Jump to content

Peninsular Railway (California)

From Wikipedia, the free encyclopedia

Peninsular Railway
Peninsular Railway 52 at the Western Railway Museum
Overview
HeadquartersSan Jose, California
LocaleSanta Clara County, California
Dates of operation1906–1934
PredecessorSan Jose & Los Gatos Interurban Railroad
SuccessorSouthern Pacific RailroadSan Jose Railroads
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead line600 V DC
Length91 mi (146 km)
Peninsular Railway
Palo Alto
Southern Pacific
University Junction
Mayfield
Mayfield Junction
Alta Mesa
Los Altos
Springer Road
Loyola
Grant Road
Simla
Monta Vista
Sunny Brae
Cupertino
Fremont
Meridian
Azule
Cyprus Avenue
McDonald
Winchester
Moreland
Evergreen
Sorosis
Bascome Avenue
Congress Junction
O’Connor Sanitarium
Saratoga
Bird and San Carlos
San Jose (Peninsular Station)
Bonnie Brae
San Jose–Market Street
Southern Pacific
Palm Haven
Cherry Avenue
Glen Una
Fairfield
Hamilton Junction
Campbell
Nippon Mura
Cambrian
National Avenue
Rinconada
Los Gatos

The Peninsular Railway (known to locals as the Pin) was an interurban electrified railway in the U.S. State of California in the United States of America. It served the area between San Jose, Los Gatos, and Palo Alto, comprising much of what is today known as "Silicon Valley". For much of its existence it was a subsidiary of the Southern Pacific Railroad.

History

[edit]

San Jose, Saratoga & Los Gatos Electric Railway (1900–1909)

[edit]

Before the Peninsular Railway had built any track or started running interurban operations, F.S. Granger and J.W. Rea, who owned the San Jose Los Gatos Interurban Company, sold their tracks to the Pin to avoid competing with a company backed by the Southern Pacific.[1] The original Pin tracks were from several other already existing interurban companies, such as the Alum Rock Railway Company, the Peninsular Railroad, and the Santa Clara Interurban Railroad. Some of the Peninsular Railroad and Alum Rock Railway trackage in San Jose became owned by the San Jose Railroads and were never a part of the Peninsular Railway.

Southern Pacific operations (1905–1934)

[edit]

The Peninsular Railroad was incorporated on December 21, 1905 as a subsidiary of the Southern Pacific in response to calls for an interurban line from San Francisco to San Jose.[2] In addition to the line to Los Gatos, branches were also planned to extend to Alviso, Oakland and Lick Observatory. However, due to the Colorado River flood of 1905 (which created the Salton Sea), many of the rails to be used for this construction had to be rushed to the Imperial Valley to rebuild the Southern Pacific line between Los Angeles and Yuma, Arizona. Therefore, only the lines connecting San Jose, Palo Alto and Los Gatos were constructed, and interurban service did not exist between Palo Alto and San Mateo.[3]

The Peninsular Railway was incorporated in 1909 as the successor to the Peninsular Railroad, San Jose & Los Gatos Interurban Railway, and the Santa Clara Interurban Railway.[4]

Another attempt to complete this line to San Francisco came in the next decade, with the Peninsular coming to an agreement with the United Railroads of San Francisco to run via their San Mateo interurban. Eight new cars were ordered for the planned service,[5] but construction was again delayed by a scarcity of steel rails, this time due to World War I.[6]

The trackage that the Peninsular Railway built itself was the line to Los Gatos through Campbell, the line along Stevens Creek Road to Cupertino, the two lines along the Mayfield cutoff from Cupertino to Mayfield, and Cupertino to Los Gatos, the spur to Congress Springs from Saratoga, and part of the line to Alum Rock Park.

By 1931, the system was operating 34 streetcars on 91.1 miles (146.6 km) of track.[7]

Electric passenger service between San Jose and Palo Alto began on March 5, 1910,[8] and ended on October 1, 1934. All of the lines were replaced by bus service by the late 1930s.[9][10]

Physical infrastructure

[edit]

The properties of the Peninsular Railway included everything owned by the companies it acquired as well as necessary tracks, substations, and an interurban car barn in San Jose. The carbarn faced San Carlos street at the southwest corner of San Carlos and Sunol streets. By 1920, the 68-mile (109 km) system had several main tracks originating in San Jose.

