Draft:Timeline of the Canterbury earthquakes
An editor has marked this as a promising draft and requests that, should it go unedited for six months, G13 deletion be postponed, either by making a dummy/minor edit to the page, or by improving and submitting it for review. Last edited by Panamitsu (talk | contribs) 14 seconds ago. (Update) |
The Canterbury earthquakes in New Zealand started with a moment magnitude 7.1 earthquake on 4 September 2010 at 4:35 am with an epicentre near Darfield. It caused widespread damage and was followed by several aftershocks, including a magnitude Mw 4.7 earthquake on Boxing Day 2010, and later a magnitude 6.2 earthquake on 22 February 2011, which had an epicentre closer to Christchurch's city centre. This caused 185 fatalities and much greater damage to Canterbury. Major events following this include a Mw 6.0 earthquake in June 2011, and a ML 5.7 earthquake in February 2016. The unrelated 2016 Mw 7.8 Kaikōura earthquake occurred in November and caused further damage to Canterbury, but is not included in this timeline.
This timeline covers the earthquakes themselves, as well as the response to them, including the demolitions, repairs and recovery.
Note: Go through this list backwards (source number descending) as some sources describe delays/extensions/etc.
Sources to use:[1][2][3][4][5][6][7][8][9][10][11][12][13][14][15][16][17][18][19][20][21][22][23][24][25][26][27][28][29][30][31][32][33][34][35][36][37][38][39][40][41][42][43][44][45][46][47][48][49][50][51][52][53][54][55][56][57][58]
Sources lists:[1][2][3][4][5] Greater Christchurch Recovery Update (eg [6])
NOTE: I haven't finished going through the DPMC CERA sources
TODO: Add exact date the first Crown buyout offers were made. August 2011 is not specific enough.
TODO: Free doctors visits and prescriptions.[59]
TODO: Temporary field hospital.[60]
TODO: Add start dates of the temporary village in Kaiapoi Domain. There was a showhome in June 2011.[7]
TODO: Add to temporary housing.[8][61]
TODO: Add exact date of the opening of Rawhiti Domain Temporary Accommodation Village.
TODO: Rezoning on 23 June (??) and 18 August 2011.[62]
TODO: Find & Fix and Winter Make it Right programmes. Is briefly mentioned in the Lessons report.
TODO: Residential red zone deadlines and settlement dates 31 August 2013, 31 March 2013, 30 April 2013, 31 May 2013, 30 June 2013.[63] 31 August 2014[33] Extensions.[64][65][66][67][68] Be careful with the extensions.
TODO: Add to Margaret Mahy Playground, which started with the Amazing Place competition. Its article also does not say this so might want to expand it too.[69][70][71]
TODO: Working InZone
TODO: Community Expo "that attracted 10,000 people" (Lessons report)
TODO: September 2012 wellbeing survey. "half of greater Christchurch residents reported high levels of stress and that their quality of life had decreased" (Lessons p.11),[72]
TODO: The alliance made in September 2011 is called the Stronger Christchurch Infrastructure Rebuild Team (Lessons p. 11)
TODO: Investigate date of Gerry Brownlee becomining minister. Article says 7 September, Lessons p.19 says 6 September. Then add the Ad Hoc Cabinet Committee on Canterbury Earthquake Recovery
TODO: Earthworks on the Justice Precinct was expected to begin by February 2014.[73] See what actually happened.
TODO: Quake Outcasts stuff, including 26 August 2013 High Court decision (a source mentions this as being a reason for the 28 August 2013 Port Hills delay)
TODO: Road repairs
TODO: Start of Ideas to Remember submissions
TODO: Summer of fun
TODO: Figure out what's going on with the Cathedral Square walkway dates. It currently says 24 December was the last date of 2011, but this source says 18 December.
2010
[edit]September
[edit]- 4 September
- 4:35 am — The magnitude 7.1 2010 Canterbury earthquake strikes with an epicentre near Darfield.[74]
- 4:37 am — A magnitude 5.8 aftershock occurs.[75]
- 4:37 am — A magnitude 5.1 aftershock occurs.[76]
- 4:38 am — A magnitude 5.4 aftershock occurs.[77]
- 4:38 am — A magnitude 5.2 aftershock occurs.[78]
- 4:39 am — A magnitude 5.3 aftershock occurs.[79]
- 4:43 am — A magnitude 5.1 aftershock occurs.[80]
- 4:44 am — A magnitude 5.4 aftershock occurs.[81]
- 4:52 am — A magnitude 5.5 aftershock occurs.[82]
- 4:59 am — A magnitude 5.5 aftershock occurs.[83]
- 5 am — St John has 16 ambulances operational.[84]
- 5:18 am — A magnitude 5.0 aftershock occurs.[85]
- 7 am — The National Crisis Management Centre under the Beehive is activated.[86]
- 8:30 am — Power is restored to Kaiapoi and Shirley.[86]
- 10 am — A state of emergency is declared in Canterbury.[87][88]
- 10:30 am — St John has received a total of 687 calls.[84]
- 1:30 pm — Christchurch Airport reopens.[89][90]
- 3 pm — A portable repeater station is placed on the Port Hills to provide VHF communications due to unreliable electrical and phone lines.[89]
- 3:30 pm — 70% of Christchurch gains power again.[89]
- 4 pm — Residents of Christchurch Central City are told to be evacuated.[89]
- 6 pm — Residents of Selwyn, especially those in Rolleston, are asked to conserve water after the supply got contaminated.[86]
- 7 pm — Contact Energy says that gas is safe to be used.[89]
- 7:00 pm — A curfew is enacted and lasts until 7:00 am the following day.[91]
- 7:30 pm — Power is restored to 90% of urban Christchurch.[89]
- 5 September
- 8:30am — 85% of Christchurch has water supply.[89]
- 10 am — Christchurch pay phones become free for local, national and international calls.[89]
- 11 am — KiwiRail finishes transporting 280,000 litres of water from Temuka to Ashburton.[89]
- 11 am — The council starts inspecting buildings within the cordon.[89]
- 6 September
- 7 September
- Two families are reported to have contracted gastroenteritis. It is not immediately clear whether or not these were caused by a contaminated water supply.[94]
- Queen Elizabeth II sends a message to the prime minister, which asks to send her good wishes to those affected by the earthquake and those helping with the recovery.[95]
- Gerry Brownlee is made the Minister for Canterbury Earthquake Recovery.[96]
- The government allocates $15 million to a new wage support subsidy announced on this date, to help businesses in Canterbury with less than 20 employees.[92]
- 8 September
- 7:49 — A magnitude 4.7 aftershock occurs.[97] Measured peak ground accelerations range from 13% to 25%.[98]
- The Minister of Social Development pledges $2.5 million for giving earthquake victims counselling.[92]
- The Christchurch water boil notice is lifted after over 500 tests return negative.[99]
- 9 September
- 13 September
- Hon Clayton Cosgrove is appointed as the Labour Party spokesperson for Canterbury Earthquake Recovery.[92]
- Most schools in Canterbury reopen. The others stay closed due to earthquake damage.[101][102]
- E. Coli is detected in the Kaiapoi water supply.[102]
- 10 Salvation Army trauma counsellors arrive from Australia.[102]
- 14 September — The Canterbury Earthquake Response and Recovery Act 2010 receives royal assent.[103]
- 15 September
- The Minister of Energy and Resources announces a programme which gives free heaters to those who lost their fireplaces or logburners in the earthquake.[92]
- 16 September
- 17 September — The government pledges $10 million for the restoration of heritage buildings.[104]
- 20 September — Cabinet approves the delay of three welfare reforms until 1 March 2011.[92]
- 21 September — Police charge a demolition digger driver for an alleged attack on an engineer on 15 September after being asked to stop working.[105][106]
- 23 September — The Canterbury Earthquake (Historic Places Act) Order 2010 takes into effect.[92]
- 24 September — The members of the Canterbury Earthquake Recovery Commission are announced by the Hon Gerry Brownlee.[92]
- 27 September — The Canterbury Earthquake (Social Security Act) Order 2010 takes into effect.[92]
October
[edit]- October — The Earthquake Commission publishes the stage 1 Darfield Earthquake 4 September 2010 Geotechnical Land Damage Assessment & Reinstatement Report.[107]
- 4 October
- By this date, GeoNet has recorded a total of 1,400 aftershocks in Canterbury.[92]
- The wage support subsidy for small businesses is extended by four weeks.[92]
- A regulation and order takes into effect. These are the Canterbury Earthquake (Local Government Official Information and Meetings Act) Order 2010 and the Earthquake Commission Amendment Regulations 2010.[92]
- 19 October
- 11:32 am — A magnitude 4.8 aftershock occurs.[108] Measured peak ground accelerations range from 7% to 17% of gravity.[98]
- Demolition begins on Manchester Courts.[109]
- 23 October — The benefit concert Band Together is held.[110]
November
