Side Under construction Transfer station for Bandra railway station [30][31]
21 Bangur Nagar (Goregaon) बांगुर नगर (गोरेगाव) Line 2 Elevated Side Operational from 19 January 2023 Also known as Pahadi Goregaon metro station [32]
22 Bhakti Park (Wadala)#* भक्ती पार्क (वडाळा) Line 4
Line 11
Elevated Side Under construction Interchange with Bhakti Park monorail station on Line 1 (Mumbai Monorail) [33]
23 Bhandup Mahapalika भांडुप महापालिका Line 4 Elevated Side Under construction [34]
24 Bhandup†† भांडुप Line 4 Elevated Side Under construction Transfer station to Bhandup railway station [35]
25 Bhiwandi भिवंडी Line 5 Elevated Side Under construction [36]
26 Borivali Omkareshwar (National Park) बोरीवली ओंकारेश्वर (राष्ट्रीय उद्यान) Line 7 Elevated Side Operational from
2 April 2022
Also known as Rashtriya Udyan metro station [37]
27 BPT Hospital बी.पी.टी. रुग्णालय Line 11 Elevated Side Under construction
28 BSNL, Govandi बीएसएनएल, गोवंडी Line 2 Elevated Side Under construction [38]
29 Cadbury Junction कॅडबरी जंक्शन Line 4 Elevated Side Under construction [39]
30 Carnac Bunder कर्नाक बंदर Line 11 Underground Island Under construction
31 Chakala (J B Nagar) चकाला (जे.बी. नगर) Line 1 Elevated Side Operational from
8 June 2014
[40]
32 Charkop चारकोप Line 2 Elevated Side Operational from 19 January 2023 Also called as Valnai metro station [41]
33 Chembur†† चेंबूर Line 2 Elevated Side Under construction Interchange with VNP and RC Marg Junction monorail station on Line 1 (Mumbai Monorail) [42]
34 Chhatrapati Shivaji Maharaj Terminus†¤ छत्रपती शिवाजी महाराज टर्मिनस Line 3
Line 11
Underground Side and Island Under construction Transfer station for Chhatrapati Shivaji Maharaj Terminus [43][44]
35 Churchgate†† चर्चगेट Line 3 Underground Island Under construction Transfer station to Churchgate railway station [45]
36 Clock Tower घड्याळ टॉवर Line 11 Underground Island Under construction
37 Coal Bunder कोळसा बंदर Line 11 Underground Island Under construction
38 CSMIA T1 छ.शि.म.आं.वि. ट-१ Line 3 Underground Island Operational from 5 October 2024 [46]
39 CSMIA T2†* छ.शि.म.आं.वि. ट-२ Line 3
Line 7
Line 8[a]
Underground Side and Island Operational from 5 October 2024 [47]
40 Cuffe Parade कफ परेड Line 3 Underground Island Under construction [48]
41 D.N. Nagar* डी.एन. नगर Line 1
Line 2
Elevated Side Operational from
8 June 2014
[49]
42 Dadar दादर Line 3 Underground Island Under construction [50]
43 Dahisar East†* दहिसर (पूर्व) Line 9
Line 7
Line 2
Elevated Side and Island Operational from
2 April 2022
[51]
44 Darukhana दारूखाना Line 11 Underground Island Under construction
45 Deepak Hospital (Medtiya Nagar) दीपक हॉस्पिटल (मेडतिया नगर) Line 9 Elevated Side and Island Under construction Also known as Golden Nest metro station [52]
46 Dhamankar Naka धामणकर नाका Line 5 Elevated Side Under construction [53]
47 Dharavi धारावी Line 3 Underground Island Under construction [54]
48 Diamond Garden डायमंड गार्डन Line 2 Elevated Side Under construction [55]
49 Dombivali MIDC डोंबिवली एमआयडीसी Line 12 Elevated Side Under construction
50 Don Bosco (Borivali) डाॅन बॉस्को (बोरीवली) Line 2 Elevated Side Operational from
2 April 2022
Also known as Borivali West metro station [56][57]
51 Hiranandani Estate (Dongripada) हिरानंदानी इस्टेट (डोंगरीपाडा) Line 4 Elevated Side Under construction [58]
52 Durgadi Fort दुर्गाडी किल्ला Line 5 Elevated Side Under construction [59]
53 Eastern Express Highway पूर्व द्रुतगती महामार्ग Line 2 Elevated Side Under construction [60]
54 Shimpoli शिंपोली Line 2 Elevated Side Operational from
2 April 2022
Also known as Pahadi Eksar metro station [61]
55 Ekta Nagar एकता नगर Line 2 Elevated Side Operational from
2 April 2022
Also known as Mahavir Nagar Kandivali (West) metro station [62][63]
[64]
56 ESIC Nagar ईएसआयसी नगर Line 2 Elevated Side Under construction [65]
57 Gaimukh गायमुख Line 4
Line 10
Elevated Side Under construction [66]
58 Gaimukh Reti Bandar गायमुख रेतीबंदर Line 10 Elevated Side Under construction [67]
59 Gandhi Nagar (Kanjurmarg)** गांधी नगर (कांजुर मार्ग) Line 4 Elevated Side Under construction Interchange station with Kanjurmarg railway station and Kanjurmarg (West) metro station on Pink Line 6 [68]
60 Ganesh Nagar (Kalyan) गणेश नगर (कल्याण) Line 12 Elevated Side Under construction
61 Ganesh Nagar गणेश नगर Line 11 Elevated Side Under construction
62 Garodia Nagar गरोडिया नगर Line 4 Elevated Side Under construction [69]
63 Ghatkopar#* घाटकोपर Line 1 Elevated Island Operational from
8 June 2014
Transfer station for Ghatkopar railway station [70]
64 Girgaon गिरगाव Line 3 Underground Island Under construction [71][72]
65 Godrej Company गोदरेज कंपनी Line 4 Elevated Side Under construction [73]
66 Golavali गोळवली Line 12 Elevated Side Under construction
67 Gopal Nagar गोपाळ नगर Line 5 Elevated Side Under construction [74]
68 Govegaon MIDC गोवेगाव एमआयडीसी Line 5 Elevated Side Under construction [75]
69 Gowniwada गोवनीवाडा Line 4 Elevated Side Under construction [76]
70 Grant Road†† ग्रँट रोड Line 3 Underground Island Under construction Transfer station to Grant Road railway station [77][78]
71 Hay Bunder हे बंदर Line 11 Underground Island Under construction
72 Hedutane हेदुटणे Line 12 Elevated Side Under construction
73 Hutatma Chowk हुतात्मा चौक Line 3 Underground Island Under construction [79]
74 I.C. Colony आय.सी. कॉलनी Line 2 Elevated Side Operational from
2 April 2022
Also known as Mandapeshwar metro station [80]
75 IIT Powai आयआयटी पवई Line 6 Elevated Side Under construction [81]
76 ILFS, BKC आयएलएफएस, बीकेसी Line 2 Elevated Side Under construction [82]
77 Income Tax Office (BKC)* आयकर कार्यालय (बी. के. सी.) Line 2
Line 3
Elevated; Underground Side and Island Under construction; Operational from 5 October 2024 [83][84]
