Jump to content

Line 9 (Chongqing Rail Transit): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Beipark (talk | contribs)
No edit summary
Bender the Bot (talk | contribs)
m top: HTTP to HTTPS for Wayback Machine, replaced: http://web.archive.org/ → https://web.archive.org/
Line 43: Line 43:
| linelength_km =
| linelength_km =
| linelength_mi =
| linelength_mi =
| linelength = {{convert|32.29|km|mile|abbr=on}}<ref name=cqsdjl>{{cite web|url=http://www.cqsdjl.com.cn/Portal/Home/Show/15/5015|title=赛迪工程咨询监理的重庆轨道交通9号线即将开通运营|archive-url=http://web.archive.org/web/20220417041009/http://www.cqsdjl.com.cn/Portal/Home/Show/15/5015|archive-date=2022-04-17|quote=全长32.289km;共设站26座,本次开通的车站23座}}</ref><ref name="Line9-2021">{{Cite news|url=http://cq.people.com.cn/n2/2021/0921/c365412-34923479.html|date=2021-09-21|title=重庆轨道交通9号线25个站安装完成 开始调试}}</ref> (Phase 1, operational)<br/>{{convert|7.8|km|mile|abbr=on}}<ref name="L9P2-2021">{{cite web|url=https://www.chinanews.com.cn/cj/2021/11-05/9602930.shtml|date=2021-11-05|title=进展顺利!重庆地铁9号线二期工程进入铺轨阶段}}</ref> (Phase 2, under construction)
| linelength = {{convert|32.29|km|mile|abbr=on}}<ref name=cqsdjl>{{cite web|url=http://www.cqsdjl.com.cn/Portal/Home/Show/15/5015|title=赛迪工程咨询监理的重庆轨道交通9号线即将开通运营|archive-url=https://web.archive.org/web/20220417041009/http://www.cqsdjl.com.cn/Portal/Home/Show/15/5015|archive-date=2022-04-17|quote=全长32.289km;共设站26座,本次开通的车站23座}}</ref><ref name="Line9-2021">{{Cite news|url=http://cq.people.com.cn/n2/2021/0921/c365412-34923479.html|date=2021-09-21|title=重庆轨道交通9号线25个站安装完成 开始调试}}</ref> (Phase 1, operational)<br/>{{convert|7.8|km|mile|abbr=on}}<ref name="L9P2-2021">{{cite web|url=https://www.chinanews.com.cn/cj/2021/11-05/9602930.shtml|date=2021-11-05|title=进展顺利!重庆地铁9号线二期工程进入铺轨阶段}}</ref> (Phase 2, under construction)
| tracklength_km=
| tracklength_km=
| tracklength_mi=
| tracklength_mi=

Revision as of 03:05, 27 April 2022

Line 9
Add→{{rail-interchange}}
Line 9 Train on Jiahua Metro Bridge
Overview
Native name重庆轨道交通9号线
StatusOperational
Line number9
LocaleChongqing, China
Termini
Stations31 (23 in operation)
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
Depot(s)Xinqiao, Taiwan Industrial Park, Huashigou
History
Opened25 January 2022 (2022-01-25)[1]
Technical
Line length32.29 km (20.06 mi)[2][3] (Phase 1, operational)
7.8 km (4.8 mi)[4] (Phase 2, under construction)
Number of tracks2
CharacterMostly underground with little sections elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead line
Route map

Xinqiao depot
Xinqiao
Gaotanyan
Tianlilu
Shapingba
Bus interchange China Railway      Loop line      Line 1
Xiaolongkan
     Line 1
Tuwan
Hongyancun
Fuhualu
Hualongqiao
Lijiaping
Mahuangliang
Guanyinqiao
     Line 3
Liyuchi
     Line 10
Liujiatai
Jiangbeicheng
     Line 6
Wulidian
     Loop line      Line 6
Gailanxi
Toutang
     Line 4
Baoshuigang
     Line 4
Cruise Port
Hejialiang
Shipanhe
Shangwanlu
     Line 10
Taiwan Industrial Park depot
Qinggangping
Baoshenghu
Xingke Ave.
Chunhua Ave.
Langui Ave.
Central Park East
     Line 10
Congyansi
Huashigou
Huashigou depot
=
Virtual interchange: transport
card only, re-entry required.

