Discussion Topic |
Replies (estimated) |
Archive Link
|
Copyright issues |
1 |
Talk:ITER/Archive 1#Copyright issues
|
'Following on from JET' |
2 |
Talk:ITER/Archive 1#'Following on from JET'
|
Location, location, location |
2 |
Talk:ITER/Archive 1#Location, location, location
|
How does it work? |
2 |
Talk:ITER/Archive 1#How does it work?
|
'Criticism' NPOV |
8 |
Talk:ITER/Archive 1#'Criticism' NPOV
|
ITER or Iter...? |
2 |
Talk:ITER/Archive 1#ITER or Iter...?
|
Pronunciation |
1 |
Talk:ITER/Archive 1#Pronunciation
|
Environmental concerns |
1 |
Talk:ITER/Archive 1#Environmental concerns
|
Future energy..? |
1 |
Talk:ITER/Archive 1#Future energy..?
|
Limitations of renewable energy stuff is wrong... |
8 |
Talk:ITER/Archive 1#Limitations of renewable energy stuff is wrong...
|
generic information |
3 |
Talk:ITER/Archive 1#generic information
|
correction! |
3 |
Talk:ITER/Archive 1#correction!
|
Don't evangelise! |
17 |
Talk:ITER/Archive 1#Don't evangelise!
|
Power / Contradiction |
2 |
Talk:ITER/Archive 1#Power / Contradiction
|
Marcoeconomically? |
7 |
Talk:ITER/Archive 1#Marcoeconomically?
|
Last section is not NPOV |
5 |
Talk:ITER/Archive 1#Last section is not NPOV
|
Nuclear Fusion Scam! |
3 |
Talk:ITER/Archive 1#Nuclear Fusion Scam!
|
EAST |
1 |
Talk:ITER/Archive 1#EAST
|
Decommissioning a reactor |
3 |
Talk:ITER/Archive 1#Decommissioning a reactor
|
Good article |
4 |
Talk:ITER/Archive 1#Good article
|
cost of €10 billion |
7 |
Talk:ITER/Archive 2#cost of €10 billion
|
How many members? |
1 |
Talk:ITER/Archive 1#How many members?
|
Quantum underworld? |
5 |
Talk:ITER/Archive 1#Quantum underworld?
|
Question |
1 |
Talk:ITER/Archive 1#Question
|
SIZE? |
2 |
Talk:ITER/Archive 1#SIZE?
|
Original name |
4 |
Talk:ITER/Archive 1#Original name
|
GA on hold |
2 |
Talk:ITER/Archive 1#GA on hold
|
Regarding the notion of fusion as some perpetuum mobile |
1 |
Talk:ITER/Archive 1#Regarding the notion of fusion as some perpetuum mobile
|
Thermal Waste Heat |
3 |
Talk:ITER/Archive 1#Thermal Waste Heat
|
Confusing paragraph in "Response to criticism" section |
2 |
Talk:ITER/Archive 1#Confusing paragraph in "Response to criticism" section
|
It all makes perfect sense, expressed in dollars and cents, pounds, schilling, and pence |
1 |
Talk:ITER/Archive 1#It all makes perfect sense, expressed in dollars and cents, pounds, schilling, and pence
|
first sentence |
2 |
Talk:ITER/Archive 1#first sentence
|
Picture |
3 |
Talk:ITER/Archive 1#Picture
|
Objectives section |
1 |
Talk:ITER/Archive 1#Objectives section
|
Quoted outut of ITER's successor, DEMO, is inconsistent with DEMO article by a factor of 4 |
1 |
Talk:ITER/Archive 1#Quoted outut of ITER's successor, DEMO, is inconsistent with DEMO article by a factor of 4
|
Citation and confirmation of 500MW |
2 |
Talk:ITER/Archive 1#Citation and confirmation of 500MW
|
Demo output power |
1 |
Talk:ITER/Archive 1#Demo output power
|
Charged particle moving in a magnetic field |
2 |
Talk:ITER/Archive 1#Charged particle moving in a magnetic field
|
Current status/progress? |
1 |
Talk:ITER/Archive 1#Current status/progress?