78 Indira Nagar (Vile Parle) इंदिरा नगर (विलेपार्ले) Line 2 Elevated Side Under construction [85]
79 Indralok इंद्रलोक Line 9 Elevated Side Under construction [86]
80 Jagruti Nagar जागृती नगर Line 1 Elevated Side Operational from
8 June 2014
[87]
81 Jogeshwari (West)†† जोगेश्वरी (पश्चिम) Line 6 Elevated Side Under construction Transfer station to Jogeshwari railway station [88]
82 JVLR Junction* जेवीएलआर जंक्शन Line 6
Line 7
Elevated Side Under construction Also known as Jogeshwari-Vikhroli Link Road Junction metro station [89][90]
[91]
83 Kalbadevi काळबादेवी Line 3 Underground Island Under construction [92]
84 Kalher काल्हेर Line 5 Elevated Side Under construction [93][94]
85 Kalyan APMC कल्याण एपीएमसी Line 5
Line 12
Elevated Side Under construction [95]
86 Kalyan Railway Station†† कल्याण रेल्वे स्थानक Line 5 Elevated Side Under construction Transfer station to Kalyan Junction railway station [96]
87 Kandivali कांदिवली Line 2 Elevated Side Operational from
2 April 2022
Also known as Dahanukarwadi (Kandivali) metro station [97]
88 Kanjurmarg (West)** कांजुर मार्ग (पश्चिम) Line 6 Elevated Side Under construction Interchange station with Kanjur Marg railway station and Gandhi Nagar (Kanjurmarg) metro station on Green Line 4 [98][99]
89 Kapurbawdi†* कापूरबावडी Line 4
Line 5
Elevated Side Under construction [100]
90 Kasarvadavali कासारवडवली Line 4 Elevated Side Under construction [101]
91 Kasheli कशेळी Line 5 Elevated Side Under construction [102]
92 Kashimira काशिमिरा Line 10 Elevated Side Under construction Also known as Kashigaon metro station
93 Kastur Park (Shimpoli) कस्तुर पार्क (शिंपोली) Line 2 Elevated Side Operational from
2 April 2022
Also known as Shimpawali metro station [103]
94 Kasturi Park (Malad) कस्तुरी पार्क (मालाड) Line 2 Elevated Side Operational from 19 January 2023 Also known as Inorbit Mall (Malad) metro station or Lower Malad metro station [104]
95 Khira Nagar†† खिरा नगर Line 2 Elevated Side Under construction Transfer station to Santacruz railway station [105]
96 Kolegaon कोळेगाव Line 12 Elevated Side Under construction
97 Kongaon कोनगाव Line 5 Elevated Side Under construction [106]
98 Kurar Village कुरार गाव Line 7 Elevated Side Operational from
2 April 2022
Also known as Pushpa park metro station [107]
99 Kurla (East)†† कुर्ला (पूर्व) Line 2 Elevated Side Under construction Transfer station to Kurla railway station and Lokmanya Tilak Terminus [108]
100 Laxmi Nagar (Ghatkopar) लक्ष्मी नगर (घाटकोपर) Line 4 Elevated Side Under construction [109]
101 Magathane Bus Depot (Borivali) मागाठाणे बस आगार (बोरीवली) Line 7 Elevated Side Operational from
2 April 2022
[110]
102 Mahakali Caves महाकाली लेणी Line 6 Elevated Side Under construction [111]
103 Mahalaxmi†† महालक्ष्मी Line 3 Underground Island Under construction Transfer station to Mahalaxmi railway station and Sant Gadge Maharaj Chowk monorail station on Line 1 (Mumbai Monorail) [112]
104 Mahanand (Goregaon East) महानंद (गोरेगाव पूर्व) Line 7 Elevated Side Under construction [113][114]
[115]
105 Mahapalika Marg महापालिका मार्ग Line 4 Elevated Side Under construction [116]
106 Poisar पोईसर Line 7 Elevated Side Operational from
2 April 2022
[117][118]
107 Majiwada माजिवडा Line 4 Elevated Side Under construction [119][120]
108 Malad मालाड Line 2 Elevated Side Operational from 19 January 2023 Also called as Malad (West) metro station [121]
109 Mandala मंडळा Line 2 Elevated Side Under construction [122]
110 Mankhurd†† मानखुर्द Line 2 Elevated Side Under construction Transfer station to Mankhurd railway station [123]
111 Manpada (Dombivali East) मानपाडा (डोंबिवली पूर्व) Line 12 Elevated Side Under construction
112 Manpada (Thane) मानपाडा (ठाणे) Line 4 Elevated Side Under construction [124]
113 Marol Naka* मरोळ नाका Line 1
Line 3
Elevated; Underground Side and Island Operational from
8 June 2014; Operational from 5 October 2024
[125][126]
114 MBMC Sports Complex एमबीएमसी क्रीडा संकुल Line 9 Elevated Side Under construction [127]
115 MIDC एमआयडीसी Line 3 Underground Island Under construction [128]
116 MTNL, BKC एमटीएनएल, बीकेसी Line 2 Elevated Side Under construction [129]
117 Mulund Fire Station मुलुंड अग्निशामक केंद्र Line 4 Elevated Side Under construction [130]
118 Mulund Naka मुलुंड नाका Line 4 Elevated Side Under construction Also known as Mulund Check Naka metro station [131]
119 Mumbai Central†† मुंबई सेंट्रल Line 3 Underground Island Under construction Transfer station to Mumbai Central railway station [132]
120 Nanavati Hospital नानावटी रुग्णालय Line 2 Elevated Side Under construction [133]
121 National College (Bandra) राष्ट्रीय महाविद्यालय (वांद्रे) Line 2 Elevated Side Under construction Link to National College [134]
122 Naval Housing नौदल हाउसिंग Line 4 Elevated Side Under construction [135]
123 Nilaje Gaon निळजे गाव Line 12 Elevated Side Under construction
124 Oshiwara ओशिवरा Line 2 Elevated Side Operational from 19 January 2023 - [136]
125 Pandurang Wadi पांडुरंग वाडी Line 9 Elevated Side Under construction Also known as Dahisar Check Naka metro station [137][138]
[139]
126 Pant Nagar पंत नगर Line 4 Elevated Side Under construction [140]
127 Pisarve Depot पिसार्वे डेपो Line 12 Elevated Side Under construction
128 Pisarve पिसार्वे Line 12 Elevated Side Under construction
129 Pisavali Gaon पिसवली गाव Line 12 Elevated Side Under construction
130 Powai Lake पवई तलाव Line 6 Elevated Side Under construction [141]
131 Prem Nagar प्रेम नगर Line 2 Elevated Side Under construction [142]
132 Purna पूर्णा Line 5 Elevated Side Under construction [143]
133 Rajnouli Village रांजणोली गाव Line 5 Elevated Side Under construction [144]
134 Rambaug (Powai) रामबाग (पवई) Line 6 Elevated Side Under construction [145]
135 RTO Thane आरटीओ ठाणे Line 4 Elevated Side Under construction [146]