[edit]- 14 November — A magnitude 4.7 earthquake occurrs at 1:34 am. Initially there were no reports of damage,[111] and damage claims rose to 1,996 by 14 January.[112]
- 30 November — The Earthquake Commission publishes the stage 2 Geotechnical land damage assessment and reinstatement report.[113]
December
[edit]- 6 December — The Earthquake Commission's claim deadline has been reached. It has received a total of 160,641 claims, and has paid out $450 million for 60,686 claims.[114]
- 26 December
- 10:30 am — A shallow local magnitude 4.9 aftershock occurs. Known as the Boxing Day earthquake, it is followed by a swarm of shallow and strong aftershocks,[115][116] and causes further building damage, power outages, and water supply issues.[117] Measured peak ground accelerations range from 22% to 35%.[98]
- Noon — Power is restored to the approximate 40,000 properties that lost power.[118]
- 28 December — The restaurant of Trinity Congregational Church reopens.[119]
2011
[edit]January
[edit]- 6 January — By this date, the Earthquake Commission has received 165,203 claims for the 4 September, 19 October, 14 November and Boxing Day earthquakes.[120]
- 14 January — It is reported that the Earthquake Commission has received 6895 claims for the Boxing Day earthquake.[121]
- 19 January — Damage claims for the 19 October aftershock are due.[122]
- 20 January — A magnitude 4.8 aftershock occurs at 6:03 am.[123][124]: 86
- Late January — Demolition of Manchester Courts is finished.[124]: 14
February
[edit]- 12 February — A re-run of Boxing Day sales is held in Christchurch to compensate for lost revenue caused by the Boxing Day aftershock.[125]
- 14 February
- 17 February
- 18 February — By this date, the Earthquake Commission has paid out $740 million.[61]
- 21 February — Four Canterbury Earthquake Temporary Accommodation Service offices open, in Christchurch, Linwood, Papanui, and Kaiapoi.[61]
- 22 February
- 12:51pm — A magnitude 6.2 earthquake strikes, which results in 185 deaths.[128]
- The CTV Building collapses.
- The National Crisis Management Centre is activated.[129][130]
- 1:04 pm — A magnitude 5.5 aftershock occurs.[131]
- A state of emergency is declared in Christchurch.[87]
- 2:50 pm — A magnitude 5.6 aftershock occurs.[132]
- Queen Elizabeth II sends Prime Minister John Key a letter which includes "Please convey my deep sympathy to the families and friends of those who have been killed".[133]
- It is announced that Christchurch's twin town Christchurch, Dorset, will create four books of condolences.[134]
- 23 February
- 5:30 am — Civil Defence holds a press conference in the National Crisis Management Centre.[135]
- 10:30 am — The state of emergency is upgraded to a national level.[87][88]
- 1:30 pm — Search and rescue at the CTV Building stops after it was realised that the Grand Chancellor Hotel had safety issues. Work continued at the CTV site in the evening, but this was recovery work as it was decided that there was a low chance of there being any remaining survivors.[136]
- ~2 pm — A woman is rescued from the PGC Building, and becomes the last person to be rescued in Christchurch.[137][124]: 55
- 24 February
- c. 24 February — Sydenham Heritage Church is demolished without proper consent.[138]
- A Taiwanese rescue team of 22 arrives.[139]
- A welfare centre is opened in Rolleston Community Centre with a capacity of 150 people.[140]
- Water is being delivered by 34 tankers in Christchurch.[140]
- Two water vats holding 4,500 litres of water are delivered to Christchurch.[140]
- A 75 bed Australian Army Field hospital arrives.[140]
- 8 am — Power has been restored to 60% of Christchurch.[140]
- 12 pm — Auckland Council announces the donation of $1.5 million to earthquake relief.[140]
- 3 pm — It is announced that the government will give $20,000 to the Student Volunteer Army.[140]
- 25 February
- 6 am — Power has been restored to 75% of Christchurch, and mains water is able to be accessed by 50% of the city.[59]
- 7 am — Desalination plants in Lyttelton and New Brighton start up, which process 5,000 litres of water per hour.[141]
- 10:36 am — Telecom says that phone lines have been restored. It wants the public to text rather than call.[59]
- 10:55 am — The death toll rises to 113.[59]
- 10:00 am — The national census on 8 March is cancelled.[59]
- 12:25 pm — Prince Philip signs the book of condolences in London.[59]
- 2:45 pm — By this time, 780 portaloos have been distributed around the city, and 1200 are to arrive from overseas.[59]
- 5:30 pm — Prince Charles signs the book of condolences in London.[59]
- Over 300 Australian police officers are sworn in to help with recovery efforts.[59] Teams from China, the United Kingdom and the United States also arrive.[142]
- Prince William and Kate Middleton sign the condolences book in London.[143][144]
- The Samoan government donates $100,000 to recovery efforts.[144]
- 26 December — TelstraClear makes international and national phone calls free for Christchurch residents, which will last two weeks.[145]
- 27 February
- HMNZS Canterbury sails from Lyttelton to Wellington to pick up supplies.[145]
- 3 pm — Lyttelton tunnel reopens.[145]
- 10 pm — A pigeon is rescued from the rubble of Christ Church Cathedral and is named Barney Rubble.[146][147]
- 28 February — Prime Minister John Key confirms that there will be an inquiry into the collapse of Christchurch's buildings.[148]
March
[edit]- 1 March
- Two minutes of silence are held nationwide at 12:51 pm, which marks one week since the February earthquake.[149]
- Fiji Prime Minister Voreqe Bainimarama signs the book of condolences at the New Zealand High Commission.[150]
- 2 March — There are 1796 uniformed personnel around Christchurch, which is its peak.[151]
- 3 March — Avonside and Dallington get 86 more portaloos.[152]
- 4 March
- By this date, 56,000 buildings have been inspected. Half of the listed heritage buildings[clarification needed] have been marked unsafe.[153]
- Eastern suburbs get 120 more portaloos.[152]
- The Australian Army Field Hospital stops providing free primary care.[152]
- 7 March — Elective surgery resumes in Christchurch Hospital.[152]
- 10 March — The Reserve Bank drops the official cash rate from 3% to 2.5%, partly in response to the earthquake.[154]
- 11 March — The magnitude 9.0 2011 Tōhoku earthquake occurs off Japan, which causes the Japanese search and rescue teams to return for Japan.[155]
- 14 March
- The Canterbury Earthquake Commemoration Day Act 2011 receives royal assent, which creates a public holiday in parts of Canterbury on 18 March.[citation needed]
- The Royal Commission of Inquiry into Building Failure caused by Canterbury Earthquakes is announced.[156]
- The University of Canterbury partially opens, with lectures being held outside in marquees.[157]
- 16 March — The last of the Singapore Armed Forces leaves Christchurch.[158]
- 18 March
- Some parts of Canterbury observe a commemoration day as a public holiday.[159]
- A national memorial service is held in Hagley Park which is attended by thousands,[160] including Prince William.[161]
- 19 March — Some residents flee the city in response to Ken Ring's prediction that there will be another big earthquake on 20 March.[162]
- 21 March — About 100 CBD businessowners protest at the Christchurch Art Gallery (the temporary headquarters of Civil Defence) and within the cordon about a lack of communication from Civil Defence, and not being able to access business properties.[163][164]
- 22 March — The government issues a press release stating "Business owners need to exercise patience and consider their need to access their businesses, bearing in mind that in doing so without authorisation they may not only endanger their own lives, but also the lives of others."[165]
- 24 March — The creation of the Canterbury Earthquake Recovery Authority (CERA) is announced.[166]
- 28 March — Damage claims for the Boxing Day earthquake are due.[167]
- 29 March — The Canterbury Earthquake Recovery Authority is established,[168] and recovery work is transferred from Civil Defence to CERA.[169]
April
[edit]- 9 April — The Carlton Hotel is urgently demolished.[170][171]
- 11 April — The Burwood Hospital Birthing Unit reopens.[172]
- 12 April — Three time capsules previously found in earthquake ruins are opened. One came from The Civic, and two came from under the Statue of John Robert Godley.[173]
- 14 April
- 16 April — A magnitude 5.0 aftershock occurs at 5:49 pm.[176]
- 18 April — The Canterbury Earthquake Recovery Act 2011 receives royal assent.[177] The Canterbury Earthquake Response and Recovery Act 2010 is repealed.[178]
- 30 April — The nationwide state of emergency is lifted.[87]
May
