Jump to content

Line 9 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Dpm853 (talk | contribs) at 06:41, 24 February 2022. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 9
Add→{{rail-interchange}}
Overview
Native name重庆轨道交通9号线
StatusOperational
Line number9
LocaleChongqing, China
Termini
Stations31 (23 in operation)
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
Depot(s)Xinqiao, Taiwan Industrial Park, Huashigou
History
Opened25 January 2022 (2022-01-25)[1]
Technical
Line length32.29 km (20.06 mi)[2] (Phase 1, operational)
7.8 km (4.8 mi)[3] (Phase 2, under construction)
Number of tracks2
CharacterMostly underground with little sections elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead line
Route map

Xinqiao depot
Xinqiao
Gaotanyan
Tianlilu
Shapingba
Bus interchange China Railway      Loop line      Line 1
Xiaolongkan
     Line 1
Tuwan
Hongyancun
Fuhualu
Hualongqiao
Lijiaping
Mahuangliang
Guanyinqiao
     Line 3
Liyuchi
     Line 10
Liujiatai
Jiangbeicheng
     Line 6
Wulidian
     Loop line      Line 6
Gailanxi
Toutang
     Line 4
Baoshuigang
     Line 4
Cruise Port
Hejialiang
Shipanhe
Shangwanlu
     Line 10
Taiwan Industrial Park depot
Qinggangping
Baoshenghu
Xingke Ave.
Chunhua Ave.
Langui Ave.
Central Park East
     Line 10
Congyansi
Huashigou
Huashigou depot
=
Virtual interchange: transport
card only, re-entry required.

Line 9 of CRT is a rapid transit line in Chongqing, China.

Stations

Phase I

Phase 1 of the line opened on 25 January 2022, except Template:CRT stations, Template:CRT stations and Template:CRT stations stations.[1]

Station
No.
Station name Connections Distance
km
Location
English Chinese
9/01 Template:CRT stations 新桥 - 0 Shapingba
9/02 Template:CRT stations 高滩岩 1.9 1.9
9/03 Template:CRT stations 天梨路 1.2 3.0
9/04 Template:CRT stations 沙坪坝 Add→{{rail-interchange}} Add→{{rail-interchange}} [a] 1.3 4.3
9/05 Template:CRT stations 小龙坎 Add→{{rail-interchange}} 1.0 5.3
9/06 Template:CRT stations 土湾 1.1 6.3
9/07 Template:CRT stations 红岩村 Add→{{rail-interchange}} 1.2 7.6 Yuzhong
9/08 Template:CRT stations 富华路 Add→{{rail-interchange}} 1.1 8.7
9/09 Template:CRT stations 化龙桥 1.9 10.6
9/10 Template:CRT stations 李家坪 1.6 12.2 Jiangbei
9/11 Template:CRT stations 蚂蝗梁 0.9 13.0
9/12 Template:CRT stations 观音桥 Add→{{rail-interchange}} [b] 1.0 14.0
9/13 Template:CRT stations 鲤鱼池 Add→{{rail-interchange}} 1.7 15.7
9/14 Template:CRT stations 刘家台 1.2 16.9
9/15 Template:CRT stations 江北城 Add→{{rail-interchange}} 1.0 17.9
9/16 Template:CRT stations 五里店 Add→{{rail-interchange}} Add→{{rail-interchange}} 1.2 19.1
9/17 Template:CRT stations 溉澜溪 1.0 20.1
9/18 Template:CRT stations 头塘 Add→{{rail-interchange}} 1.7 21.9
9/19 Template:CRT stations 保税港 Add→{{rail-interchange}} 1.4 23.2
9/20 Template:CRT stations 邮轮母港 0.9 24.1
9/21 Template:CRT stations 何家梁 0.7 24.8
9/22 Template:CRT stations 石盘河 1.6 26.4 Yubei
9/23 Template:CRT stations 上湾路 Add→{{rail-interchange}} 1.9 28.3
9/24 Template:CRT stations 青岗坪 1.7 30.0
9/25 Template:CRT stations 宝圣湖 2.0 32.0
9/26 Template:CRT stations 兴科大道 1.2 33.2
  1. ^ Out of system transfers
  2. ^ Both require out of system transfer

Phase II

Phase 2 of the line is currently under construction.[3]

Station
No.
Station name Connections Distance
km
Location
English Chinese
9/27 Template:CRT stations 春华大道 Yubei
9/28 Template:CRT stations 兰桂大道
9/29 Template:CRT stations 中央公园东 Add→{{rail-interchange}}
9/30 Template:CRT stations 从岩寺
9/31 Template:CRT stations 花石沟

References

  1. ^ a b "轨道九号线一期本月开通运营". 本月即将开通运营23个车站,新桥站、邮轮母港站、宝圣湖站3个站点暂不开放
  2. ^ "重庆轨道交通9号线25个站安装完成 开始调试". September 21, 2021.
  3. ^ a b "进展顺利!重庆地铁9号线二期工程进入铺轨阶段". November 5, 2021.