136 Rushi Sankul ऋषी संकुल Line 2 Elevated Side Operational from
2 April 2022
Also known as Kandarpada metro station [147]
137 Sagaon सागाव Line 12 Elevated Side Under construction
138 Sahajanand Chowk सहजानंद चौक Line 5 Elevated Side Under construction [148]
139 Sahar Road सहार मार्ग Line 3 Underground Island Operational from 5 October 2024 [149][150]
140 Sai Baba Nagar साई बाबा नगर Line 9 Elevated Side Under construction Also known as Shivar Garden metro station [151]
141 Saki Naka साकी नाका Line 1 Elevated Side Operational from
8 June 2014
[152]
142 Saki Vihar Road साकी विहार रोड Line 6 Elevated Side Under construction [153]
143 Goregaon (West) गोरेगाव (पश्चिम) Line 2 Elevated Side Operational from 19 January 2023 - [154]
144 Santacruz†† सांताक्रुझ Line 3 Underground Island Operational from 5 October 2024 Transfer station to Santacruz railway station [155]
145 Saraswat Nagar सारस्वत नगर Line 2 Elevated Side Under construction [156]
146 Science Museum विज्ञान संग्रहालय Line 3 Underground Island Under construction [157]
147 SEEPZ* सीप्झ Line 3 Underground Island Operational from 5 October 2024 Interchange station to Pink Line 6 on SEEPZ Village metro station [158]
148 SEEPZ Village* सीप्झ गाव Line 6 Elevated Side Under construction Interchange station to Aqua Line 3 on SEEPZ metro station [159]
149 Sewri†† शिवडी Line 11 Underground Island Under construction Transfer station to Sewri railway station
150 SG Barve Marg एसजी बर्वे मार्ग Line 2 Elevated Side Under construction [160]
151 Shahid Bhagat Singh Garden शहीद भगतसिंग उद्यान Line 9 Elevated Side Under construction Also known as Maxus Mall metro station [161]
152 Shangrila शांग्रीला Line 4 Elevated Side Under construction [162]
153 Shankarwadi शंकरवाडी Line 7 Elevated Side Under construction [163]
154 Shastri Nagar (Mumbai)* शास्त्री नगर Line 2 Elevated Side Operational from 19 January 2023 Interchange with Pink Line 6 on Adarsh Nagar (Mumbai) metro station and also called as Lower Oshiwara metro station [164]
155 Shitladevi Temple शितलादेवी मंदिर Line 3 Underground Island Under construction Also known as Mahim metro station [165][166]
156 Shivaji Chowk (Chembur) शिवाजी चौक (चेंबूर) Line 2 Elevated Side Under construction [167]
157 Shivaji Chowk (Mira Road)†* शिवाजी चौक (मिरा रोड) Line 10
Line 13[b]
Elevated Side Under construction Interchange with Red Line 9 on Amar Palace (Miragaon) metro station [168]
158 Shreyas Cinema श्रेयस सिनेमा Line 4 Elevated Side Under construction [169]
159 Shrinath Nagar (Ovaripada) श्रीनाथ नगर (ओवरीपाडा) Line 7 Elevated Side Operational from
2 April 2022
[170]
160 Shyam Nagar (Mumbai) श्याम नगर Line 6 Elevated Side Under construction [171]
161 Siddharth Colony सिद्धार्थ कॉलनी Line 4 Elevated Side Under construction [172]
162 Siddhivinayak Temple सिद्धीविनायक मंदिर Line 3 Underground Island Under construction [173]
163 Sonapur सोनापूर Line 4 Elevated Side Under construction [174]
164 Sonarpada सोनारपाडा Line 12 Elevated Side Under construction
165 Subhash Chandra Bose Stadium सुभाषचंद्र बोस स्टेडियम Line 9 Elevated Side Under construction [175]
166 Suman Nagar सुमन नगर Line 4 Elevated Side Under construction [176]
167 Surya Nagar सूर्य नगर Line 4 Elevated Side Under construction [177]
168 Swami Samarth Nagar (Lokhandwala) स्वामी समर्थ नगर (लोखंडवाला) Line 6 Elevated Side Under construction [178]
169 Taloja†* तळोजा Line 12 Elevated Side Under construction Interchange with Line 1 (Navi Mumbai Metro) on Panchnand metro station
170 Teen Haath Naka (Thane) तीन हात नाका (ठाणे) Line 4 Elevated Side Under construction [179]
171 Temghar टेमघर Line 5 Elevated Side Under construction [180]
172 Devipada देवीपाडा Line 7 Elevated Side Operational from
2 April 2022
[181][182]
173 Tikuji-ni-wadi टिकुजीनीवाडी Line 4 Elevated Side Under construction [183]
174 Turbhe तुर्भे Line 12 Elevated Side Under construction
175 Vadavali वडवली Line 12 Elevated Side Under construction
176 Waklan वाकळण Line 12 Elevated Side Under construction
177 Varsova Char Phata वर्सोवा चार फाटा Line 10 Elevated Side Under construction
178 Versova वर्सोवा Line 1 Elevated Side Operational from
8 June 2014
[184]
179 Vidhan Bhavan विधान भवन Line 3 Underground Island Under construction [185][186]
180 Vidyanagri विद्यानगरी Line 3 Underground Island Operational from 5 October 2024 Also known as Mumbai University (Kalina) metro station [187]
181 Vijay Garden विजय गार्डन Line 4 Elevated Side Under construction [188]
182 Vikhroli EEH विक्रोली इ.इ.एच. Line 6
Line 14[c]
Elevated Side Under construction Also known as Tagore Nagar Junction metro station [189][190]
[191][192]
183 Vikhroli†† विक्रोळी Line 4 Elevated Side Under construction Transfer station to Vikhroli railway station [193]
184 Vitt Bhatti Junction (Dindoshi) वीट भट्टी जंक्शन (दिंडोशी) Line 7 Elevated Side Operational from
2 April 2022
[194]
185 Wadala Truck Terminal वडाळा ट्रक टर्मिनल Line 4 Elevated Side Under construction Also Known as Wadala TT metro station [195]
186 Wadi Bunder वाडी बंदर Line 11 Elevated Island Under construction
187 Western Express Highway* पश्चिम द्रुतगती महामार्ग Line 1 Elevated Side Operational from
8 June 2014
Interchange with Red Line 7 on Andheri (East) metro station [196]
188 Worli वरळी Line 3 Underground Island Under construction [197][198]
189 Kashigaon काशिगाव Line 9 Elevated Side Under construction Also known as Pleasant Park metro station [199][200]

Statistics

[edit]
Total number of metro stations 189
Total number of metro stations under construction 178
Number of interchange stations 38
Number of Elevated stations 155
Number of underground stations 33
Number of At-Grade stations 1

Notes

[edit]
  1. ^ Currently, The metro stations of Gold Line 8 are at the DPR stage after that the number of stations should be increased.