[edit]- 3 May — An interim agreement is signed for the alliance that will rebuild and repair Christchurch.[179] Its members include CERA, the Christchurch City Council, Fletcher Construction, Fulton Hogan, Downer Construction, MacDow New Zealand and City Care.[180]
- 14 May — Share an Idea expo is held throughout the weekend and is attended by 10,000 people. It gives the public an opportunity to share ideas for the central city rebuild.[181]
- 27 May — It is announced that the next census, which was originally scheduled for 8 March 2011 but was cancelled due to the February earthquake, will take place in March 2013.[182]
- 30 May — The first tenants move back into the HSBC building.[183]
June
[edit]- 6 June — A magnitude 5.1 aftershock occurs at 9:09 am.[184]
- 9 June — It is announced that by July, the three programmes for accessing the central city Red Zone will be merged into one programme. These programmes are the business access programme, the residents' access programme and the temporary access programme.[185]
- 13 June
- 1:01 pm — A magnitude 5.3 aftershock occurs.[186]
- 1 pm — Orion reports a power outage covering 10,000 buildings.[187]
- 2:20 pm — A magnitude 6.0 aftershock occurs.[188]
- 2:21 pm — A magnitude 5.2 aftershock occurs.[189]
- The tower of Lyttelton Timeball Station collapses.[190]
- 3 pm — Orion reports that the power outage is now affecting 54,000 customers.[187]
- 3 pm — The National Crisis Management Centre is activated.[187]
- 21 June — A magnitude 5.2 aftershock occurs at 10:34 pm.[191]
- 23 June
- The system for residential zoning is announced, which includes the green zone, where properties can be repaired and rebuilt; the red zone, where rebuilding is infeasable; the orange zone, where further assessment is required; and the white zone, "which [is] still being mapped or [is] not residential land."[192][193][194]
- The mapping website landcheck.org.nz is released. It allows residents to enter their address and learn what zone their property is in. Trade Me designed it in four days.[195]
- 28 June — The remaining New Zealand Defence Force personnel leave Christchurch,[196] after 857 days working around the cordon.[197]
- 30 June — The last of city centre cordon is removed. A subsequent ceremony is held where John Key thanks about 120 people of the Defence Force, Navy and Air Force for their work in Christchurch.[197][198][151]
- June — 40 temporary homes in Linwood Park become available to tenants.[199]
July
[edit]- 1 July — The government gives up to $16 million to the Canterbury District Health Board to fund earthquake relief.[200]
- 4 July — It is announced that claims paid out by the Earthquake Commission have passed $1 billion. It is also announced that there have been a total of 370,000 claims, including 22,000 from the 13 June aftershock.[201]
- 7 July — The Canterbury District Health Board allocates $1.5 million to funding mental health care services.[202]
- 12 July — New economic indicators are released which shows that before the June earthquakes, retail sales decreased by 8% in Canterbury and 11% in Christchurch.[203]
- 22 July
- 30 July — The "My Housing Options Expo" is held in Addington Events Centre and continues the following day. It is held to inform residential red zone residents about their options.[206] It is attended by 15,000 people.[207]
August
[edit]- August — Forty buildings are added to the demolition list, including the Bus Exchange.[208]
- August — Insured residential property owners are given nine months to select two options for buyout offers from the Crown. Option 1 is "Crown purchase of the property based on the most recent rating valuation for the land, buildings and fixtures, with the Crown taking over all insurance claims for damage to the property." Option 2 is "Crown purchase of the property at the most recent rating valuation of the land, and the Crown taking over the EQC claim for land damage only. Property owners retain the benefit of all insurance claims for the damage to their buildings and fixtures, and continue to deal with EQC and their private insurer to settle those claims."[209]
- 1 August — Otahuna reopens after repairs.[210]
- 16 August — The city's red zone is temporarily closed due to hazards from a snowstorm.[211]
- 19 August — It is announced that in the coming days, the first of the 3000 properties zoned red on 23 June will be mailed buyout offers from the Crown.[62]
September
[edit]- September — The excavator Twinkle Toes arrives in the port of Lyttelton to aid in demolition.[212]
- 2 September — Canterbury Museum reopens.[213]
- 5 September
- 9,700 properties in the Port Hills are rezoned from white to green, which is most of the area. There are 3,700 properties still zoned white.[214]
- New economic indicators are released showing that "the large earthquakes on 13 June have not had a significant impact on Canterbury's recovery".[215]
- It is announced that Cabinet has signed off Cera's draft recovery strategy for public consultation.[216]
- 8 September — The Palms Shopping Centre reopens.[217]
- 10 September —The draft recovery strategy opens to public submissons. It sets the goal of having all demolitions finished and cordons removed by 1 April 2012, and have the Central City Red Zone halved by Christmas 2011.[218]
- 13 September — The first owner of a residential red-zoned property receives a payout. It is located in Dallington, and was paid by the government with its land value, which is option two. By this date CERA has sent out 4,853 letters to residential red zone owners, of which, 246 responses have been made choosing option one, and 285 choosing option two.[219]
- 16 September — It is announced that landcheck.org.nz (the website showing which residential zone a property is in) has passed 10 million visits.[220]
- 22 September — The final agreement (after an interim agreement on 3 May 2011) is signed for the alliance managing $2 billion for Christchurch's rebuild. It includes CERA, the New Zealand Transport Agency, the Christchurch City Council, Fulton Hogan, Fletcher Construction, McConnell Dowell, Downer Construction, and City Care.[179]
- 30 September — The Expert Panel Report on the PGC, Forsyth Barr and Hotel Grand Chancellor buildings are released.[156]
October
[edit]- October — The civic offices reopen.[221]
- 11 October — The government's response to the draft Central City Recovery Plan is released.[222]
- 14 October
- New economic indicators are released, showing that spending is around 90–95% of that before the earthquakes.[223]
- All properties in Banks Penninsula except for 20 are rezoned from white to green (5443 properties). The remaining 20 are still zoned white and require further assessment.[224]
- After previously been considered for demolition, it is announced that the Nurses' Memorial Chapel will be restored.[225]
- It is announced that the Canterbury Regional Policy Statement has been changed for residential development.[226]
- 28 October — 6430 residential properties are rezoned from orange to green, which was almost 80% of Canterbury's orange zone.[227]
- 29 October — The pop-up mall Re:START opens.[228]
November
[edit]- 3 November — CERA announces a new photography competition for local primary, intermediate and secondary school students to show their recovery vision.[229]
- 4 November — All of CERA's documents relating to the ChristChurch Cathedral are released.[230]
- 5 November — Bus tours of the CBD's red zone begins.[231][232]
- 9 November — Christ Church Cathedral is deconsecrated.[233]
- 17 November — 8,300 non-residential properties are zoned green after previously in the white zone.[234] 417 properties are zoned red in Brooklands and 341 are zoned green. Over 90% of the residential orange zone has now been rezoned.[235][236][237]
- 22 November — Bus trips in the CBD's red zone are made available on Saturdays between 1 pm and 7 pm and Sundays between 9 am and 7 pm.[238]
- 26 November — A walkway surrounded with security fences opens between Cathedral Square and Cashell Mall opens for the first time. It is opened during weekends and closed during weekdays until 24 December.[239][240]
December
[edit]- 2 December — Tickets for the red zone bus tours sell out.[241]
- 9 December — A revised guide for the repairing and reconstruction of houses is published by the Department of Building and Housing.[242]
- 10–11 December — The MainPower My Housing Options Expo is held at Kaiapoi High School.[207]
- 11 December — The final red zone bus tour takes place.[241] They begin again in July 2012.[243]
- 12 December
- Entries close to CERA's school student photography competition.[229]
- The tender to demolish the Crowne Plaza Hotel is awarded.[244]