|
Escaped tritium will not float away |
3 |
Talk:ITER/Archive 1#Escaped tritium will not float away
|
There's plenty of legitimate criticism of Tokamak fusion and ITER in particular... |
2 |
Talk:ITER/Archive 2#There's plenty of legitimate criticism of Tokamak fusion and ITER in particular...
|
Construction update? |
2 |
Talk:ITER/Archive 2#Construction update?
|
Amount of Seconds active? |
2 |
Talk:ITER/Archive 2#Amount of Seconds active?
|
Has construction started? |
4 |
Talk:ITER/Archive 2#Has construction started?
|
NEWS: construction costs of Iter more than doubled |
2 |
Talk:ITER/Archive 2#NEWS: construction costs of Iter more than doubled
|
EU |
1 |
Talk:ITER/Archive 1#EU
|
Fusion distance |
1 |
Talk:ITER/Archive 2#Fusion distance
|
IFMIF is not a nuclear fusion reactor |
3 |
Talk:ITER/Archive 2#IFMIF is not a nuclear fusion reactor
|
Construction information |
1 |
Talk:ITER/Archive 2#Construction information
|
Can this effect environment? |
5 |
Talk:ITER/Archive 2#Can this effect environment?
|
What is this about a "Molten Salt Reactor"? |
5 |
Talk:ITER/Archive 2#What is this about a "Molten Salt Reactor"?
|
National Receipt of Industrial Contracts |
1 |
Talk:ITER/Archive 2#National Receipt of Industrial Contracts
|
Photo Scale |
2 |
Talk:ITER/Archive 2#Photo Scale
|
reads like an advertisement |
2 |
Talk:ITER/Archive 2#reads like an advertisement
|
something that has not been achieved with previous fusion reactors. |
1 |
Talk:ITER/Archive 2#something that has not been achieved with previous fusion reactors.
|
Numbers not adding up |
3 |
Talk:ITER/Archive 2#Numbers not adding up
|
15 billion euro |
2 |
Talk:ITER/Archive 2#15 billion euro
|
Name Change |
1 |
Talk:ITER/Archive 2#Name Change
|
Posssible Gains? Always 20 years away |
3 |
Talk:ITER/Archive 2#Posssible Gains? Always 20 years away
|
Meltdowns, better or worse? |
4 |
Talk:ITER/Archive 2#Meltdowns, better or worse?
|
Positive Energy Output |
2 |
Talk:ITER/Archive 2#Positive Energy Output
|
Other meanings of Iter |
1 |
Talk:ITER/Archive 2#Other meanings of Iter
|
KSTAR |
1 |
Talk:ITER/Archive 2#KSTAR
|
Is it already obsolete |
5 |
Talk:ITER/Archive 2#Is it already obsolete
|
Economics of electric energy production have changed |
1 |
Talk:ITER/Archive 2#Economics of electric energy production have changed
|
Remote handling |
3 |
Talk:ITER/Archive 2#Remote handling
|
Conflicting information on total project cost |
3 |
Talk:ITER/Archive 2#Conflicting information on total project cost
|
Suggested improvement: Clarify the role of Japan |
6 |
Talk:ITER/Archive 2#Suggested improvement: Clarify the role of Japan
|
Plasma parameters |
2 |
Talk:ITER/Archive 2#Plasma parameters
|
Possible influence of recent JET results |
1 |
Talk:ITER/Archive 2#Possible influence of recent JET results
|
Grid connection and power requirements. |
1 |
Talk:ITER/Archive 2#Grid connection and power requirements.
