Jump to content

Konappana Agrahara metro station

Coordinates: 12°51′23″N 77°39′49″E / 12.85648°N 77.66361°E / 12.85648; 77.66361
From Wikipedia, the free encyclopedia

Infosys Foundation Konappana Agrahara
Namma Metro station
Final stages of this metro station as of April 2024
General information
Other namesKonappana Agrahara
LocationKonappana Agrahara, Electronic City, Bengaluru, Karnataka 560100
Coordinates12°51′23″N 77°39′49″E / 12.85648°N 77.66361°E / 12.85648; 77.66361
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
ArchitectITD - ITD Cementation India JV
Other information
StatusFinal Stages before Operations
Station code(TBC)
History
OpeningJanuary 2025; 1 day's time (January 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Electronic City Yellow Line
(Operational around January 2025)
Huskur Road
towards Bommasandra
Location
Map

Infosys Foundation Konappana Agrahara (formerly called as Konappana Agrahara), is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India. Infosys Foundation contributed 115 crore (US$13 million) for this station, that included 100 crore (US$12 million) for station construction and 15 crore (US$1.8 million) for installation of half-height Platform screen doors.[1]

As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025[2] due to lack of train sets which are needed for commencement of commercial operations.

History

[edit]

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Electronic City metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro. On 25 March 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[3] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

[edit]

Station Layout (TBC)

Infosys Foundation
Konappana Agrahara track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Next Station: Huskur Road
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Electronic City
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

[edit]

See also

[edit]

References

[edit]
  1. ^ "Infosys Foundation-funded metro station in Bengaluru's tech hub set to be a model facility".
  2. ^ "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
  3. ^ "ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Bomasandra-HosaRd". The Metro Rail Guy. 25 March 2017. Retrieved 23 October 2024.