- 13 December — A door-to-door programme starts, to contact 6,000 of Christchurch's homes in the orange and red zones. It is done to "ensure people living in the city's suburban red and orange zones are able to access services and support," and make people aware about services available and how to use them.[245]
- 14 December — CERA launches its cordon reduction map website, which displays a timelapse of the cordon. At this date, it measures 0.7 km2 (0.27 sq mi), down from 3.9 km2 (1.5 sq mi) in February.[246]
- 15 December — The door-to-door programme ends.[245]
- 16 December — Part of the eastern section of the CBD's red zone cordon reduced at 4 pm, opening up Latimer Square.[247]
- 17 December — 1:31pm — A panel discussion about the earthquakes and insurance is aired on Maori Television for 29 minutes. It is broadcast again the following day.[248]
- 19 December — 1,600 properties in the Port Hills area are rezoned from white to green.[249]
- 23 December
- 1:58 pm — A magnitude 5.8 aftershock occurs.[250] It causes sewage overflows, water supply issues, and 26,000 buildings to lose power.[251] All council buildings are temporarily closed.[252]
- 2:00 pm — A magnitude 5.0 aftershock occurs.[253]
- 2:06 pm — A magnitude 5.4 aftershock occurs.[254]
- 3:18 pm — A magnitude 5.9 aftershock occurs.[255]
- 24 December — The Cathedral Square Walkway is open for the final time of 2011. At the time it is reported that this would be the last time it would ever open.[240]
2012
[edit]January
[edit]- Undated — Demolition of the BNZ building begins.[256]
- Undated — Demolition of the Christchurch Convention Centre begins.[257]
- 2 January
- 4 January — The CERA office reopens following the closure after the December aftershocks. Inspections declare the building safe.[260]
- 7 January — A magnitude 5.2 earthquake occurs at 1:21 am.[261]
- 12 January — CERA adds 27 buildings to the demolition list, including five heritage buildings such as Odeon Theatre. By this date, there have been 719 building demolitions in Canterbury.[262]
- 20 January — A construction worker is taken to hospital after being injured on the Hotel Grand Chancellor's demolition site.[263]
- 21 January — A discussion about the 23 December earthquakes is televised on Maori television. With a runtime of 29 minutes, it starts at 1:31pm and is broadcast again the following day.[264]
February
[edit]- 4 February — Demolition starts on two buildings of the Terrace on the Park apartment complex following damage from the 23 December earthquakes. Demolition started 'urgently' under the Cera Act.[265]
- 9 February — The technical report about the collapse of the CTV Building is released. It found that the CTV Building did not meet building standards when it was built.[266]
- 10 February — 255 residential properties are rezoned from orange. Of these, 213 are zoned red and 42 are zoned green. There are 653 properties still zoned orange, with 401 being in Southshore.[267]
- 13 February — Park Terrace has one lane out of three temporarily closed, and traffic is closed to Salisbury Street. This is due to the demolitions of the Terrace on the Park buildings.[268]
- 15 February — The owner of the Holiday Inn confirms that the building will be demolished.[269]
- 17 February — After concerns were made about the structural integrity of a building on Riccarton Road, it is cordoned off. This caused Rotheram Street to become one-way.[270]
- 22 February — The 185 empty chairs memorial is unveiled.[271]
March
[edit]- March — Partial demolition of Christ Church Cathedral starts.[272]
- March — By this date, there are 7000 red zoned properties, of which, 5000 have accepted buyout offers from the Crown. 2590 home owners had already moved after being paid a total of $487 million.[273]
- 2 March — Bishop Victoria Mathews announces that Christ Church Cathedral will be demolished.[274]
- 14 March — Demolition of the PricewaterhouseCoopers building begins.[275]
- 18 March — The Cathedral Square walkway opens for the final time due to demolition of the BNZ building. On this day, 18,700 people went through the walkway, and 13,300 people walked through it on the previous day.[276]
- 23 March
- 250 orange zoned properties next to Avon River are rezoned to red. This includes 144 in south Richmond, 78 south[clarification needed] of the central city and 29 in Linwood.[277]
- A new temporary village to ease the demand for short-term housing is announced. It will be located at Rawhiti Domain.[278]
- A delay is announced for the rezoning of the 401 Southshore properties that are still in the orange zone.[279]
- 251 residential properties are rezoned from orange to red. They are located near the Avon River, and were zoned red due to widespread liquefaction. Of these properties, 144 are located in Richmond South, 78 in Central City South and 29 in Linwood.[280]
April
[edit]- 18 April — The establishment of the Central Christchurch Development Unit (CCDU) is announced, as a division of CERA. It will be "responsible for the implementation of the Central City Plan".[281][282]
- 20 April — The deadline for the Crown's offers to buy red-zoned residential properties is extended by three months. This was made due to the effects of aftershocks on insurance details of option 2.[209]
- 22 April — Remains of Christ Church Cathedral's tower starts being pulled down.[283]
- 24 April — A magnitude 6.2 earthquake occurs 35 kilometres south-east of Saint Arnaud at 3:36 pm.[284]
- 26 April — Demolition of Crowne Plaza Hotel is described as almost complete.[285]
- 27 April
May
[edit]- 1 May — Despite CERA aiming for a decision by the end of April, it is announced that Southshore's rezoning decision had not yet been reached.[288]
- 8 May — Hotel Grand Chancellor finishes being demolished.[289]
- 18 May
- 198 properties in Southshore West are zoned red and 203 properties are zoned green, resulting in there being no more orange-zoned properties in Christchurch.[290][291]
- 421 properties in the Port Hills are zoned green.[291]
- It is announced that after analysis of the Parklands East land following the 23 December earthquakes, it will continue to be zoned green. It will also continue being in Department of Building and Housing Technical Category 3.[292]
- 25 May — A magnitude 5.5 earthquake occurs at 2:44 pm.[293]
- 31 May — CERA releases the Recovery Strategy.[294]
- May — Zoning of flat residential land is completed.[295]
June
[edit]- 6 June — The Avondale Earthquake Assistance Centre temporarily closes due to heavy snow.[296]
- 8 June — Canterbury Club, a historic gentlemen's club, reopens.[297]
- 14 June — Durham North reopens, initially operating one way from east to west.[298][299] This splits the red zone in two.[300]
- 15 June
- A review process for the land zoning of residential flat land properties is announced.[295]
- It is announced that the residential red zone buyout offers will include properties that were being constructed at the time of the February earthquake, including a few not-for-profit non-residential buildings.[301]
- Gloucester Street reopens.[299]
- 25 June — The Royal Commission of Inquiry starts hearing evidence about the CTV Building collapse.[302]
- 29 June
- 1,107 residential Port Hills properties are rezoned from white to green.[303] 285 properties are zoned red due to collapsing cliffs or rock fall, or the possibility for that to occur.[304] There are still 166 properties zoned white, as further assessment is needed regarding these hazards.[305]
- The Royal Commission of Inquiry delivers part one of its final report.[306]
- 30 June — Applications for the flat land zoning review are due.[307]
- June — The 5000th residential red zone property owner agrees to sell to the Crown.[308]
July
[edit]- 11 July — A half-hour panel discussion is held, to discuss heating quake-damaged homes in a safe manner, and how to reduce the power bill.[309]
- 15 July — The part of Gloucester Street between Manchester Street and Durham St North is closed from 1pm to 5pm, allowing only pedestrians through.[310]
- 17 July — Bus tours of the CBD's red zone begins, which operate daily from 10am to 2am. They are operated by Red Bus and tickets cost $15.[311][243]
- 24 July — Construction starts on Cardboard Cathedral.[312]
- 30 July — The Christchurch Central Recovery Plan is published.[313][314]
- 31 July — John Key attends a tree planting ceremony in Victoria Square, and is assisted by students from Discovery 1 School and Unlimited Paenga Tawhiti.[315]
- July — The Rawhiti Domain Temporary Accommodation Village opens with 20 temporary units. The total number of government-funded temporary units is now 83.[316]
August
[edit]- 5 August — Radio Network House is imploded, becoming the first building demolished by implosion in New Zealand.
