Jump to content

Hardau Residential Complex

Coordinates: 47°22′51″N 8°30′35″E / 47.38088°N 8.50982°E / 47.38088; 8.50982
From Wikipedia, the free encyclopedia
Hardau Residential Complex
Wohnsiedlung Hardau (German)
Map
General information
StatusCompleted
TypeResidential
LocationZürich, Switzerland
Address70 Bullingerstrasse, Zürich, Switzerland
Coordinates47°22′51″N 8°30′35″E / 47.38088°N 8.50982°E / 47.38088; 8.50982
Construction started1976
Completed1978
Height
Roof95.4 m (313 ft) (highest: Tower 1)[1]
Technical details
Structural systemConcrete
Floor count33 (highest: Tower 1)
Design and construction
Architect(s)Max P. Kollbrunner

The Hardau Residential Complex (German: Hardau Hochhaus or Wohnsiedlung Hardau II) is a high-rise residential complex in Zürich, Switzerland.[2] Built between 1976 and 1978, the complex consists of four towers, with the tallest one (Tower 1 or Bullingerstrasse 73) standing at 95.4 m (313 ft) tall with 33 floors which is the second tallest building in Zürich and the 13th tallest building in Switzerland.[3]

History

[edit]

Site

[edit]

The residential development is located next to the smaller Hardau I complex developed in the 1960s.[4] Hardau II consists of a total of four residential high-rises with 21 to 31 habitable floors, two four-story residential blocks with five apartment buildings each, a retirement community of the same height with a staff house and a retirement home. The properties in the development include a total of 573 apartments, a kindergarten, various neighborhood facilities and ground floor commercial spaces.[5]

The highest residential tower (Bullingerstrasse 73), stands at an official height of 95.4 metres. It was the tallest building in the city of Zürich and subsequently in Switzerland between 1978 and 2011 when the Prime Tower was completed, and still one of the tallest residential buildings in the country. It is located in the Hard quarter on Bullingerstrasse or Norastrasse of District 4, situated in the western part of Zürich. The Letzigrund Stadium is located in the immediate vicinity to the west of the development.[6]

Architecture

[edit]

All the four towers display a square floor plan were built by the architect Max P. Kollbrunner between 1976 and 1978 as part of the first Swiss high-rise boom. The target group was older couples and individuals. Accordingly, the majority of the apartments were 2½-room apartments. The settlement was intended to alleviate the housing shortage and to offer a smaller apartment to parents with adult children who wanted to move, as well as older people who wanted to stay in the area.[7]

The enthusiasm for high-rise buildings gradually waned in the following years; the development became slums because it was not attractive enough for families with children.[8] In 1984, an initiative adopted by the people put a political end to the construction of high-rise buildings in Zurich's inner city. From 2000 onwards, taller buildings were again built in the area surrounding the Hardau development. The city of Zurich, as the owner of the Hardau buildings, combined a necessary renovation of the building technology with the creation of large apartments by combining smaller units. New kitchens, new paint and other adjustments upgraded the development between 2006 and 2007. Along with the general upgrading of the surrounding area, the reputation of the development also changed.[9]

Buildings

[edit]
Name Image Height
m (ft)
Floors Ref
Tower 1
(Bullingerstrasse 73)
33 95.4 m (313 ft) [10]
Tower 2
(Bullingerstrasse 63)
27 86 m (282 ft) [11]
Tower 3
(Bullingerstrasse 60)
23 72 m (236 ft) [12]
Tower 4 23 69 m (226 ft)

See also

[edit]

References

[edit]
  1. ^ "Hardau Hochhaus I". CTBUH Skyscraper Center. Retrieved 15 October 2024.
  2. ^ "Facade repair of Hardau II development, planner selection procedure in the selective procedure, 1st place". glvdr.ch (in German). GÄUMANN LÜDI VON DER ROPP Architekten SIA. Retrieved October 15, 2024.
  3. ^ "Hardau high-rise buildings (1976-1978)". wiedenmeier.ch (in German). Wiedenmeier. October 19, 2011. Retrieved October 15, 2024.
  4. ^ "Hardau Zurich". kollektiv-zebra.ch (in German). Collective Zebra. Retrieved October 15, 2024.
  5. ^ Quartierverein Aussersihl-Hard. "Das Stadtquartier – kreis4unterwegs" (in German). Retrieved 2019-04-02.
  6. ^ "Fire protection at Hardau II development in the city of Zurich is being improved". baublatt.ch (in German). Baublatt. July 15, 2022. Retrieved October 15, 2024.
  7. ^ "HARDAU II COMPLEX". confirmag.ch. Confirm AG. Retrieved October 15, 2024.
  8. ^ "Four high-rise buildings – 493 apartments". baumann-koelliker-gruppe.ch. Baumann Koelliker Gruppe. Retrieved October 15, 2024.
  9. ^ "Instandsetzung Wohnsiedlung Hardau – Stadt Zürich" (in German). Retrieved 2019-04-02.
  10. ^ "Bullingerstrasse 73". SkyscraperPage. Retrieved 15 October 2024.
  11. ^ "Bullingerstrasse 63". SkyscraperPage. Retrieved 15 October 2024.
  12. ^ "Bullingerstrasse 60". SkyscraperPage. Retrieved 15 October 2024.
[edit]