San José

[edit]

Interurban services

The primary route for all interurban trains began at a loop around Julian, Old Market, and Bassett Streets in front of the original Southern Pacific Railroad depot in San Jose. The Peninsular Railway had its own double track line down Market Street, which split into an eastbound and westbound pair of tracks going west on San Carlos Street and Park Avenue respectively.[11] Trains west to Palo Alto or Saratoga would turn onto Meridian Street and follow the dedicated right of way along San Carlos Street, while trains south to Campbell and Los Gatos would turn onto Josefa and San Carlos Streets until the double track route on Bird Avenue.

Local services

  • The Naglee park local route had its own loop on San Fernando, 15th, and San Carlos streets.
  • The Bascom local route followed the main tracks west until San Carlos and Bascom, the dedicated right of way was double-tracked from Meridian until Bascom permitting extra local service.

Alum Rock line

The Peninsular Interurban owned a line from North 10th Street and Madera Avenue to Alum Rock Park on which it would run freight service and run passenger trains along with the San Jose Railroads.

Rural county

[edit]
Postcard view of the Rinconada stop in Los Gatos

Palo Alto

The Peninsular Railroad operated several local lines in and near Palo Alto:

  • California along University Avenue
  • Waverly Street
  • El Camino Real
  • A track leased from Stanford University on the south side of Galvez Street, and continued past the Stanford Stadium until Lasuen Street, where it continued until turning west along Serra Mall ending at the Palm Drive Oval.[8]

Other towns

The Peninsular Railway tracks serviced many other towns with regional hourly service including Los Altos, Cupertino, Saratoga, Los Gatos, and Campbell. The main tracks operating electric service were on Stevens Creek Road (now Stevens Creek Boulevard), Saratoga Road from Meridian corners (today Saratoga and Stevens Creek) to downtown Saratoga, the Mayfield cut-off from Mayfield to Congress Junction (along today's Foothill Expressway and California State Route 85), and a route looping through Willow Glen, Campbell, Los Gatos, and Saratoga with a winding path on various county roads.[12] Stops typically had a shelter, as indicated by various historical photos.

Congress Springs branch

The Peninsular Railway also operated a branch line from downtown Saratoga going southwest along Big Basin Road, terminating at the Congress Hotel.

List of interurban services

[edit]
Regional services
Line name Start date[13][6] End date[13][6] Origin Destination Approx. headway Detailed route Notes
San Jose–Saratoga–Los Gatos March 19, 1904 March 12, 1933[14] Market Street Depot Los Gatos Main street Southern Pacific station Every 60 minutes until midnight Market street, pair of tracks on Park and San Carlos, Stevens Creek Road, Saratoga Road, Saratoga Los Gatos Road
San Jose–Campbell–Los Gatos 1907 March 31, 1932 Market Street Depot Los Gatos Main street Southern Pacific station Every 60 minutes until midnight Market street, pair of tracks on Park and San Carlos, Bird Avenue, Willow street, Meridian street, Hamilton avenue, Bascom avenue, Campbell avenue, Railway Avenue, shared segment with SP, Los Gatos Boulevard
San Jose–Los Altos–Palo Alto March 5, 1910 September 30, 1934 Market Street Depot Palo Alto station Every 60 minutes Market street, pair of tracks on Park and San Carlos, Stevens Creek Road, Mayfield cut-off, El Camino Stub service along the Mayfield cut-off operated in 1909, while the line was under construction. Cut back to Mayfield in 1929.
Palo Alto–Los Altos–Los Gatos 1910 October 1, 1934[10] Palo Alto station Los Gatos Every 60 minutes El Camino, Mayfield cut-off to Congress Junction, Saratoga avenue, Saratoga Los Gatos Road, Main Street Cut back to Mayfield in 1929
Alum Rock line [data missing] June 11, 1932 Berryessa Alum Rock Park Every 60 minutes Dedicated right of way from 10th/Madera to Alum Rock Park Passenger service often operated by the San Jose Railroads. Through-service changed from 17th street to King Road in July 1923. Freight service continued until mid 1934 then transferred to the Visalia Electric Railroad which operated freight service until 1938
Short-turn services
Line name Start date[9][15][13] End date[9][15][13] Origin Destination Approx. Train Frequency/Span Detailed route Notes
Bascom local [data missing] c. 1938 Market Street Depot Stevens Creek Road and Bascom Every 30 minutes Market street, pair of tracks on Park and San Carlos, Stevens Creek Road transferred to San Jose Railroads
Naglee Park local [data missing] c. 1938 Market Street Depot Naglee Park Every 15 minutes Market street, loop around San Fernando, 15th, and San Carlos streets. Originally intended to be the route to Lick Observatory. Transferred to San Jose Railroads.
Congress Springs branch July 10, 1904 c. 1933 Saratoga station Congress Hotel Irregular Big Basin Road
Stanford "Toonerville" Campus line October 6, 1909 October 20, 1929 Palo Alto station Stanford University El Camino, Leased track south of Galvez, Lasuen
University avenue line [data missing] July 19, 1925 Palo Alto station City border at San Francisquito Creek Every 15–20 minutes University Avenue Frequency varied depending on the year
Waverly Street line [data missing] September 27, 1925 Palo Alto station Waverly / Oregon Every 15–20 minutes University avenue, Waverly street Frequency varied depending on the year

