Waitan Bridge station
Appearance
Waitan Bridge 外滩大桥 | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||
Location | Jiangbei District, Ningbo, Zhejiang China | ||||||||||||||||||||
Operated by | Ningbo Rail Transit Co. Ltd. | ||||||||||||||||||||
Line(s) | Line 2 | ||||||||||||||||||||
Platforms | 2 (1 island platform) | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 26 September 2015 | ||||||||||||||||||||
Services | |||||||||||||||||||||
|
Waitan Bridge Station is an underground metro station in Ningbo, Zhejiang, China. Waitan Bridge Station situates on Daqing North Road at the crossing of Jingjia Road. Construction of the station starts in December 2010 and opened to service on September 26, 2015.[1]
Exits
[edit]Waitan Bridge Station has 3 exits.[2]
Exit | Suggested destinations |
---|---|
A | Dazha South Road |
B | Jiefang North Road, Raffles Square |
D | Daqing South Road, Jiangbei Central Primary School |
References
[edit]- ^ 陈锦源 (2010-12-23). "2号线车站设计人性化而有宁波味 效果图抢先看". 中国宁波网. Retrieved 2011-01-21.
- ^ "宁波轨道交通 > 乘客服务 > 综合查询". 宁波市轨道交通集团有限公司. Retrieved 2015-09-27.
29°52′59″N 121°33′32″E / 29.8831°N 121.5590°E