  2. ^ Currently, The metro stations of Purple Line 13 at the DPR stage after that the number of stations should be increased.
  3. ^ Currently, The metro stations of Magenta Line 14 are at the DPR stage after that the number of stations should be increased.

See also

[edit]

References

[edit]
  1. ^ "Mumbai Metro Blue Line 1 starts for public". India Today. 8 June 2014. Retrieved 19 October 2020.
  2. ^ "2 New Metros and 3 Road projects to ease to your commute in 2020". Times of India. 10 January 2020. Retrieved 19 October 2020.
  3. ^ "Mumbai Metro here's all you need to know about the entire city network". Mid-Day. 13 September 2019. Retrieved 15 September 2019.
  4. ^ "Entire Mumbai Metro Network to start in 6 years". Times of India. 28 January 2020. Retrieved 30 January 2020.
  5. ^ "Maha Mumbai Metro-Branding Vision and Style Guidelines". MMRDA. 28 February 2020. Retrieved 19 October 2020.
  6. ^ "Mumbai Metro car shed shifting from Aarey colony to cost Rs 200 Crore". Financial Express. 15 October 2020. Retrieved 20 October 2020.
  7. ^ "Mumbai Metro: Aarey's Gain Is Metro's Loss". India Today. 16 October 2020. Retrieved 17 October 2020.
  8. ^ "Aarey station to serve two Metro routes: MMRC". Indian Express. 21 March 2018. Retrieved 22 March 2018.
  9. ^ "Blue Star Wins Rs149 crore project from Mumbai Metro". Lokmat Times. 27 August 2020. Retrieved 30 August 2020.
  10. ^ "Mumbai Metro hits tracks and Handful of Speed Bumps". Mid-Day. 22 June 2014. Retrieved 19 October 2019.
  11. ^ "Andheri Metro Station renamed". Free Press Journal. 21 February 2017. Retrieved 22 February 2017.
  12. ^ "Fire Breaks out at Asalpha metro station". Times Now. 27 December 2019. Retrieved 30 December 2019.
  13. ^ "Mumbai Metro One to Install solar panels on 12 stations and depot". NDTV. 7 June 2016. Retrieved 10 June 2016.
  14. ^ "Metro 7 pillar core tilts at Aarey Road Junction". DNA. 22 October 2017. Retrieved 25 October 2017.
  15. ^ "HC allows MMRDA to start work on Metro line-6 in Andheri". Hindustan Times. 26 June 2020. Retrieved 27 June 2020.
  16. ^ "Metro 7A in Mumbai get twin tunnels". Hindustan Times. 24 January 2019. Retrieved 25 January 2019.
  17. ^ "MMRDA appoints contractors for Metro 2B and Metro 4 works". Business Standard. 3 March 2018. Retrieved 5 March 2018.
  18. ^ "Mira Bhayander to be connected with metro". The Times of India. 25 February 2017. Retrieved 26 February 2017.
  19. ^ "Metro 2A gets rod to run over western railway tracks at dahisar". DNA. 30 January 2018. Retrieved 1 February 2018.
  20. ^ "Work on Metro 7 extension to start in six months MMRDA". DNA. 18 September 2018. Retrieved 20 September 2018.
  21. ^ "Office in Goregaon? Now, take a shuttle from WEH Metro station". The Times of India. 6 August 2019. Retrieved 7 August 2019.
  22. ^ "Mumbai Metro almost complete but RInfra mum on timeframe". Firstpost. 10 April 2013. Retrieved 11 April 2013.
  23. ^ "Woman loses her life after crane collides with Metro pillar in Andheri (East)". Mumbai Mirror. 31 October 2020. Retrieved 1 November 2020.
  24. ^ "SC restraints Maharashtra from felling trees for Mumbai metro transfers plea to Bombay HC". The New Indian Express. 10 December 2019. Retrieved 15 December 2019.
  25. ^ "MMRDA to revisit the alignment of Metro 5 corridor". The Hindu. 1 February 2020. Retrieved 2 February 2020.
  26. ^ "200 Trees being uprooted for Mumbai Metro to be transplanted on western railway land". Hindustan Times. 3 August 2017. Retrieved 15 August 2017.
  27. ^ "Thane-Bhiwandi-Kalyan metro construction start after monsoon". Indian Express. 7 August 2019. Retrieved 10 August 2019.
  28. ^ "First Escalator in Kandivali East Bandongri Metro 7 station". Free Press Journal. 13 August 2019. Retrieved 15 August 2019.
  29. ^ "PM Modi lays foundation stone for three metro lines in Mumbai". India Today. 7 September 2019. Retrieved 8 September 2019.
  30. ^ "EVen as Mumbai Residents oppose elevated metro corridor say it's impossible to go underground". Hindustan Times. 11 September 2017. Retrieved 12 September 2017.
  31. ^ "Bombay HC allows MMRDA to cut 86 mangroves for Metro Line-2B". Hindustan Times. 19 August 2020. Retrieved 20 August 2020.
  32. ^ "Mumbai:Drunk 28-Year-old Goregaon resident dies after ramming bike into a metro pillar in malad". DNA. 30 September 2018. Retrieved 1 October 2018.