- 6 August — CERA holds a community meeting about the Christchurch Central Recovery Plan from 2 to 4 pm.[317]
- 8 August
- After previously refusing, Gerald Shirtcliff, a supervisor to the construction of the CTV Building, gives evidence to the royal inquiry about the building's collapse.[318]
- CERA holds a community meeting about the Christchurch Central Recovery Plan from 6 to 8 pm.[317]
- 9 August — CERA holds a community meeting about the Christchurch Central Recovery Plan from 6 to 8 pm.[317]
- 10 August — CERA holds a community meeting about the Christchurch Central Recovery Plan from 2 to 4 pm.[317]
- 17 August — 121 Port Hills properties are rezoned from white to red, and five properties are rezoned green.[319]
- 15 August — Demolition begins on the old Christchurch railway station.[320]
- 16 August — An interactive 3D display, known as Liquid Galaxy, shows the future of Christchurch to the public. It is open daily from 8:30 am to 5 pm until 24 August.[321]
- 23 August — The government releases part one of the Royal Commission of Inquiry's final report.[306]
September
[edit]- 6 September — Tuam Street reopens for the first time since February 2011.[322]
- 7 September — A five year schedule for the rebuild of damaged roads and underground services is released.[323]
- 13 September — 37 residential properties in the Port Hills are zoned red. This marks the end of rezoning the white zoned properties in the Port Hills at risk from rock roll.[324]
- 15 September — The Press runs a story accusing Gerald Shirtcliff of identity theft and faking his engineering degree.[325]
- 20 September — CERA releases a request for proposal for a philanthropic consultancy to "link the region with opportunities offered by the variety of philanthropic and corporate organisations wanting to aid the recovery".[326]
- 24 September — Gloucester Street is temporarily closed due to demolitions.[327]
- 27 September
- September — It is reported that a total of 1350 buildings have been totally or partly demolished.[329]
- September — Deconstruction of the Edmonds Band Rotunda is finished.[330]
October
[edit]- October — Demolition of the Farmers car park building begins.[331]
- October — Two men steal a dishwasher from an unoccupied residential red zone property in Dallington, and are later respectfully sentenced to inprisonment, home detention and community work.[332]
- 4 October — Cranmer Court, one of Christchurch's oldest buildings, starts being demolished.[333] This is met with protests.[333][334]
- 9 October
- It is announced that over 6,000 residential red zone property owners have agreed to sell their properties to the Crown. This is over 88% of all properties that have received offers. Of these, 4775 sales have been settled for a total of about $947 million.[63]
- The Port Hills land-zoning review is announced. The deadline for the applications of property owners to participate in the review is 26 October.[335]
- 10 October
- 11 October — The council votes to pause the demlition of Cranmer Court for one month, but demolition still continues.[337]
- 29 October — Ballantynes and City Mall are officially reopened, becoming the first significant central Christchurch area to reopen.[338]
- 26 October:
- 31 October
- Eight final residential Port Hills properties are rezoned from white to green. All properties in Christchurch are now either zoned green (181,000 properties) or zoned red (7,860 properties).[341][341]
- Applications for the Port Hills Zoning Review have been counted up. There were 132 applications, with 72 applicants being zoned Red but wanting to be zoned Green, and 60 applicants zoned Green but wanting to be zoned Red.[342]
November
[edit]- 9 November — C1 Espresso is opened by Gerry Brownlee.[343]
- 15 November — The draft Transport Plan is opened for public consultation, with submissions either being made physically or on the Christchurch Central Development Unit website.[344]
- 23 November — The Canterbury Skills and Employment Hub opens to assist employers with finding workers for the rebuild.[345][346]
- 24 November — Demolition of the eight-story URS House, an office block on the corner of Gloucester and Durham Streets, begins with the expectation of finishing in under 48 hours.[347]
- 29 November — The Royal Commission of Inquiry into Building Failure caused by Canterbury Earthquakes delivers part three of its final report.[306] It says that the CTV Building did not meet the building standards when it was built, and should have never been given a resource consent in 1986.[348]
December
[edit]- 6 December —The Economic Recovery Programme for Greater Christchurch is launched, which was developed by CERA and the Ministry of Business, Innovation and Employment.[349]
- 7 December — The government releases part two of the Royal Commission of Inquiry's final report.[306]
- 10 December —The government releases part three of the Royal Commission of Inquiry's final report.[306]
- 20 December — It is announced that a multi-company consortium, led by Opus, has been selected to design and develop the Avon River Precinct and the North and East Frames.[350]
2013
[edit]January
[edit]- 30 January — 2,000 cubic metres of soil is donated to the CBD rebuild from Prestons Roads Ltd.[351]
February
[edit]- 1 February — Public consultation submissions for the draft Transport Plan chapter An Accessible City are closed.[344][352]
- 8 February — CERA releases a timelapse video of the CBD rebuild from 1 February 2012 to 31 January 2013, facing Cathedral Square.[353]
- 16 February — The Red Zone cordon is officially renamed to the Rebuild Zone.[354]
- 21 February — A delay is announced for the Port Hills zoning review.[355]
- 28 February — Foundations start being laid for a new four-storey office block on the corner of High and Lichfield Streets.[356]
- February — Restoration on the Puaka–James Hight Building of the University of Canterbury finishes.[357]
- February — Demolition of Clarendon Tower finishes.[358]
- February — The Durham Street Front of House opens.[316]
- February — The Quake City exhibition at the Canterbury Museum opens.[359]
- February — Housing New Zealand announces the Repair 5000 scheme, which has the goal of repairing or rebuilding 5,000 homes by 2015.[360]
March
[edit]- 6 March — Tourism operators are asked to start submitting proposals for rebuild zone tours.[361]
- 23 March — Construction begins on the Avon River Precinct.[362]
- 27 March — It is announced that three companies have been selected to give tours inside the CBD Rebuild Zone.[363]
- 28 March — The Rebuild Zone is reduced "on Hereford Street, west of the Colombo Street intersection, and the Triangle Centre area and upper section of High Street".[364]
April
[edit]- 10 April — It is announced that the Port Hills zoning review has been postponed, meaning that decisions will not be announced in the following week.[365]
- 19 April
- The Residential Advisory Service, a free advisory service for residential property owners with rebuild or repair problems, is announced.[366]
- The Rebuild Zone cordon is reduced through a section of Cambridge Terrace, making the PGC site accessible to the public. The "city-side of the Avon River between Hereford and Armagh Streets" is opened to pedestrians.[367]
- 20 April — New Regent Street and the area surrounding it reopens.[368][369][370]
May
[edit]- May — Repair work begins on the Bridge of Remembrance.[371]
- 1 May — The Rendezvous Hotel in the Pacific Tower reopens.[372]
- 3 May — By this date, there have been a total of 1909 residential red zone clearances. Sales and Purchase Agreements have also been signed for 7057 properties, of the 7433 that are eligible.[332]
- 14 May — "[P]arts of High Street, between Cashel and Lichfield Streets, and between Lichfield and Tuam Streets, [are] reopened to pedestrians", and a temporary pedestrian corridor in Cathedral Square is opened.[373]
- 15 May —By this date there have been 2074 demolitions in the residential red zone, and 6059 properties in the zone have been sold to the Crown.[374]
- 16 May — The Residential Advisory Service becomes available to property owners.[375]
- 21 May — Sutton delivers a speech at a United Nations forum, the Global Platform for Disaster Risk Reduction. He describes the damage in Canterbury and the response.[376]