Line 9 of CRT is a rapid transit line in Chongqing, China.

Stations

Phase I

Phase 1 of the line opened on 25 January 2022, except Xinqiao, Cruise Port and Baoshenghu stations.[1]

Station
No.
Station name Connections Distance
km
Location
English Chinese
9/01 Xinqiao 新桥 - 0 Shapingba
9/02 Gaotanyan 高滩岩 1.9 1.9
9/03 Tianlilu 天梨路 1.2 3.0
9/04 Shapingba 沙坪坝 Add→{{rail-interchange}} Add→{{rail-interchange}} [a] 1.3 4.3
9/05 Xiaolongkan 小龙坎 Add→{{rail-interchange}} 1.0 5.3
9/06 Tuwan 土湾 1.1 6.3
9/07 Hongyancun 红岩村 Add→{{rail-interchange}} 1.2 7.6 Yuzhong
9/08 Fuhualu 富华路 Add→{{rail-interchange}} 1.1 8.7
9/09 Hualongqiao 化龙桥 1.9 10.6
9/10 Lijiaping 李家坪 1.6 12.2 Jiangbei
9/11 Mahuangliang 蚂蝗梁 0.9 13.0
9/12 Guanyinqiao 观音桥 Add→{{rail-interchange}} [b] 1.0 14.0
9/13 Liyuchi 鲤鱼池 Add→{{rail-interchange}} 1.7 15.7
9/14 Liujiatai 刘家台 1.2 16.9
9/15 Jiangbeicheng 江北城 Add→{{rail-interchange}} 1.0 17.9
9/16 Wulidian 五里店 Add→{{rail-interchange}} Add→{{rail-interchange}} 1.2 19.1
9/17 Gailanxi 溉澜溪 1.0 20.1
9/18 Toutang 头塘 Add→{{rail-interchange}} 1.7 21.9
9/19 Baoshuigang 保税港 Add→{{rail-interchange}} 1.4 23.2
9/20 Cruise Port 邮轮母港 0.9 24.1
9/21 Hejialiang 何家梁 0.7 24.8
9/22 Shipanhe 石盘河 1.6 26.4 Yubei
9/23 Shangwanlu 上湾路 Add→{{rail-interchange}} 1.9 28.3
9/24 Qinggangping 青岗坪 1.7 30.0
9/25 Baoshenghu 宝圣湖 2.0 32.0
9/26 Xingke Ave. 兴科大道 1.2 33.2
  1. ^ Out of system transfers
  2. ^ Both require out of system transfer

Phase II

Phase 2 of the line is currently under construction.[4]

Station
No.
Station name Connections Distance
km
Location
English Chinese
9/27 Chunhua Ave. 春华大道 Yubei
9/28 Langui Ave. 兰桂大道
9/29 Central Park East 中央公园东 Add→{{rail-interchange}}
9/30 Congyansi 从岩寺
9/31 Huashigou 花石沟

References

  1. ^ a b "轨道九号线一期本月开通运营". 本月即将开通运营23个车站,新桥站、邮轮母港站、宝圣湖站3个站点暂不开放
  2. ^ "赛迪工程咨询监理的重庆轨道交通9号线即将开通运营". Archived from the original on April 17, 2022. 全长32.289km;共设站26座,本次开通的车站23座
  3. ^ "重庆轨道交通9号线25个站安装完成 开始调试". September 21, 2021.
  4. ^ a b "进展顺利!重庆地铁9号线二期工程进入铺轨阶段". November 5, 2021.