  33. ^ "MMRDA appoints contractors for Metro 2B and Metro 4 works for Rs 250 Billion". Business Standard. 3 March 2018. Retrieved 5 March 2018.
  34. ^ "Maharashtra Cabinet gives go-ahead for two Metro lines". Financial Express. 27 September 2016. Retrieved 28 September 2016.
  35. ^ "LBS residents slow metro work causing inconvenience". Free Press Journal. 13 February 2020. Retrieved 15 February 2020.
  36. ^ "Bhiwandi residents oppose Metro 5". The Asian Age. 1 August 2018. Retrieved 5 August 2018.
  37. ^ "MMRDA plans themed metro stations". DNA. 30 March 2018. Retrieved 1 April 2018.
  38. ^ "Will Mumbaiites wait for Metro network get longer?". Hindustan Times. 31 October 2020. Retrieved 1 November 2020.
  39. ^ "Metro may run over two proposed transport projects". The Times of India. 21 November 2014. Retrieved 22 November 2014.
  40. ^ "Metro station at Chakala may be renamed JB Nagar". The Times of India. 8 March 2014. Retrieved 10 March 2014.
  41. ^ "Charkop Car Depot to now house metro 7 and metro 2A:MMRDA". Mumbai Live. 23 January 2020. Retrieved 25 January 2020.
  42. ^ "Mumbai gets nearly Rs 4000 cr plan to decongest metro station areas ahead of state polls". ThePrint. 10 August 2019. Retrieved 15 August 2019.
  43. ^ "CSMT Metro III station at Fort to get underground link". The Times of India. 9 February 2018. Retrieved 10 February 2018.
  44. ^ "Watch: Mumbai Metro releases 'breathtaking' view of upcoming CSMT station". Mumbai Mirror. 14 October 2019. Retrieved 15 October 2019.
  45. ^ "Metro Work to disrupt traffic on Jamshedji Tata Road". DNA. 29 July 2017. Retrieved 30 July 2017.
  46. ^ "Work starts on one more underground mumbai metro corridor". The Times of India. 6 March 2020. Retrieved 10 March 2020.
  47. ^ "38 of tunnelling for mumbai's underground metro completed". Hindustan Times. 14 February 2019. Retrieved 15 February 2019.
  48. ^ "Cuffe Parade Stn on Metro 3 line to have 192 parking slots". Hindustan Times. 5 March 2020. Retrieved 15 March 2020.
  49. ^ "Tender Announced 4.43MW rooftop solar mumbai metro station". Merecom. 26 March 2020. Retrieved 30 March 2020.
  50. ^ "Watch Mumbai Metro 3 Work, MMRC achieves 32nd breakthrough at Dadar metro station". Mumbai Mirror. 5 October 2020. Retrieved 6 October 2020.
  51. ^ "Problem in Getting Car Shed at Dahisar gives birth to a semi-circular metro line". Mumbai Mirror. 9 September 2020. Retrieved 10 September 2020.
  52. ^ "Plans to extend metro stations to bhayander may be implemented soon". DNA. 25 February 2017. Retrieved 26 February 2017.
  53. ^ "Power loom town of bhiwandi awaits metro connect". Hindustan Times. 20 July 2018. Retrieved 25 July 2018.
  54. ^ "Colaba-Bandra-Seepz line: A 170-m Metro tunnel that will go right under Mithi river". The Indian Express. 13 May 2019. Retrieved 15 May 2019.
  55. ^ "MMRDA invites tenders for design construction of stations viaducts for new metro routes". Indian Express. 5 January 2017. Retrieved 6 January 2017.
  56. ^ "BMC's flyover plan hits metro-2 roadblock". DNA. 2 July 2015. Retrieved 3 July 2015.
  57. ^ "Bad Roads/No Roads at Metro Station". The Times of India. 5 September 2020. Retrieved 6 September 2020.
  58. ^ "TMC bites into 40 ha of ecozone for Metro carshed". Mumbai Mirror. 24 March 2019. Retrieved 25 March 2019.
  59. ^ "Metro 5 corridor route to be changed eknath shinde". The Indian Express. 2 February 2020. Retrieved 3 February 2020.
  60. ^ "Metro work barricades add to Mumbaikar's commute woes". The Hindu. 3 June 2019. Retrieved 4 June 2019.
  61. ^ "Pillars of metro line 2A and 7 to be numbered for landmarks". Free Press Journal. 4 December 2020. Retrieved 5 December 2020.
  62. ^ "Ropeway to link DN Nagar-Dahisar Metro 2A with Gorai across creek". The Times of India. 9 January 2020. Retrieved 10 January 2020.
  63. ^ "Mumbai: Deviation in MMRDA ropeway alignment". Free Press Journal. 9 July 2020. Retrieved 10 July 2020.
  64. ^ "Mumbai: MMRDA issues tender for ropeway project". Free Press Journal. 19 February 2020. Retrieved 20 February 2020.
  65. ^ "Expect smooth commute soon work on DN Nagar Mankhurd metro line to start this Jan". Hindustan Times. 14 November 2017. Retrieved 15 November 2017.
  66. ^ "Wadala Kasarvadavli metro to be extended till gaimukh". The Times of India. 12 January 2018. Retrieved 15 January 2018.
  67. ^ "Bringing Thane & Dombivali Closer to Mumbai, Here's How MMR Locals Can Benefit from 3 New Metro Lines". News18. 7 September 2019. Retrieved 8 September 2019.
  68. ^ "12 Connectors from Mumbai metros to railway stations". Hindustan Times. 14 July 2020. Retrieved 15 July 2020.
  69. ^ "Route elevated corridor through eastern express highway Ghatkopar residents demand change in metro 4 alignment". Indian Express. 2 July 2018. Retrieved 5 July 2018.
  70. ^ "Commuters can expect relief at mumbai's ghatkopar metro starting today". Hindustan Times. 23 September 2019. Retrieved 25 September 2019.
  71. ^ "Kalbadevi, Girgaon, Acharya Atre stations lag in metro network". Free Press Journal. 11 July 2020. Retrieved 12 July 2020.
  72. ^ "Mumbai:Road Caves in at metro 3 site near girgaon station no one hurt". Hindustan Times. 16 September 2020. Retrieved 20 September 2020.
  73. ^ "Godrej Construction focusing more on infrastructure as realty slowdown bites". The Economic Times. 22 September 2019. Retrieved 23 September 2019.
  74. ^ "MMRDA Mulling realigning bhiwandi-kalyan stretch of metro 5 corridor". Business Standard. 31 January 2020. Retrieved 1 February 2020.