- 25 May — It is announced that the Lyttelton Timeball will be restored after the project received a $1 million donation.[377]
- 28 May — It is confirmed that residential red zone property owners under certain circumstances will be able to apply for an extension for their settlement dates for buyout offers.[378]
- 31 May
- It is announced that residents of Lucas Lane in the Port Hills will be able to move in soon, as the removal of 40,000 cubic metres of loose fill from the above quarry was completed.[379]
- A $170 million programme is announced, named the 700 New Builds programme, to build 700 new homes in Housing New Zealand land.[380]
June
[edit]- 6 June — Demolition of the Craigs Investment Partners House begins.[381]
- 7 June — The area north of Gloucester Street reopens.[382]
- 10 June — The deadline for Port Hills property buyout offers is extended to 31 January 2014.[383]
- 14 June — Cordon reductions to some areas west of Manchester Street is completed. A few dangerous buildings in that area are kept fenced off.[384]
- 21 June — Out of 316 requests, 92 residential red zone property owners who have agreed to sell to the Crown have their settlement dates extended.[385]
- 26 June — CERA releases the Canterbury Wellbeing Index.[386]
- 27 June — The Amazing Place playground winners are announced by the prime minister.[387]
- 30 June
- June — Demand for temporary accommodation is at its peak.[389]
July
[edit]- July — Demolition of the Copthorne Hotel begins.[390]
- 17 July — The Crown buys the CTV site, which will end up being used for the East Frame.[391]
August
[edit]- 6 August — The Cardboard Cathedral (the transitional cathedral for the ChristChurch Cathedral) opens to the public.[392]
- 9 August — The Crown begins sending out final purchase offers for central city properties that are located within the bounds of priority anchor projects.[393]
- 19 August — Novotel Hotel reopens.[394]
- 28 August — The Port Hills land-zoning review announcement is delayed due to the Quake Outcasts High Court decision on 26 August.[395]
- 29 August
- City councillors unanimously vote to restore the Christchurch Town Hall.[396]
- The first part of the Te Papa Ōtākaro/Avon River Precinct is officially opened.[397]
- The CCDU releases updated timelines for the anchor projects.[398]
September
[edit]- 2 September — An online interactive map showing the city's progress is released ot the public.[399]
- 5 September — It is announced that the Christchurch Central Development Unit has decided that certain properties in the North and East frames will need to acquired by the Crown, and some properties will not.[400]
- 18 September — John Key unveils new temporary housing in Linwood Park.[401]
- 19 September — The Crown acquires the property of the former PGC building, which collapsed in the February 2011 earthquake.[402][403]
- 20 September — Images of The Terraces, the next stage of the Avon River Precinct, are unveiled.[404]
- 23 September — Responses to expressions of interests for being the main construction contractor for the new Justice and Emergency Services Precinct are due.[405]
- 25 September — This year's CERA wellbeing survey opens, targeting youth aged 12–24.[406]
October
[edit]- 2 October — It is announced that the Crown has made its first compulsory land acquisition in the CBD. By land area, it now owns 55% of what it needs for the Anchor Projects.[407]
- 17 October — The design of the Justice Precinct is unveiled by John Key.[73]
- 25 October — Another delay is anounced for the Port Hills zoning review, and the expiry date of Crown buyout offers is extended from 31 January 2014 to 31 March 2014.[66][408]
- 30 October
- October — St Paul's Anglican Church in Papanui reopens.[411]
November
[edit]- 1 November — The Youth Wellbeing Survey of 2013 closes.[406]
- 6 November — The Canterbury Earthquakes 2010/11 Port Hills Slope Stability: mass movement Stage One Report is released, which outlines 36 areas of land in the Port Hills that had moved.[412]
- 15 November — The Christchurch Schools Rebuild programme is announced. Over $1.1 billion is allocated to the rebuilding and repairing of 115 severely damaged schools in greater Christchurch within ten years, which accounts for 80 per cent of classrooms in the region.[413][414]
December
[edit]- Early December — The fence in New Regent Street is removed.[415]
- 3 December
- The Court of Appeal rules that most residential red zoning of Greater Christchurch was lawful, and that CERA should review their decisions regarding "vacant and uninsured improved properties on the flat land in Christchurch" to check if they were made in accordance with the Canterbury Earthquake Recovery Act.[416]
- The Waimakariri District Council and the Crown reaches a cost-sharing agreement for council-owned land and horizontal infrastructure repairs. The Crown will contribute $37 million.[417]
- 5 December — The results of the Port Hills Zoning Review are announced. 270 properties are re-zoned, with 237 green-zoned properties being re-zoned red, and 33 are re-zoned from red to green.[418]
- 24 December — CERA's office closes for the holiday period.[419]
2014
[edit]January
[edit]February
[edit]- 22 February — Scott Base holds a minute of silence at 12:51 pm, marking the three year anniversary of the February 2011 earthquake.[421]
March
[edit]April
[edit]- 11 April — The 1000th repair to a state house in Christchurch is completed.[422]
- 28 April — Demolition of the Civic Offices on Tuam Street begins; the land will be used for the Bus Interchange.[423]
May
[edit]June
[edit]- 23 June — The 2014 New Zealand bravery awards are announced to honour acts of bravery after the February 2011 earthquake.
- 24 June — Construction of the new Bus Interchange begins.[426]
July
[edit]- 1 July — It is announced that Fletcher Construction has been awarded the main contract to build the new $300 million Christchurch Justice and Emergency Services Precinct.[427]
August
[edit]- Late August — Submissions of Ideas to Remember for the upcoming Canterbury Earthquake Memorial closes; 339 submissions were received.[428]
September
[edit]October
[edit]- October — Construction begins on The Terraces, in the Te Papa Ōtākaro/Avon River Precinct.[429]
- 22 October — The Victoria Clock Tower is unveiled after being restored.[430]
November
[edit]- 19 November — John Ombler is appointed as the acting chief executive officer of CERA.[431]
December
[edit]2015
[edit]January
[edit]February
[edit]- 20 February — By this date, there have been about 1240 demolitions in central Christchurch.[432]
March
[edit]April
[edit]May
[edit]- 31 May — The Christchurch Central Police Station is demolished by implosion.[433]
June
[edit]July
[edit]August
[edit]September
[edit]October
[edit]November
[edit]- 27 February — The 5000th repair to social housing is completed, several weeks ahead of schedule.[434]
December
[edit]- 19 December — The Christchurch Art Gallery reopens.[435]
- 22 December — The new Margaret Mahy Playground opens.[436]
2016
[edit]January
[edit]February
[edit]- 14 February
- 1:13 pm — A magnitude 5.7 earthquake occurs, which often referred to the Valentine's Day earthquake.
- The National Crisis Management Centre is activated and soon stood down.[437]
March
[edit]April
[edit]- 5 April — After originally being scheduled to close in June 2016, the Canterbury Skills and Employment Hub's closure is extended to June 2018.[438]
- 18 April — The Canterbury Earthquake Recovery Authority is disestablished.[168]
- 19 April — The Canterbury Earthquake Recovery Act 2011 is repealed by the Greater Christchurch Regeneration Act 2016.[177]
- 25 April (Anzac Day) — The Bridge of Remembrance is re-opened and re-dedicated.[439]
May
[edit]- 2 May — Trams return to New Regent Street after they stopped operating in the area due to the Valentine's Day earthquake.[440]
- 30 May — It is announced that $168 million will be allocated to the Christchurch Rebuild Schools programme, as part of the 2016 New Zealand budget.[441]
June
[edit]- 23 June — John Key opens the first stage of The Terraces.[442]
July
[edit]August
[edit]September
[edit]October
[edit]November
[edit]- 14 November — The unrelated 7.8 Mw Kaikōura earthquake occurs, which causes further damage to Canterbury.