|
Was tokamak assembly started in 2015 |
1 |
Talk:ITER/Archive 2#Was tokamak assembly started in 2015
|
External links modified |
1 |
Talk:ITER/Archive 2#External links modified
|
Delay anounced |
2 |
Talk:ITER/Archive 2#Delay anounced
|
External links modified |
1 |
Talk:ITER/Archive 2#External links modified 2
|
External links modified |
1 |
Talk:ITER/Archive 2#External links modified 3
|
External links modified |
1 |
Talk:ITER/Archive 2#External links modified 4
|
Timeline section |
1 |
Talk:ITER/Archive 2#Timeline section
|
External links modified |
1 |
Talk:ITER/Archive 2#External links modified 5
|
"while needing 50 megawatts to operate" |
7 |
Talk:ITER/Archive 2#"while needing 50 megawatts to operate"
|
Proposed Edit to Paragraph Two |
10 |
Talk:ITER/Archive 2#Proposed Edit to Paragraph Two
|
ITER DESIGN |
7 |
Talk:ITER/Archive 2#ITER DESIGN
|
Australia |
1 |
Talk:ITER/Archive 2#Australia
|
Source |
2 |
Talk:ITER/Archive 2#Source
|
Tons of sources |
9 |
Talk:ITER/Archive 2#Tons of sources
|
Achievements |
1 |
Talk:ITER/Archive 2#Achievements
|
Criticism and responses outdated and misleading |
3 |
Talk:ITER/Archive 2#Criticism and responses outdated and misleading
|
ITER: The Giant Fusion Reactor: Bringing a Sun to Earth |
6 |
Talk:ITER/Archive 2#ITER: The Giant Fusion Reactor: Bringing a Sun to Earth
|
Removing LEDE Warning Template |
2 |
Talk:ITER/Archive 2#Removing LEDE Warning Template
|
seeming error in "Background" section |
1 |
Talk:ITER/Archive 2#seeming error in "Background" section
|
Members |
3 |
Talk:ITER/Archive 2#Members
|
Most Expensive Scientific Endeavor |
4 |
Talk:ITER/Archive 2#Most Expensive Scientific Endeavor
|
Major Deletion in Lede Restored |
2 |
Talk:ITER/Archive 2#Major Deletion in Lede Restored
|
Incorrect Tritium Statements and Other Promotional Language |
12 |
Talk:ITER/Archive 2#Incorrect Tritium Statements and Other Promotional Language
|
ITER acronym contradiction |
4 |
Talk:ITER/Archive 2#ITER acronym contradiction
|
TRITIUM |
8 |
Talk:ITER/Archive 2#TRITIUM
|
POWER GAIN |
10 |
Talk:ITER/Archive 2#POWER GAIN
|
Clean up the lead part of the article |
8 |
Talk:ITER/Archive 2#Clean up the lead part of the article
|
United States $ over Euros |
1 |
Talk:ITER/Archive 2#United States $ over Euros
|
Add clarification that ITER is not designed to be perfectly efficient |
1 |
Talk:ITER/Archive 2#Add clarification that ITER is not designed to be perfectly efficient
|
New map needed |
5 |
Talk:ITER/Archive 2#New map needed
|
new particle or a big bang theory |
1 |
Talk:ITER/Archive 2#new particle or a big bang theory
|
Empathy for readers with poor internet connections |
2 |
Talk:ITER/Archive 2#Empathy for readers with poor internet connections
|
Remove false claim from the first paragraph |
4 |
Talk:ITER#Remove false claim from the first paragraph
|
Article seemed to ignore the 2022 construction problems and effect on timescales |
2 |
Talk:ITER#Article seemed to ignore the 2022 construction problems and effect on timescales
|
Article needs updating, many sections have "as of 2023", and claims about "by the end of the year"; a time that has already passed. |
1 |
Talk:ITER#Article needs updating, many sections have "as of 2023", and claims about "by the end of the year"; a time that has already passed.
|
Eric Lerner in criticism section |
2 |
Talk:ITER#Eric Lerner in criticism section
|
Outdated sentence in the opening |
5 |
Talk:ITER#Outdated sentence in the opening
|
World map of participating members needs changing. |
1 |
Talk:ITER#World map of participating members needs changing.
|
Add A Fact: "ITER Pressure Suppression System performance" |
6 |
Talk:ITER#Add A Fact: "ITER Pressure Suppression System performance"
|
Add the beta parameter to the Technical specifications section of the infobox |
2 |
Talk:ITER#Add the beta parameter to the Technical specifications section of the infobox
|
"Q" can be a misleading concept for gauging progress towards electricity production via fusion |
4 |
Talk:ITER#"Q" can be a misleading concept for gauging progress towards electricity production via fusion
|