Electrum is a technology and consulting group operating in renewables (RES)[1], dealing with energy, industry and construction field facilities, as well as the development and implementation of alternative energy sources[2].
The company implements complex projects within renewable energy sources in EPC formula[3]. The projects commissioned in this formula include:
- wind farms[4],
- solar parks[5],
- integration of systems in the area of automation, power engineering and information technology[6],
- electrical installation networks[7].
Electrum employs over 180 employees[8]. Its president is Miroslaw Poplawski.
Activity area
[edit]- design, construction and monitoring of wind farms[9],
- design, construction and monitoring of solar parks[10],
- energy projects areas- general contracting[10].
The group is part of the RIGRID project[11], thanks to which intelligent distributed energy tools have been installed in rural areas in Poland and Germany[12]. The goal was to increase the efficiency of the electricity infrastructure[13]. The project concerning Polish areas has been implemented in Punsk in 2016–2018[14]. The project is intended to reduce CO2 emissions by 80% by 2050 and to develop local ecological smart grids[15].
The company is one of the co- founders of MESH4YOU project (Multi-Energy Storage Hub)[16], assuming the transformation of energy systems towards a low-emission economy in several countries: Poland, Germany, Italy and Switzerland[17]. On the Polish side, the company is implementing a demonstrator project aimed at developing and demonstrating solutions with multiple energy storage centers[18].
History
[edit]The group has been operating in Poland since 1997, initially dealing with electrical installations. Another undertaking was the performance of the contract as the General Contractor in the BoP formula, the so-called Balance of Plants in the area of the renewable energy market[19]. Within the next years the company has changed the profile of activity from an engineering company to a technology company with engineering competences, research and development department and after-project care department[19].
Selected projects
[edit]- Korytnica wind farm[20]
- Orla wind farm[21]
- Banie- Kozielice wind farm[22]
- PV Gryf solar park[23]
- Orla and Krywiatycze wind farm[24]
- Dębsk wind farm [25]
- Wronki wind farm [26]
- modernization of HV/MV substation in Suwalki [27]
Awards
[edit]In 2020 the company has been placed on Rzeczpospolita- polish daily mail ranking amongst 2000 companies with the highest revenue [28].
References
[edit]- ^ FXMAG. "Izraelsko-polski kontrakt zrewolucjonizuje polski rynek OZE | FXMAG INWESTOR". www.fxmag.pl (in Polish). Retrieved 2022-01-18.
- ^ Przemyslowy.pl, Redakcja Portal (2021-11-21). "Wzrost znaczenia inwestycji energetycznych na wschodzie Europy". Portal Przemysłowy.pl (in Polish). Retrieved 2022-01-18.
- ^ "Engineering, procurement, and construction", Wikipedia, 2022-01-11, retrieved 2022-01-18
- ^ www.cmsmirage.pl, CMSMirage sp z o o-. "GRAMwZIELONE.pl - Portal zielonej energii". gramwzielone.pl (in Polish). Retrieved 2022-01-18.
- ^ "Electrum buduje kolejne farmy fotowoltaiczne - SERWIS INFORMACYJNY CIRE 24". www.cire.pl. Retrieved 2022-01-18.
- ^ "Najbardziej dynamiczne firmy regionu". plus.poranny.pl (in Polish). 2017-02-24. Retrieved 2022-01-18.
- ^ "Electrum przyłączy EC Żerań do sieci". www.rynekinfrastruktury.pl (in Polish). Retrieved 2022-01-18.
- ^ https://electrum.pl/kariera/
- ^ https://electrum.pl/en/home-2/
- ^ a b "2015: udany rok dla Electrum - SERWIS INFORMACYJNY CIRE 24". www.cire.pl. Retrieved 2022-01-18.
- ^ "Consortium participants". Rigrid. Retrieved 2022-01-18.
- ^ "Projekt RIGRID - budowa inteligentnej energetyki rozproszonej". WAGOdirect (in Polish). 2018-08-28. Retrieved 2022-01-18.
- ^ "Rigrid". Rigrid. Retrieved 2022-01-18.
- ^ "RIGRID demonstrator in Puńsk". Rigrid. Retrieved 2022-01-18.
- ^ "ERA-Net Smart Grids Plus". Rigrid. Retrieved 2022-01-18.
- ^ https://www.researchgate.net/project/MESH4U-Multi-Energy-Storage-Hub-For-reliable-and-commercial-systems-Utilization
- ^ https://mesh4u.energy/demonstrations-of-mesh4u-functionalities/
- ^ https://mesh4u.energy/#goals
- ^ a b https://electrum.pl/en/history/
- ^ "Konsorcjum Electrum wybuduje FW Korytnica - SERWIS INFORMACYJNY CIRE 24". www.cire.pl. Retrieved 2022-01-18.
- ^ "Podlaskie: Ok. 270 mln zł będzie kosztować budowa farmy wiatrowej Orla". pb.pl (in Polish). Retrieved 2022-01-18.
- ^ www.cmsmirage.pl, CMSMirage sp z o o-. "GRAMwZIELONE.pl - Portal zielonej energii". gramwzielone.pl (in Polish). Retrieved 2022-01-18.
- ^ "Farma fotowoltaiczna PV Gryf Energa | Rynek Elektryczny". Retrieved 2022-01-18.
- ^ "Farma wiatrowa Orla". Inwestycje Energetyczne (in Polish). Retrieved 2022-01-18.
- ^ "Polenergia rozpoczyna budowę ogromnej farmy wiatrowej". elektrosystemy.pl (in Polish). Retrieved 2022-01-18.
- ^ https://electrum.pl/en/project/wronki-wind-farm-48-mw/
- ^ https://electrum.pl/en/project/modernisation-of-a-11020-kv-reja-substation-in-suwalki/
- ^ "Lista 2000 - dane za 2020 rok w tys. zł - Lista 2000 - 2021". rankingi.rp.pl. Retrieved 2022-01-18.