Jump to content

Line 9 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ZandDev (talk | contribs) at 11:04, 5 June 2022 (+speed and website, Stations: fix background color and initial progressive mileage). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 9
Add→{{rail-interchange}}
Line 9 Train on Jiahua Metro Bridge
Overview
Native name重庆轨道交通9号线
StatusOperational
Line number9
LocaleChongqing, China
Termini
Stations31 (23 in operation)
Websitehttps://www.cqmetro.cn
Service
TypeRapid transit
SystemChongqing Rail Transit
Services1
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
Depot(s)Xinqiao, Taiwan Industrial Park, Huashigou
History
Opened25 January 2022; 2 years ago (2022-01-25)[1]
Technical
Line length32.29 km (20.06 mi)[2][3] (Phase 1, operational)
7.8 km (4.8 mi)[4] (Phase 2, under construction)
Number of tracks2
CharacterMostly underground with little sections elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead line
Operating speed100 km/h (Maximum)
Route map

Xinqiao depot
Xinqiao
Gaotanyan
Tianlilu
Shapingba
Bus interchange China Railway      Loop line      Line 1
Xiaolongkan
     Line 1
Tuwan
Hongyancun
Fuhualu
Hualongqiao
Lijiaping
Mahuangliang
Guanyinqiao
     Line 3
Liyuchi
     Line 10
Liujiatai
Jiangbeicheng
     Line 6
Wulidian
     Loop line      Line 6
Gailanxi
Toutang
     Line 4
Baoshuigang
     Line 4
Cruise Port
Hejialiang
Shipanhe
Shangwanlu
     Line 10
Taiwan Industrial Park depot
Qinggangping
Baoshenghu
Xingke Ave.
Chunhua Ave.
Langui Ave.
Central Park East
     Line 10
Congyansi
Huashigou
Huashigou depot
=
Virtual interchange: transport
card only, re-entry required.

Line 9 of CRT is a rapid transit line in Chongqing, China.

History

The line began construction on September 28, 2016.

Opening timeline

Segment Commencement Length Station(s) Name
GaotanyanXingke Ave.[a][1] 25 January 2022 31.3 km (19.45 mi) 23 Phase 1
  1. ^ except Cruise Port and Baoshenghu stations.

Stations

Phase I

Station
No.
Station name Connections Distance
km
Location
English Chinese
9/01 Xinqiao 新桥 - 0.0 Shapingba
9/02 Gaotanyan 高滩岩 1.9 1.9
9/03 Tianlilu 天梨路 1.2 3.0
9/04 Shapingba 沙坪坝 Add→{{rail-interchange}} Add→{{rail-interchange}} [a]
Add→{{rail-interchange}} (u/c)
1.3 4.3
9/05 Xiaolongkan 小龙坎 Add→{{rail-interchange}} 1.0 5.3
9/06 Tuwan 土湾 1.1 6.3
9/07 Hongyancun 红岩村 Add→{{rail-interchange}} (u/c) 1.2 7.6 Yuzhong
9/08 Fuhualu 富华路 Add→{{rail-interchange}} (u/c) 1.1 8.7
9/09 Hualongqiao 化龙桥 1.9 10.6
9/10 Lijiaping 李家坪 1.6 12.2 Jiangbei
9/11 Mahuangliang 蚂蝗梁 0.9 13.0
9/12 Guanyinqiao 观音桥 Add→{{rail-interchange}} [b] 1.0 14.0
9/13 Liyuchi 鲤鱼池 Add→{{rail-interchange}} 1.7 15.7
9/14 Liujiatai 刘家台 1.2 16.9
9/15 Jiangbeicheng 江北城 Add→{{rail-interchange}} 1.0 17.9
9/16 Wulidian 五里店 Add→{{rail-interchange}} Add→{{rail-interchange}} 1.2 19.1
9/17 Gailanxi 溉澜溪 1.0 20.1
9/18 Toutang 头塘 Add→{{rail-interchange}} 1.7 21.9
9/19 Baoshuigang 保税港 Add→{{rail-interchange}} 1.4 23.2
9/20 Cruise Port 邮轮母港 0.9 24.1
9/21 Hejialiang 何家梁 0.7 24.8
9/22 Shipanhe 石盘河 1.6 26.4 Yubei
9/23 Shangwanlu 上湾路 Add→{{rail-interchange}} 1.9 28.3
9/24 Qinggangping 青岗坪 1.7 30.0
9/25 Baoshenghu 宝圣湖 Add→{{rail-interchange}} (u/c) 2.0 32.0
9/26 Xingke Ave. 兴科大道 1.2 33.2
  1. ^ out of system transfer for both lines
  2. ^ out of system transfer

Phase II

Phase 2 of the line is currently under construction.[4]

Station
No.
Station name Connections Distance
km
Location
English Chinese
9/27 Chunhua Ave. 春华大道 Yubei
9/28 Langui Ave. 兰桂大道
9/29 Central Park East 中央公园东 Add→{{rail-interchange}}
9/30 Congyansi 从岩寺
9/31 Huashigou 花石沟

References

  1. ^ a b "轨道九号线一期本月开通运营". 本月即将开通运营23个车站,新桥站、邮轮母港站、宝圣湖站3个站点暂不开放
  2. ^ "赛迪工程咨询监理的重庆轨道交通9号线即将开通运营". Archived from the original on April 17, 2022. 全长32.289km;共设站26座,本次开通的车站23座
  3. ^ "重庆轨道交通9号线25个站安装完成 开始调试". September 21, 2021.
  4. ^ a b "进展顺利!重庆地铁9号线二期工程进入铺轨阶段". November 5, 2021.