Surviving Equipment

[edit]

Peninsular Railway 52 and 61 are both preserved at the Western Railway Museum. Both cars were built in 1903 by the American Car Company for the Los Gatos Interurban Railway Company. After the discontinuation of service in 1934, 52 was stripped of all electrical and mechanical equipment and its wooden car body spent 35 years as a sewing room adjacent to a private residence in San Jose. Since its restoration in the 1970s, 52 has been operated for tourist excursions.[16] Trailer car 61 had a similar post-service history and has been awaiting restoration since being donated to the Bay Area Electric Railway Association in 1980.[16]

The wooden car body of Peninsular Railway 102 is speculated to have been built into a roadside diner south of Shafter, CA. 102 was built by the St. Louis Car Company for the Peninsular Railway in 1909 as part of a combined order of similar cars with the Pacific Electric. Following a brief service on the Fresno Traction Company, 102 was sold to the Pacific Electric in 1918 and renumbered 466. Pacific Electric sold the car in 1935 and by 1943 the car body had been moved to its current location.[17]

See also

[edit]

References

[edit]
  1. ^ McCaleb 1981, p. 35.
  2. ^ McCaleb 1981, p. 44.
  3. ^ McCaleb 1981, pp. 51–52.
  4. ^ "New Incorporations". Electrical World. Vol. LIV, no. 4. July 22, 1909. p. 230.
  5. ^ Scott 1985, p. 169.
  6. ^ a b c "Streetcars: San Jose and Los Gatos Interurban Railway Company". Santa Cruz Trains. Zayante Publishing. July 1, 2021. Retrieved August 27, 2021.
  7. ^ Demoro 1986, pp. 201–202
  8. ^ a b Hilton & Due 2000, p. 404
  9. ^ a b c McCaleb 1981, p. 57.
  10. ^ a b McCaleb 1981, p. 97.
  11. ^ McCaleb 1981, p. 54.
  12. ^ McCaleb 1981, p. 52.
  13. ^ a b c d McCaleb 1981, pp. 94–97.
  14. ^ "Trolley Cars Stop Service Here Tonight". The Peninsula Times Tribune. Palo Alto, California. March 11, 1933. p. 1. Retrieved August 27, 2024 – via Newspapers.com. Free access icon
  15. ^ a b McCaleb 1981, p. 89.
  16. ^ a b Western Railway Museum (June 4, 2011). "Peninsular Railway 61". Western Railway Museum. Retrieved August 14, 2024.
  17. ^ Southern California Traction Club (July 2003). "Points of Trolley History - 2: Former PE Car 466 IN Shafter, CA". The Trolleyville Times. Retrieved August 14, 2024.

Bibliography

[edit]
[edit]