  75. ^ "Villagers oppose MMRDA move to acquire land for metro 5". Mumbai Mirror. 13 October 2019. Retrieved 15 October 2019.
  76. ^ "German Bank Extends Credit line for 2 lines of Mumbai Metro". Indian Express. 7 November 2020. Retrieved 8 November 2020.
  77. ^ "Mumbai Metro 3 Work on city to get 20 temporary roads". Hindustan Times. 3 March 2018. Retrieved 5 March 2018.
  78. ^ "Metro-III corridor: What lies ahead". Free Press Journal. 28 December 2019. Retrieved 29 December 2019.
  79. ^ "Metro Tunnel at heritage area completed". The Times of India. 17 October 2020. Retrieved 20 October 2020.
  80. ^ "Two Mumbai Metro lines to get 187 escalators". Hindustan Times. 14 August 2019. Retrieved 15 August 2019.
  81. ^ "Locals want CM to make metro 6 underground". Hindustan Times. 14 January 2020. Retrieved 15 January 2020.
  82. ^ "DNA Follow-Up: When high-speed railway meets suburban, Metro". DNA. 25 July 2019. Retrieved 26 July 2019.
  83. ^ "Brace Yourself for Mumbai metros biggest Junction station at BKC". Mid-Day. 3 March 2020. Retrieved 5 March 2020.
  84. ^ "The ground report: Going deep inside Mumbai's under-river metro tunnel". Business Standard. 2 March 2020. Retrieved 3 March 2020.
  85. ^ "Metro 2B on SV Road will be disastrous, say experts". Mumbai Mirror. 12 June 2017. Retrieved 13 June 2017.
  86. ^ "MMRDA orders 12 more train sets for Mumbai Metro-2 and 7 extension". Hindustan Times. 25 November 2020. Retrieved 26 November 2020.
  87. ^ "Now Cycle away from the metro station". The Hindu. 24 February 2020. Retrieved 25 February 2020.
  88. ^ "Water supply affected in Jogeshwari, Ghatkopar and Andheri due to pipeline repair work following caused by Damaged during the piling work on Mumbai Metro 6". Mumbai Mirror. 1 February 2020. Retrieved 2 February 2020.
  89. ^ "Metro 6, Jogeshwari flyover may have common piers". Indian Express. 1 June 2017. Retrieved 2 June 2017.
  90. ^ "Shiv Sena minister asks MMRDA to name Mumbai metro station after Bal Thackeray trauma centre". Hindustan Times. 21 May 2017. Retrieved 22 May 2017.
  91. ^ "MMRDA Won't Build Entire Bal Thackeray Flyover At Jogeshwari". Mid-Day. 4 May 2019. Retrieved 5 May 2019.
  92. ^ "30 Buildings make way for two metro stations and three high rises". The Times of India. 18 March 2019. Retrieved 20 March 2019.
  93. ^ "Crucial Mumbai Metro projects get Fadnavis govt approval". India Today. 25 October 2017. Retrieved 26 October 2017.
  94. ^ "MMRDA picks contractor for civil work of Metro 5". The Hindu. 7 August 2019. Retrieved 8 August 2019.
  95. ^ "Metro Line 5 Phase 1 deadline revised to 2024". Free Press Journal. 12 October 2020. Retrieved 15 October 2020.
  96. ^ "Save landmark, change metro route:Kalyan residents". Hindustan Times. 14 December 2019. Retrieved 15 December 2019.
  97. ^ "Mumbai: MMRDA revises deadline for Metro Line 2A to May 2021". Free Press Journal. 15 July 2020. Retrieved 16 July 2020.
  98. ^ "With Car Shed at Kanjurmarg new mumbai metro corridor could now connect to thane towns". ThePrint. 19 October 2020. Retrieved 20 October 2020.
  99. ^ "Metro-6 in Mumbai to be at a height of 38m above ground". Hindustan Times. 21 June 2019. Retrieved 22 June 2019.
  100. ^ "Metro lines 4 and 5 to be linked at station in Thane". Hindustan Times. 17 June 2019. Retrieved 20 June 2019.
  101. ^ "Wadala Thane metro line clears CRZ Hurdle". Mumbai Mirror. 27 February 2017. Retrieved 1 March 2017.
  102. ^ "MMRDA Picks contractor for civil work of Metro 5". The Hindu. 7 August 2019. Retrieved 10 August 2019.
  103. ^ "Plans to expand Metro connectivity in progress". DNA. 18 May 2019. Retrieved 19 May 2019.
  104. ^ "Mumbai First station structure ready on Metro 2A". DNA. 13 April 2018. Retrieved 15 April 2018.
  105. ^ "Mumbai: Skywalks Located On SV Road Across Three Suburbs To Make Way For Metro 2". Mid-Day. 13 April 2019. Retrieved 14 April 2019.
  106. ^ "MMRDA approves two Metro corridors". The Hindu. 20 October 2016. Retrieved 21 October 2016.
  107. ^ "MMRDA starts installing escalators for Metro Line 7". Mumbai Mirror. 21 September 2020. Retrieved 22 September 2020.
  108. ^ "Mumbai Metro scraps plan for Kurla terminus and MMRDA stations". The Times of India. 17 September 2020. Retrieved 20 September 2020.
  109. ^ "Bombay HC allows MMRDA to carry out construction of Metro Line 4". Mumbai Mirror. 6 August 2020. Retrieved 7 August 2020.
  110. ^ "MMRDA, BEST join hands to ensure smooth travel along Metro-7 corridor". Free Press Journal. 19 December 2015. Retrieved 20 December 2015.
  111. ^ "Mumbai: Metro 6 Corridor Moves Ahead With Launch Of Girders". Mid-Day. 13 November 2020. Retrieved 14 November 2020.
  112. ^ "Mumbai Metro 3 Line:Mahalaxmi Racecourse land used to build temporary bypass divert traffic". Hindustan Times. 28 January 2018. Retrieved 30 January 2018.
  113. ^ "Mumbai: Two new contractors appointed for balance civil works on Metro Line 7". The Times of India. 16 May 2020. Retrieved 17 May 2020.
  114. ^ "Uninstalled escalators for Metro Line 7 lying on road; inconveniences commuters". Mumbai Mirror. 6 August 2020. Retrieved 7 August 2020.
  115. ^ "Mumbai: 4 malls, complexes seek FOBs from Metro stations". The Times of India. 13 September 2020. Retrieved 14 September 2020.
  116. ^ "MMRDA to plant 4444 saplings Bombay HC Nod for felling 357 mangrove trees for metro line 4". The Indian Express. 6 August 2020. Retrieved 10 August 2020.
