Jump to content

Kodibeesanahalli metro station

Coordinates: 12°56′42″N 77°41′53″E / 12.94504°N 77.69810°E / 12.94504; 77.69810
From Wikipedia, the free encyclopedia

Kodibeesanahalli
Namma Metro station
Under Construction of this metro station as of April 2024 under Phase 2A of Blue Line of Namma Metro
General information
LocationKodibeesanahalli, Bengaluru, Karnataka 560103
Coordinates12°56′42″N 77°41′53″E / 12.94504°N 77.69810°E / 12.94504; 77.69810
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsSide platform (TBC)
Platform-1 → Central Silk Board
Platform-2 → Krishnarajapura / KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsMainline rail interchange Belandur Road Railway station
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station codeKODI (TBC)
History
OpeningJune 2026; 17 months' time (June 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Kadubeesanahalli Blue Line
(Future Service)
Marathahalli
Location
Map

Kodibeesanahalli is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. Around this metro station holds the IT Companies like Adobe, Nutanix Technologies Pvt. Ltd followed by Prestige Tech Park containing corporate and IT companies such as CoinSwitch, Amadeus Software Labs, Juniper Networks, Oracle Tech Hub and Byju's - The Learning App. This metro station is slated to become operational around June 2026.[2][3][4][5]

History

[edit]

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Kodibeesanahalli metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board - Kodibeesanahalli) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Shankaranarayana Constructions (SNC) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

[edit]

Station Layout - To Be Confirmed

Kodibeesanahalli track layout (TBC)
P#
P#
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Krishnarajapura / KIAL Terminals
Next Station: Marathahalli
Platform #
Southbound
Towards ← Central Silk Board
Next Station: Kadubeesanahalli
Side platform | Doors will open on the left Disabled access
L2

Connections

[edit]

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Archived from the original on 12 January 2024. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Archived from the original on 7 June 2023. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Archived from the original on 8 September 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Archived from the original on 14 December 2023. Retrieved 14 December 2023.
  6. ^ "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Archived from the original on 16 April 2024. Retrieved 24 October 2024.
[edit]