Jump to content

Jimah Power Plant

Coordinates: 2°35′32″N 101°43′28″E / 2.592164°N 101.724554°E / 2.592164; 101.724554
From Wikipedia, the free encyclopedia
Jimah Power Plant
An aerial view of the Jimah East Coal-Fired Power Plant captured from an Air Asia AK90 flight during its landing approach at KLIA Terminal 2 (June 2024)
Map
Official nameJimah East Coal-Fired Power Plant or Stesen Janakuasa Tuanku Muhriz
CountryMalaysia
LocationPort Dickson, Negri Sembilan
Coordinates2°35′32″N 101°43′28″E / 2.592164°N 101.724554°E / 2.592164; 101.724554
StatusOperational
Commission date2019
OwnersTenaga Nasional Berhed (TNB, 70%), Mitsui (15%) and Chugoku Electric Power Company (15%)
OperatorJimah East Power (JEP)
Thermal power station
Primary fuelCoal
Power generation
Units operational2
Nameplate capacity2000 MW

Jimah Power Plant (also known as Jimah East Coal-Fired Power Plant or Stesen Janakuasa Tuanku Muhriz) is a 2GW ultra-supercritical coal-fired power station situated in Port Dickson District, Malaysia.

History

[edit]

In February 2014, Suruhanjaya Tenaga awarded the 2GW thermal power project to a joint venture between 1Malaysia Development Berhad and Mitsui. In July 2015, Tenaga Nasional acquired a 70% stake from 1MDB,[1][2] and in January 2016, Mitsui sold a 15% stake to Chugoku Electric Power Company.[3] Construction began in 2015, with the first unit of the Jimah East power plant starting operations in August 2019,[4] and the second in December 2019.[5]

Operations

[edit]

The power station consists of two 1,000MW ultra-supercritical coal-fired units, each with a once-through boiler and a 3000rpm steam turbine operating at 603°C and 270 bar. The units feature water-cooled stator, hydrogen-cooled rotor generators, a 160m-high chimney with 9.1m internal diameter, and on-site ash storage facilities. Emissions control includes seawater flue-gas desulfurization and electrostatic precipitators.[6] The station has a coal loading jetty for large capesize bulk carriers.[7]

Accidents

[edit]
  • On the early morning of 2 February 2017, during the construction phase, a transformer in Unit 1 at the plant’s switchyard burst and caught fire. No casualty reported.[8]

References

[edit]
  1. ^ "TNB now owns 1MDB's stake in Jimah East power plant". The Edge Malaysia. Retrieved 2024-06-26.
  2. ^ "Malaysia's Tenaga Nasional mulls buying 1MDB power project". Nikkei Asia. Retrieved 2024-06-26.
  3. ^ "Japan's Chugoku Electric to pay US$84.3m for stake in Jimah East Power". The Star. Retrieved 2024-06-26.
  4. ^ "TNB: Jimah East's first power plant starts commercial operations". The Edge Malaysia. Retrieved 2024-06-26.
  5. ^ Times, New Straits (2019-12-30). "TNB'S Jimah East power plant fully operational | New Straits Times". NST Online. Retrieved 2024-06-26.
  6. ^ "Jimah East Coal-Fired Power Plant". NS Energy. Retrieved 2024-06-26.
  7. ^ "Negeri Sembilan Government Official Portal - Tuanku Muhriz Power Station". www.ns.gov.my. Retrieved 2024-06-26.
  8. ^ Bernama (2017-02-04). "Edra's Jimah power plant fire promptly put out". Malaysiakini. Retrieved 2024-06-29.

Further reading

[edit]