Jump to content

Line 18 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia

Line 18
Line 18 train interior
Overview
Native name重庆轨道交通18号线
StatusPartially open
Line number18
LocaleChongqing, China
Termini
Stations19 (Phase 1)
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2023; 11 months ago (2023-12-28)
Technical
Line length29.016 km (18.0 mi)[1] (Phase 1)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead line
Route map

uncertain extension
Xiaoshizi
Kaixuanlu
Shibati
Qixinggang
Chongqing Station
Chongqing railway station
Caiyuanlu
Huangshaxi
Daping West
Fuhualu depot
Fuhualu
Xietaizi
Olympic Sports Center
Shipingqiao
Yangjiaping
2
Tanzikou
Huangjueping
Sichuan Fine Arts Institute
Dianchang
Lijiatuo Daqiao
Chongqing University of Technology
Huaxi Industrial Park
Babinlu Wetland Park
Qiezixi
Baijusi
Funiuxi
Jin'aosi depot
Jin'aoshan
Tiaodeng
Tiaodengnan
=
Virtual interchange: transport
card only, re-entry required.

Line 18 (formerly known as Line 5A) of CRT is a metro line in Chongqing, China. It is expected to be fully completed in 2028.

Stations

[edit]

Phase I

[edit]

Phase I of Line 18 started construction in 2 March 2021, and opened in 28 December 2023.[2] It is 29.016 km in length.[1]

Station
No.
Station name Connections Distance
km
Location
English[3] Chinese
18
01
Fuhualu 富华路      Line 9 - 0 Yuzhong
18
02
Xietaizi (Not currently open) 歇台子 (暂未开通)      Line 1      Line 5 2.053 Jiulongpo
18
03
Olympic Sports Center 奥体中心      Loop line 1.354
18
04
Shipingqiao 石坪桥 1.317
18
05
Yangjiaping 杨家坪      Line 2 1.270
18
06
Tanzikou 滩子口 1.617
18
07
Huangjueping 黄桷坪 China Railway CRW 1.367
18
08
Sichuan Fine Arts Institute 四川美术学院[4] 0.930
18
09
Dianchang 电厂 0.934
18
10
Lijiatuo Daqiao 李家沱大桥[4] 2.020 Ba'nan
18
11
Chongqing University of Technology 重庆理工大学[4] 1.116
18
12
Huaxi Industrial Park 花溪工业园[4] 1.728
18
13
Babinlu Wetland Park 巴滨路湿地公园[4] 1.996
18
14
Qiezixi 茄子溪 China Railway QXW 1.634 Dadukou
18
15
Baijusi 白居寺      Line 2 1.406
18
16
Funiuxi 伏牛溪 1.217
18
17
Jin'aoshan 金鳌山 2.180
18
18
Tiaodeng 跳磴      Line 5 Jiangtiao line 2.315
18
19
Tiaodengnan 跳磴南 1.676

Phase II

[edit]
  • Currently under construction[5]
Station
No.
Station name Connections Distance
km
Location
English Chinese
Xiaoshizi 小什字      Line 1      Line 6 Yuzhong
Kaixuanlu 凯旋路
Shibati 十八梯
Qixinggang 七星岗      Line 1  10 
Chongqing Station 重庆站  27  Chongqing railway station CQW
Caiyuanlu 菜袁路
Huangshaxi 黄沙溪
Daping West 大坪西

References

[edit]
  1. ^ a b "视频 离通车更近一步 重庆轨道交通18号线南段接触网送电成功". May 24, 2023.
  2. ^ "重庆18号线今日通车 市民下午2点可乘坐". cqcb.com. December 28, 2023. Retrieved December 28, 2023.
  3. ^ "重庆轨道交通线网图". Archived from the original on June 9, 2022.
  4. ^ a b c d e "重庆轨道交通18号线开启不载客试运行". September 6, 2023.
  5. ^ "重庆新开工4条轨道线路 看看这些站有没有经过你家". March 2, 2021.