Jump to content

Line 9 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia
(Redirected from Chunhua Ave. station)

Line 9
Line 9 Train on Jiahua Metro Bridge
Overview
Native name重庆轨道交通9号线
StatusOperational
Line number9
LocaleChongqing, China
Termini
Stations31 (29 in operation)
Websitehttps://www.cqmetro.cn
Service
TypeRapid transit
SystemChongqing Rail Transit
Services1
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
Depot(s)Xinqiao, Taiwan Industrial Park, Huashigou
History
Opened25 January 2022; 2 years ago (2022-01-25)[1]
Technical
Line length32.29 km (20.06 miles)[2][3] (Phase 1)
7.8 km (4.8 miles)[4] (Phase 2)
Number of tracks2
CharacterMostly underground with little sections elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead line1,500 V DC
Operating speed100 km/h (62 mph) (Maximum)
Route map

Xinqiao depot
Xinqiao
Gaotanyan
Tianlilu
Shapingba
Bus interchange China Railway      Loop line      Line 1
Xiaolongkan
     Line 1
Tuwan
Hongyancun
Fuhualu
Hualongqiao
Lijiaping
Mahuangliang
Guanyinqiao
     Line 3
Liyuchi
     Line 10
Liujiatai
Jiangbeicheng
     Line 6
Wulidian
     Loop line      Line 6
Gailanxi
Toutang
     Line 4
Baoshuigang
     Line 4
Cruise Port
Hejialiang
Shipanhe
Shangwanlu
     Line 10
Taiwan Industrial Park depot
Qinggangping
Baoshenghu
Xingke Ave.
Chunhua Ave.
Langui Ave.
Central Park East
     Line 10
Congyansi
Huashigou
Huashigou depot
=
Virtual interchange: transport
card only, re-entry required.

Line 9 of CRT is a rapid transit line in Chongqing, China.

History

[edit]

The line began construction on September 28, 2016.

Opening timeline

[edit]
Segment Commencement Length Station(s) Name
GaotanyanXingke Ave.[a][1] 25 January 2022 31.3 km (19.4 mi) 23 Phase 1
Baoshenghu 28 July 2022[5] infill station 1
Xingke Ave.Huashigou 18 January 2023 7.8 km (4.8 mi)[6] 5 Phase 2
  1. ^ except Cruise Port and Baoshenghu stations.

Stations

[edit]
Service
routes
Station
No.
Station name Connections Distance
km
Location
English Chinese
9
01
Xinqiao 新桥 - 0.0 Shapingba
9
02
Gaotanyan 高滩岩 1.9 1.9
9
03
Tianlilu 天梨路 1.2 3.0
9
04
Shapingba 沙坪坝      Line 1      Loop line  27 
Shapingba railway station CYW
1.3 4.3
9
05
Xiaolongkan 小龙坎      Line 1 1.0 5.3
9
06
Tuwan 土湾 1.1 6.3
9
07
Hongyancun 红岩村      Line 5 1.2 7.6 Yuzhong
9
08
Fuhualu 富华路      Line 18 1.1 8.7
9
09
Hualongqiao 化龙桥 1.9 10.6
9
10
Lijiaping 李家坪 1.6 12.2 Jiangbei
9
11
Mahuangliang 蚂蝗梁 0.9 13.0
9
12
Guanyinqiao 观音桥      Line 3[a] 1.0 14.0
9
13
Liyuchi 鲤鱼池      Line 10 1.7 15.7
9
14
Liujiatai 刘家台 1.2 16.9
9
15
Jiangbeicheng 江北城      Line 6 1.0 17.9
9
16
Wulidian 五里店      Line 6      Loop line 1.2 19.1
9
17
Gailanxi 溉澜溪 1.0 20.1
9
18
Toutang 头塘      Line 4 1.7 21.9
9
19
Baoshuigang 保税港      Line 4 1.4 23.2
9
20
Cruise Port 邮轮母港 0.9 24.1
9
21
Hejialiang 何家梁 0.7 24.8
9
22
Shipanhe 石盘河 1.6 26.4 Yubei
9
23
Shangwanlu 上湾路      Line 10 1.9 28.3
9
24
Qinggangping 青岗坪 1.7 30.0
9
25
Baoshenghu 宝圣湖  15  2.0 32.0
9
26
Xingke Ave. 兴科大道 1.2 33.2
9
27
Chunhua Ave. 春华大道 2.3 35.5
9
28
Langui Ave. 兰桂大道 1.0 36.5
9
29
Central Park East 中央公园东      Line 10 1.2 37.6
9
30
Congyansi 丛岩寺 2.6 40.2
9
31
Huashigou 花石沟 1.1 41.3
  1. ^ out of system transfer

Station details

[edit]

Xingke Ave. station

[edit]

Xingke Ave. station[7] (Chinese: 兴科大道站; pinyin: Xīngkēdàdào zhàn) is located in the Yubei District. The station opened on January 25, 2022.[8] There are four exits for this station. Currently only two exits (numbered 1 and 3) are opening.[9]

[edit]

References

[edit]
  1. ^ a b "轨道九号线一期本月开通运营". 本月即将开通运营23个车站,新桥站、邮轮母港站、宝圣湖站3个站点暂不开放
  2. ^ "赛迪工程咨询监理的重庆轨道交通9号线即将开通运营". Archived from the original on April 17, 2022. 全长32.289km;共设站26座,本次开通的车站23座
  3. ^ "重庆轨道交通9号线25个站安装完成 开始调试". September 21, 2021.
  4. ^ "进展顺利!重庆地铁9号线二期工程进入铺轨阶段". November 5, 2021.
  5. ^ "重庆地铁9号线一期宝圣湖站28日14时开通运营".
  6. ^ "重庆地铁9号线二期通过项目工程验收". 重庆地铁9号线二期工程(兴科大道—花石沟)线路全长约7.8公里,共设5座车站
  7. ^ "重庆轨道交通运营线网图". cqmetro.cn. Archived from the original on April 17, 2022.
  8. ^ "赛迪工程咨询监理的重庆轨道交通9号线即将开通运营". Archived from the original on April 17, 2022.
  9. ^ "带你探站9号线——兴科大道站 回兴片区又多了一个轨道站". January 28, 2022. Archived from the original on June 21, 2022. Retrieved June 21, 2022.