  117. ^ "MMRDA nod to two proposals to connect Aarey poisar metro stations and commercial hubs". Indian Express. 17 September 2020. Retrieved 18 November 2020.
  118. ^ "Mumbai: 25-year-old worker crushed to death by metro girder". Free Press Journal. 2 November 2019. Retrieved 3 November 2019.
  119. ^ "Thane residents see no end to road mess". Hindustan Times. 1 November 2019. Retrieved 2 November 2019.
  120. ^ "Thane: 24 hour water cut scheduled for city residents this Friday". Mumbai Mirror. 16 September 2020. Retrieved 17 September 2020.
  121. ^ "Report Iron rod bends downward at the metro site in malad". DNA. 18 May 2018. Retrieved 20 May 2018.
  122. ^ "Construction work on Metro 2B and 4 set to begin". Indian Express. 17 February 2018. Retrieved 20 February 2018.
  123. ^ "Rs 393 crore contract to build five metro stations scrapped". DNA. 20 September 2018. Retrieved 25 September 2018.
  124. ^ "Mumbai Metro-4: Controversial land proposal tabled again by Thane civic body". Hindustan Times. 20 November 2020. Retrieved 21 November 2020.
  125. ^ "Metro 3 cuts its pathtowards smoother travel tunneling of two metro 3 stations to be completed by Dec 12". Hindustan Times. 9 December 2019. Retrieved 10 December 2019.
  126. ^ "Mumbai Activist alleges MMOPL did not provided name change of metro station". Mid-Day. 27 May 2019. Retrieved 30 May 2019.
  127. ^ "Mumbai: Mira-Bhayandar to have Metro rail connectivity soon". Free Press Journal. 5 September 2017. Retrieved 6 December 2017.
  128. ^ "Mumbai Metro Eyes commercial development in MIDC and Girgaon". The Hindu. 2 April 2017. Retrieved 15 January 2018.
  129. ^ "Maharashtra government clears Mankhurd, Kasarvadavali metro projects". The Economic Times. 20 November 2014. Retrieved 21 November 2014.
  130. ^ "Tata Projects bag Rs 1,048 crore Mumbai Metro packages". The Economic Times. 13 April 2018. Retrieved 14 April 2018.
  131. ^ "To Keep Fares low MMRDA Asks eight malls to pitch in". Indian Express. 6 June 2019. Retrieved 10 June 2019.
  132. ^ "Mumbai Metro 3 Achieves 28th tunnel breakthrough". The Times of India. 30 April 2020. Retrieved 1 May 2020.
  133. ^ "What FSI hike around Metro stations will mean: pilot study near Nanavati". Indian Express. 25 September 2009. Retrieved 26 September 2009.
  134. ^ "Khar residents' ultimatum: Push Mumbai Metro line underground or we will vote for NOTA". Free Press Journal. 6 October 2018. Retrieved 7 October 2018.
  135. ^ "Mumbai Metro elevated line 4: Tata Projects wins orders worth Rs 1,048 crore; connectivity to Thane to improve". Financial Express. 13 April 2018. Retrieved 14 April 2018.
  136. ^ "Mumbai: Peeved Motorists Tell MMRDA To Repair Andheri Road Ruined During Metro Construction". Mid-Day. 1 August 2020. Retrieved 2 August 2020.
  137. ^ "Mumbai Metro MMRDA to change alignment of pandhurangwadi station". Indian Express. 7 October 2020. Retrieved 10 October 2020.
  138. ^ "Officials start casting of piers for metro line 9 near Pandhurang Wadi". Mumbai Live. 18 November 2020. Retrieved 20 November 2020.
  139. ^ "Mumbai: Iconic Entrance Gate At Dahisar To Be Brought Down For Metro Line 9". Mid-Day. 5 October 2020. Retrieved 6 October 2020.
  140. ^ "Everyone wants Metro, but not in their backyard". Mumbai Mirror. 12 June 2018. Retrieved 13 June 2018.
  141. ^ "Metro 6 Line will Cause Traffic Havoc:experts". Mumbai Mirror. 8 September 2018. Retrieved 10 September 2018.
  142. ^ "DN Nagar-BKC Metro work to kick off by Feb '18". DNA. 14 November 2017. Retrieved 15 November 2017.
  143. ^ "MMRDA to consider civic body's demand change in Metro 5 alignment on cards". The Indian Express. 16 December 2017. Retrieved 20 December 2017.
  144. ^ "MMRDA approves two Metro corridors". The Hindu. 20 October 2016. Retrieved 2 December 2016.
  145. ^ "IIT Vikhroli Metro Stretch work to worsen traffic snarls". DNA. 30 November 2017. Retrieved 1 December 2017.
  146. ^ "DB Engineering-Louis Berger bags contract for Mumbai Metro 4". DNA. 10 April 2018. Retrieved 11 April 2018.
  147. ^ "Mumbai Metro work blocks link road at night". DNA. 22 July 2018. Retrieved 25 July 2018.
  148. ^ "Kalyan Metro a distant dream". The Asian Age. 14 December 2018. Retrieved 15 December 2018.
  149. ^ "Underground bridge to ensure continuous water supply during sahar metro station work". The Times of India. 13 February 2018. Retrieved 15 February 2018.
  150. ^ "CM Visits Metro 3 station at Sahar Road". Hindustan Times. 1 March 2020. Retrieved 5 March 2020.
  151. ^ "Double-Decker Metro Corridor for Mira Bhayandar by 2022". Free Press Journal. 14 January 2020. Retrieved 15 January 2020.
  152. ^ "Mumbai: 25-Year-old from Bihar commits suicide at Sakinaka metro station". DNA. 19 September 2016. Retrieved 20 September 2016.
  153. ^ "MMRDA Initiates plan to Merge two metro corridors". Indian Express. 13 October 2020. Retrieved 14 October 2020.
  154. ^ "Two Mumbai Metro lines to get 187 escalators". Hindustan Times. 14 August 2019. Retrieved 15 August 2019.[dead link]
  155. ^ "Construction of 26 underground stations of metro 3 is on speed". Mumbai Live. 21 May 2020. Retrieved 25 May 2020.
  156. ^ "Juhu locals crowdfunding fight against Metro". DNA. 1 April 2019. Retrieved 2 April 2019.
  157. ^ "Prime Properties nearby to get special access". Mumbai Mirror. 8 January 2020. Retrieved 10 January 2020.
  158. ^ "100 percent tunneling work completed at SEEPZ station". Metro Rail News. 14 December 2019. Retrieved 20 October 2020.
