Jump to content

SEEPZ metro station

Coordinates: 19°07′52″N 72°52′37″E / 19.13105°N 72.87707°E / 19.13105; 72.87707
From Wikipedia, the free encyclopedia


SEEPZ

सीप्झ
Mumbai Metro station
General information
Location1, Sariput Nagar, Rup Nagar, Goregaon, Mumbai, Maharashtra 400065
Coordinates19°07′52″N 72°52′37″E / 19.13105°N 72.87707°E / 19.13105; 72.87707
Owned byMumbai Metro Rail Corporation Ltd. (MMRCL)
Operated byMumbai Metro
Line(s)Line 3
PlatformsIsland platform
Platform-1 → Bandra Kurla Complex
Platform-2 → Aarey JVLR
Tracks2
Construction
Structure typeUnderground, Double track
Platform levels2
Parking(TBC)
Other information
StatusStaffed, Operational
Station codeSEPZ
History
Opened05 October 2024; 2 months ago (05 October 2024)
Electrified25 kV 50 Hz AC overhead catenary
Services
Preceding station Logo of the Delhi Metro Mumbai Metro Following station
Aarey JVLR
Terminus
Line 3 MIDC - Andheri
Line 3
(Future Service)
MIDC - Andheri
Location
Map

SEEPZ is an underground metro station on the North-South corridor of the Aqua Line 3 of Mumbai Metro in Mumbai, India.

This metro station was inaugurated on October 05 2024 by Prime Minister Narendra Modi, followed by the commencement of the metro service from October 07 2024.[1][2][3][4]

Station Layout

[edit]
SEEPZ track layout
P1
P2
Station with two tracks and one Island platform
G Street level Exit/ Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
P Platform 1
Southbound
Towards → Bandra - Kurla Complex
Next Station: MIDC - Andheri
Island platform | Doors will open on the right Disabled access
Platform 2
Northbound
Towards ← Aarey JVLR
P

Connections

[edit]

Entry/Exit

[edit]
SEEPZ metro station exits [5]
Gate A1 Gate A2 Gate B1 Gate B2
SEEPZ Gate No. 1 SEEPZ Bus Depot SEEPZ Gate No. 3 MIDC Central Road
MIDC Andheri JVLR Road MIDC Central Road Power System Operation Control

See also

[edit]

References

[edit]
  1. ^ News, NDTV Profit (7 October 2024). "Mumbai Metro Line 3 Opens: Check Stations, Route, Fare, Timings And More". NDTV Profit. Retrieved 6 November 2024. {{cite web}}: |last= has generic name (help)
  2. ^ "Mumbai Metro-3 Second Phase On Track: Aarey-BKC Services Begin, Link To Cuffe Parade May Be Ready by 2025". News18. Retrieved 6 November 2024.
  3. ^ "Mumbai's first underground metro route 'line 3' opens for public today". The Times of India. 7 October 2024. ISSN 0971-8257. Retrieved 6 November 2024.
  4. ^ "Mumbai's first underground metro line from Aarey to BKC now open for public – Check stations, timings, fares for Mumbai Metro Line 3 here". Financialexpress. 7 October 2024. Retrieved 6 November 2024.
  5. ^ "Mumbai Metro Rail Corporation Limited | Govt. of Maharashtra". Retrieved 9 November 2024.
[edit]