Tumarín Dam

Coordinates: 13°0′30.79″N 84°24′25.24″W / 13.0085528°N 84.4070111°W / 13.0085528; -84.4070111
From Wikipedia, the free encyclopedia
Tumarín Dam
Tumarín Dam is located in Nicaragua
Tumarín Dam
Location of Tumarín Dam in Nicaragua
Official namePresa Tumarín
CountryNicaragua
LocationTumarín
Coordinates13°0′30.79″N 84°24′25.24″W / 13.0085528°N 84.4070111°W / 13.0085528; -84.4070111
PurposePower
StatusStalled
Opening dateUnknown
Construction costUS$1.1 billion
Dam and spillways
Type of damGravity, roller-compacted concrete
ImpoundsRío Grande de Matagalpa
Height45 m (148 ft)
Length350 m (1,150 ft)
Reservoir
Total capacity200,000,000 m3 (160,000 acre⋅ft)
Catchment area15,300 km2 (5,900 sq mi)
Surface area20 km2 (7.7 sq mi)
Maximum water depth30 m (98 ft)
Turbines3 x 84.22 Kaplan-type
Installed capacity253 MW
Annual generation1,184 GWh (est.)

The Tumarín Dam is a 60 meter tall, concrete gravity dam under construction on the Río Grande de Matagalpa, just upstream of the town of Tumarín in the South Caribbean Coast Autonomous Region, Nicaragua. It is located about 35 km (22 mi) east of San Pedro del Norte, where the Río Grande de Matagalpa meets the Tuma River.[1] Aiming at generating power, it will be the largest hydropower dam in Nicaragua and one of the largest ones in Central America when completed.[2]

The power station located at the base of the dam will house three 84.33 MW Kaplan turbine-generators for an installed capacity of 253 MW.[3] The dam will create a reservoir covering 40 square kilometers.[4]

The project is being developed by Centrales Hidroelectricas de Nicaragua (CHN).[5] Brazil's Eletrobras was to fund the US$1.1 billion under a 20 to 30 year build–operate–transfer (BOT) agreement. First announced in March 2010, preliminary construction (roads, bridges and foundation) was to begin in 2011, and operations on the plant were projected to start by February 2015, after a 4-year-long construction. However, there have been many delays. In 2016, the dam project was indefinitely suspended due to Eletrobras' economic and legal troubles, in connection with the Brazilian economic crisis.[6] The project is still stalled as of January 2020.

References

[edit]
  1. ^ "Perfil Central Hidroeléctrica Tumarín" (PDF) (in Spanish). Ministerio deEnergía y Minas. Archived from the original (PDF) on 30 April 2014. Retrieved 29 April 2014.
  2. ^ "The Tumarín hydro project in Nicaragua with its 253 MW will generate half of the energy consumed in the country". Energy news. 4 November 2014.
  3. ^ Kaften, Cheryl (24 August 2011). "Mixing Water with Oil: Nicaragua Adds Hydroelectric Capacity to Its Power Portfolio". GreenTechnologyWorld. Retrieved 29 April 2014.
  4. ^ "Public register". European Investment Bank. Retrieved 26 March 2016.
  5. ^ "Nicaragua set to break ground on 253-MW Tumarin hydroelectric project". Hydro World. 29 January 2014. Retrieved 29 April 2014.
  6. ^ "Construction suspended on Tumarín hydroelectric project". Confidencial. 8 April 2016.