  159. ^ "City's first underground Metro to be elevated as well". Mumbai Mirror. 13 October 2020. Retrieved 14 October 2020.
  160. ^ "MMRDA Metro 2B will require cutting of 1134 trees and transplantation of 1670 trees". Mumbai Mirror. 11 December 2019. Retrieved 15 December 2019.
  161. ^ "Mumbai metro sees investment of Rs 62,943 crore". 25 December 2017. Retrieved 26 December 2017.
  162. ^ "Mumbai: Everything you need to know about Metro 2B and Metro 4". Free Press Journal. 1 December 2016. Retrieved 2 December 2016.
  163. ^ "Mumbai Metro 7 to miss Dec deadline: Delay in works, removal of contractor may delay completion". Indian Express. 7 February 2020. Retrieved 8 February 2020.
  164. ^ "Mumbai: 'Two Metro Lines To Be Ready Next Year', Says MMRDA". Mid-Day. 11 September 2020. Retrieved 12 September 2020.
  165. ^ "Metro work halts for audit of 'damaged' Mahim building". The Times of India. 12 November 2019. Retrieved 15 November 2019.
  166. ^ "After Mahim building tilts, Supreme Court asks Metro to give report on South Mumbai station". Times of India. 22 November 2019. Retrieved 25 November 2019.
  167. ^ "Station at 48 metres to give bird's eye view of Chembur". DNA. 7 December 2010. Retrieved 10 December 2010.
  168. ^ "Mumbai Metro to reach Virar". Hindustan Times. 4 October 2018. Retrieved 5 October 2018.
  169. ^ "LBS Marg to be shut for Metro-4 work". The Asian Age. 19 March 2018. Retrieved 20 March 2018.
  170. ^ "Design consultant for Mumbai Metro-7". Business Line. 17 January 2018. Retrieved 18 January 2018.
  171. ^ "Tallest in country MMRDA to deploy 29.5-m tall straddle carrier to launch girders on Metro 6". Indian Express. 29 August 2020. Retrieved 30 August 2020.
  172. ^ "Common station at Kurla for Metro 2B and Metro 4". The Hindu. 22 May 2019. Retrieved 23 May 2019.
  173. ^ "Siddhivinayak Metro III station space likely to be leased out". Free Press Journal. 6 November 2019. Retrieved 10 November 2019.
  174. ^ "BJP Corporator wants to rename Sonapur metro station after RSS founder". DNA. 11 November 2018. Retrieved 15 November 2018.
  175. ^ "Mira-Bhayandar Municipal Corporation pushes to name Metro stns after Shivaji, Patel, Pratap". DNA. 18 December 2017. Retrieved 19 December 2017.
  176. ^ "Mumbai Metro 4 Alignment changed once again". DNA. 6 May 2016. Retrieved 10 May 2016.
  177. ^ "BMC Chief clears cutting of 18 trees in chembur for metro line 4". The Times of India. 30 September 2020. Retrieved 1 October 2020.
  178. ^ "Mumbai:Lokhandwala residents face interminable traffic jams as illegal parking compounds Metro Rail woes". Mumbai Mirror. 28 January 2019. Retrieved 29 January 2019.
  179. ^ "Mumbai Metro Phase 4 may cover entire Ghodbunder Road stretch in Thane". Hindustan Times. 3 February 2017. Retrieved 5 February 2017.
  180. ^ "Mumbai gets two more Metro lines". Business Standard. 25 October 2017. Retrieved 26 October 2017.
  181. ^ "Mumbai Metro 7 worksite iron rods fall on the best bus at Thakur complex of Western Express Highway". DNA. 17 August 2018. Retrieved 20 August 2018.
  182. ^ "Mumbai: Man Dies After Barricade Falls On Bike, Kin Say Arrest Contractor". Mid-Day. 14 September 2020. Retrieved 15 September 2020.
  183. ^ "Maha Cabinet gives go-ahead for two Metro lines". India Today. 27 September 2016. Retrieved 28 September 2016.
  184. ^ "Versova Ghatkopar Metro 1 faced 13 Door Snags in 2016-17". DNA. 31 March 2018. Retrieved 1 April 2018.
  185. ^ "Subway to connect Mantralaya to Vidhan Bhavan Metro 3 station". Hindustan Times. 5 November 2019. Retrieved 10 November 2019.
  186. ^ "Party offices near Vidhan Bhavan to relocate for metro station". The Economic Times. 27 January 2015. Retrieved 28 January 2015.
  187. ^ "Building Direct subways to metro 3 corridor stations may hit the hurdle of high premium". Indian Express. 13 December 2019. Retrieved 15 December 2019.
  188. ^ "Thane mayor Naresh Mhaske opposes tree-cutting for metro 4 route". Financial Express. 29 November 2019. Retrieved 30 November 2019.
  189. ^ "Mumbai's Metro 6 route must be scrapped metro 3 line extended instead say activists". Hindustan Times. 20 May 2019. Retrieved 25 May 2019.
  190. ^ "Plan for 4 Metros to converge at 2-deck Kanjurmarg depot". The Times of India. 22 October 2020. Retrieved 23 October 2020.
  191. ^ "With 'marsh plot' boundary, Metro car shed work begins". Mumbai Mirror. 27 October 2020. Retrieved 28 October 2020.
  192. ^ "Who owns the Mumbai Metro car depot land?". India Today. 5 November 2020. Retrieved 6 November 2020.
  193. ^ "Mumbai:Vikhroli metro station to tower over EEH and JVLR". Mid-Day. 27 May 2019. Retrieved 30 May 2019.
  194. ^ "Mumbai: MMRDA proposes nine FOBs on Metro line 7". Free Press Journal. 12 March 2020. Retrieved 13 March 2020.
  195. ^ "GST bhavan and Wadala station to be merged". The Hindu. 15 January 2020. Retrieved 20 January 2020.
  196. ^ "Metro 7 line to have 14 stations along Western Express Highway". The Asian Age. 2 January 2018. Retrieved 5 January 2018.
  197. ^ "Aadtiya Thackeray witnesses 25th breakthrough at Worli metro station". Mid-Day. 29 January 2020. Retrieved 30 January 2020.
  198. ^ "Passengers will get facilities like spa and salon at mumbai metro stations". Navbharat Times. 19 February 2020. Retrieved 20 February 2020.
  199. ^ "MMRDA places order for 72 Metro coaches". The Times of India. 25 November 2020. Retrieved 26 November 2020.
  200. ^ "Mira-Bhayandar metro rail work finally begins". Free Press Journal. 10 September 2019. Retrieved 11 September 2019.
[edit]