- 29 November — The MBIE releases Rockfall: Design considerations for passive protection structures.[443]
December
[edit]- 21 December — The Statue of William Rolleston is unveiled after being toppled in the 2011 earthquake.[444]
2017
[edit]January
[edit]- 18 January — It is announced that 20 of Rawhiti Domain's temporary houses will be able to be sold to and relocated by farmers affected by the 2016 Kaikōura earthquake.[445]
- 23 January — Sign of the Kiwi reopens.[446]
February
[edit]- February — The MBIE releases its Responses to the Canterbury Earthquakes Royal Commission recommendations final report.[447]
- 19 February — St Barnabas Church reopens after restorations.[448]
- 22 February — The Canterbury Earthquake National Memorial opens.[449]
March
[edit]- March — The rebuild of Opawa Community Church is finished.[450]
- 27 March — The city council decides to demolish Lancaster Park Stadium.[451]
April
[edit]- 24 April — Gerry Brownlee resigns from his portfolio of Minister for Supporting Greater Christchurch Regeneration.[452]
- 30 April — The Christchurch City Council buys the 42 temporary houses in Linwood Park from the Ministry of Business, Innovation and Employment.[389] It subsequently gifts these to the Ōtautahi Community Housing Trust.[453]
May
[edit]- 17 May — The site of the temporary village in Kaiapoi Domain is handed back to the Waimakariri District Council.[454]
June
[edit]- The demolition rubble of Sydenham Heritage Church, which had been laying in its place since 2011, starts to be removed.[455]
July
[edit]- 1 July — The Forsyth Barr Building reopens with the new Crowne Plaza hotel.[456]
- 5 July — A blessing ceremony is held to mark the beginning of onsite work on the Lyttelton Timeball Station.[457]
- 25 July — After about two years of repairwork, the Rose Historic Chapel reopens.[458]
- 30 July — The government publishes its report Lessons from the Canterbury earthquake sequence.[459]
August
[edit]- 1 August — The Crowne Plaza Hotel reopens for booking.[460]
September
[edit]- 9 September — The synod of Christ Church Cathedral vote to restore the cathedral.[461]
- September — Restoration starts on the Nurses' Memorial Chapel.[462]
October
[edit]- 6 October — The Statue of Robert Falcon Scott is unveiled after being toppled in the 2011 earthquake.[463]
November
[edit]December
[edit]2018
[edit]- 31 January — The container mall, originally named Re:START, closes.[464]
- March — The Distinction Hotel opens in the Millenium Building after the Millenium hotel did not reopen.[465]
- 22 August — A joint venture agreement is signed to reinstate Christ Church Cathedral.[466]
- 27 October — The Nurses' Memorial Chapel is reopened.[467]
- 2 November — The Lyttelton Timeball Station is reopened.[468]
2019
[edit]- 24 February — The first part of the Christchurch Town Hall reopens after restoration.[469]
- 26 April — Prince William pays his respects to the Canterbury Earthquake National Memorial.[470]
- 30 April — A court decision concludes a long insurance legal battle, which gives $190 million for the demolition and restoration of the old Rydges hotel.[471]
- 4 August — It is announced that the Cathedral of the Blessed Sacrament will be demolished.[472]
- 10 September — Demolition of Lancaster Park Stadium is announced as almost finished, with expectations to finish by December.[473]
- 22 September — The Sign of the Takahe reopens.[474]
- September — The rebuild of Opawa Public Library starts.[475]
2020s
[edit]- 2020 — A 2018 study is published in the journal Earthquake Spectra, which suggests that ground shaking from the 2010 Darfield earthquake caused a death.[476]
- February 2020 — The temporary housing in Linwood Park starts being removed.[477]
- August 2020 — Environment Canterbury buys Odeon Theatre.[478]
- 1 September 2020 — The demolition of the Cathedral of the Blessed Sacrament begins.[479]
- 4 September 2020 — The last temporary house in Linwood Park is removed.[480]
- 22 February 2021 — An online exhibition of the Christchurch City Council Libraries' digital heritage collection is run for the 10th anniversary of the earthquake, which includes photos that the public had not seen before.[481]
- 28 February 2021 — St Peter's Church in Riccarton reopens.[482]
- October 2021 — The last demolition in the residential red zone is completed.[483][484]
- 17 December 2021 — Te Pae Christchurch Convention Centre, a replacement of the demolished Christchurch Convention Centre, officially opens. The public will get access on 13 February.[485]
- 3 March 2023 — The Christchurch Schools Rebuild programme is given another $301 million, which increases the total investment to $1.6 billion.[486]
- 1 April 2023 — The 185 empty chairs memorial is dismantled by the public at the request of its creator.[487]
- December 2023 — Demolition begins on the old Rydges Hotel and empty shops adjoining it.[488][489]
- January 2024 — Shipping containers are finished being removed from Odeon Theatre, after being there for over a decade.[490]
- 19 February 2024 — Demolition begins on the car park at the back of Rydges Hotel.[488]
- April 2024 — Scaffolding is removed from Our City.[491]
- 9 August 2024 — The government decides that it will no longer fund the rebuild of the Christ Church Cathedral, which is in a funding shortfall.[492]
- 25 September 2024 — The Engineering New Zealand Disciplinary Committee upholds a complaint against senior engineer Alan Reay for inadequately supervising the construction of the CTV Building.[493]
References
[edit]- ^ "Cathedral Square Walkway to reopen" (PDF). Department of the Prime Minister and Cabinet. 7 March 2012. Retrieved 20 June 2024.
- ^ "Christchurch earthquake: latest updates". Otago Daily Times. 28 February 2011. Retrieved 23 June 2024.
- ^ "Christchurch red zone park gets green light". RNZ. 23 August 2019. Retrieved 9 July 2024.
- ^ Lourens, Mariné (6 December 2023). "Disciplinary hearing against CTV engineer concludes". The Press. Retrieved 12 July 2024.
- ^ "Report on housing pressures in Christchurch released". Housing New Zealand. 5 April 2013. Retrieved 13 October 2024.
- ^ "Additional temporary accommodation for Christchurch". Housing New Zealand. 15 June 2013. Retrieved 13 October 2024.
- ^ "Fourth Chch temporary housing village opens". Housing New Zealand. 11 September 2013. Retrieved 13 October 2024.
- ^ "New Christchurch social housing developments". Housing New Zealand. 26 October 2013. Retrieved 13 October 2024.
- ^ "Foundation Repair Report to help Christchurch Housing Recovery". Housing New Zealand. 4 February 2014. Retrieved 13 October 2024.
- ^ "Contract awarded for Christchurch state housing minor repairs programme". Housing New Zealand. 20 December 2013. Retrieved 13 October 2024.
- ^ "Hornby Project delivers 44 new homes for Christchurch". Housing New Zealand. 28 November 2013. Retrieved 13 October 2024.
- ^ "More social houses to support Canterbury rebuild". Housing New Zealand. 21 November 2013. Retrieved 13 October 2024.
- ^ "Accord to address Christchurch housing". Housing New Zealand. 17 April 2014. Retrieved 13 October 2024.
- ^ "New social housing units in Canterbury". Housing New Zealand. 21 June 2012. Retrieved 13 October 2024.
- ^ "Funding boost for social housing in Christchurch". Housing New Zealand. 29 March 2014. Retrieved 13 October 2024.
- ^ "Council ratification marks further progress". Housing New Zealand. 12 September 2014. Retrieved 13 October 2024.
- ^ "Encouraging progress for Christchurch housing". Housing New Zealand. 9 July 2014. Retrieved 13 October 2024.
- ^ "Christchurch housing rebuild momentum grows". Housing New Zealand. 5 June 2014. Retrieved 13 October 2024.
- ^ "Govt steps up Christchurch housing response". Housing New Zealand. 5 April 2013. Retrieved 13 October 2024.
- ^ "Housing NZ hits Christchurch repair target". 2 November 2012. Retrieved 13 October 2024.
- ^ "Villages milestone 'just the beginning'". Housing New Zealand. 13 September 2012. Retrieved 13 October 2024.
- ^ "New social housing units in Canterbury". Housing New Zealand. 21 June 2012. Retrieved 13 October 2024.
- ^ "Greening begins on cleared North and East Frame sites" (PDF). Department of the Prime Minister and Cabinet. Retrieved 15 October 2024.
- ^ "Recovery milestone reached today with final flat land red zone settlements" (PDF). Department of the Prime Minister and Cabinet. 31 January 2014. Retrieved 15 October 2024.
- ^ "Government seeks interest in low cost development" (PDF). Department of the Prime Minister and Cabinet. 4 February 2014. Retrieved 15 October 2024.
- ^ "CERA CCDU National Roadshow" (PDF). Department of the Prime Minister and Cabinet. 11 February 2014. Retrieved 15 October 2024.
- ^ "First call for residential proposals in frame" (PDF). Department of the Prime Minister and Cabinet. 21 February 2014. Retrieved 15 October 2024.
- ^ "Preliminary design for new Bus Interchange" (PDF). Department of the Prime Minister and Cabinet. 6 March 2014. Retrieved 16 October 2024.
- ^ "In The Know initiative keeping the community informed" (PDF). Department of the Prime Minister and Cabinet. 7 March 2014. Retrieved 16 October 2024.
- ^ "Secondary stressors now a larger factor for earthquake affected residents" (PDF). Department of the Prime Minister and Cabinet. 18 March 2014. Retrieved 16 October 2024.
- ^ "Dumping in Residential Red Zone under investigation" (PDF). Department of the Prime Minister and Cabinet. 21 March 2014. Retrieved 16 October 2024.
- ^ "River dwellers to shift to allow cleanup" (PDF). Department of the Prime Minister and Cabinet. 9 April 2014. Retrieved 16 October 2024.
- ^ a b "Community to have say on red zone's futur" (PDF). Department of the Prime Minister and Cabinet. 17 April 2014. Retrieved 16 October 2024.
- ^ "Performing Arts Precinct designation partially lifted" (PDF). Department of the Prime Minister and Cabinet. 22 April 2014. Retrieved 16 October 2024.
- ^ "NZCID report a useful guide for recovery work" (PDF). Department of the Prime Minister and Cabinet. 24 April 2014. Retrieved 16 October 2024.
- ^ "New programme to show progress of public projects" (PDF). Department of the Prime Minister and Cabinet. 14 May 2014. Retrieved 18 October 2024.
- ^ "Health Precinct partners formalise their collaboration" (PDF). Department of the Prime Minister and Cabinet. 22 May 2014. Retrieved 18 October 2024.
- ^ "Centennial Pool making way for new generation family playground" (PDF). Department of the Prime Minister and Cabinet. 10 June 2014. Retrieved 18 October 2024.
- ^ "Recovery Plan to streamline Lyttelton Port progress" (PDF). Department of the Prime Minister and Cabinet. 20 June 2014. Retrieved 19 October 2024.
- ^ "CBD gaps filling fast as Crown returns" (PDF). Department of the Prime Minister and Cabinet. 19 October 2024. Retrieved 19 October 2024.
- ^ "Govt agrees to Chch council plan review request" (PDF). Department of the Prime Minister and Cabinet. 10 July 2014. Retrieved 20 October 2024.
- ^ "Site confirmed for Canterbury Earthquake Memorial" (PDF). Department of the Prime Minister and Cabinet. 12 July 2014. Retrieved 20 October 2024.
- ^ "Vision for central city living released" (PDF). Department of the Prime Minister and Cabinet. 16 July 2014. Retrieved 20 October 2024.
- ^ "First chance to help shape red zone's future" (PDF). Department of the Prime Minister and Cabinet. 30 July 2014. Retrieved 20 October 2024.
- ^ "Convention Centre developer and operator revealed" (PDF). Department of the Prime Minister and Cabinet. 7 August 2014. Retrieved 20 October 2024.
- ^ "Ideas aplenty as red zone engagement proves popular" (PDF). Department of the Prime Minister and Cabinet. 7 August 2014. Retrieved 20 October 2024.
- ^ "Over 5000 red zoned houses now cleared" (PDF). Department of the Prime Minister and Cabinet. 14 August 2014. Retrieved 29 October 2024.
- ^ "Government focuses on long term quake recovery" (PDF). Department of the Prime Minister and Cabinet. 2 September 2014. Retrieved 29 October 2024.
- ^ "People's stories highlight evolving city" (PDF). Department of the Prime Minister and Cabinet. 4 September 2014. Retrieved 30 October 2024.
- ^ "CERA hands building safety programme over to local councils" (PDF). Department of the Prime Minister and Cabinet. 15 September 2014. Retrieved 30 October 2024.
- ^ "Largest continuous concrete pour since earthquakes" (PDF). Department of the Prime Minister and Cabinet. 22 September 2014. Retrieved 31 October 2024.
- ^ "Construction starts on The Terraces" (PDF). Department of the Prime Minister and Cabinet. 10 October 2014. Retrieved 1 November 2024.
- ^ "Go-ahead for first Central City transport projects" (PDF). Department of the Prime Minister and Cabinet. 13 November 2014. Retrieved 1 November 2024.
- ^ "Government grant for payouts on quake-damaged houses". RNZ. 15 August 2019. Retrieved 4 November 2024.
- ^ "Government tightens payout criteria for on-sold quake homes". RNZ. 4 November 2024. Retrieved 4 November 2024.
- ^ "Provincial Chambers open for first time in more than decade". The Press. Retrieved 13 November 2023.
- ^ "People enter the Christ Church Cathedral for the first time since 2011". The Press. 17 August 2022. Retrieved 30 November 2024.
- ^ Comer, Rachael (24 June 2023). "St Mary's set to shine in all its finery". The Timaru Herald.
{{cite news}}
: CS1 maint: url-status (link) - ^ a b c d e f g h i "Christchurch quake: latest info". Stuff. 25 February 2011. Retrieved 23 June 2024.
- ^ Dick, Tim (26 February 2011). "Patients flock to Australian temporary hospital". The Sydney Morning Herald. Retrieved 23 June 2024.
- ^ a b c d "Accommodation support for quake-affected | Beehive.govt.nz". www.beehive.govt.nz. Retrieved 24 June 2024.
- ^ a b "First red zone offer letters in the mail" (PDF). Department of the Prime Minister and Cabinet. 19 August 2011.
- ^ a b "Important settlement milestone reached" (PDF). Department of the Prime Minister and Cabinet. 9 October 2012. Retrieved 2 July 2024.
- ^ "Residential red zone settlement date extended" (PDF). Department of the Prime Minister and Cabinet. 17 December 2012. Retrieved 3 July 2024.
- ^ "Red Zone extension for Southshore and South New Brighton" (PDF). Department of the Prime Minister and Cabinet. 3 May 2013. Retrieved 8 July 2024.
- ^ a b "Extension for Port Hills property owners" (PDF). Department of the Prime Minister and Cabinet. 25 October 2013. Retrieved 16 July 2024.
- ^ "Offer period extended for Port Hills red zone" (PDF). Department of the Prime Minister and Cabinet. 13 December 2013. Retrieved 26 July 2024.
- ^ "Extension for red zone property owners in the Port Hills" (PDF). Department of the Prime Minister and Cabinet. 31 July 2014. Retrieved 20 October 2024.
- ^ "Kids urged to imagine their own Amazing Place" (PDF). Department of the Prime Minister and Cabinet. 15 February 2013. Retrieved 4 July 2024.
- ^ "In New Zealand, a Playground Designed for and by Kids". Bloomberg. 4 September 2015. Retrieved 4 July 2024.
- ^ "Amazing Place playground winners announced" (PDF). Department of the Prime Minister and Cabinet. 23 May 2013. Retrieved 11 July 2024.
- ^ "Wellbeing survey goes online" (PDF). Department of the Prime Minister and Cabinet. 15 October 2012. Retrieved 2 July 2024.
- ^ a b "PM unveils design of Christchurch Justice Precinct" (PDF). Department of the Prime Minister and Cabinet. 17 October 2023. Retrieved 20 July 2024.
- ^ "GeoNet M 7.2 Darfield (Canterbury) Sat, Sep 4 2010". GeoNet. Retrieved 6 June 2024.
- ^ "Magnitude 5.8, Sat Sep 4 2010 4:37 AM". GeoNet. Retrieved 7 June 2024.
- ^ "Magnitude 5.1, Sat Sep 4 2010 4:37 AM". GeoNet. Retrieved 7 June 2024.
- ^ "Magnitude 5.4, Sat Sep 4 2010 4:38 AM". GeoNet. Retrieved 7 June 2024.
- ^ "Magnitude 5.2, Sat Sep 4 2010 4:38 AM". GeoNet. Retrieved 7 June 2024.
- ^ "A magnitude 5.3 earthquake occurred 35 km south of Oxford, New Zealand on Sat Sep 4 2010 4:39 AM. The quake was 18 kilometres deep and the shaking was moderate close to the quake". www.geonet.org.nz. Retrieved 7 June 2024.
- ^ "Magnitude 5.1, Sat Sep 4 2010 4:43 AM". GeoNet. Retrieved 7 June 2024.
- ^ "Magnitude 5.4, Sat Sep 4 2010 4:44 AM". GeoNet. Retrieved 7 June 2024.
- ^ "Magnitude 5.5, Sat Sep 4 2010 4:52 AM". www.geonet.org.nz. Retrieved 7 June 2024.
- ^ "Magnitude 5.5, Sat Sep 4 2010 4:59 AM". GeoNet. Retrieved 7 June 2024.
- ^ a b Henderson, Ian (5 September 2010). "Christchurch Earthquake Update". St John New Zealand. Archived from the original on 23 July 2011. Retrieved 6 September 2010.
- ^ "Magnitude 5.0, Sat Sep 4 2010 5:18 AM". GeoNet. Retrieved 7 June 2024.
- ^ a b c "Christchurch earthquake, Day 2 updates". The New Zealand Herald. 5 September 2010. Retrieved 7 June 2024.
- ^ a b c d e "Declared States of Emergency". www.civildefence.govt.nz. Retrieved 6 June 2024.
- ^ a b c "Historical emergencies". www.civildefence.govt.nz. Retrieved 7 June 2024.
- ^ a b c d e f g h i j "Christchurch earthquake, Day 2 updates". The New Zealand Herald. 5 September 2010. Retrieved 7 June 2024.
- ^ "Christchurch airport reopens". The Otago Daily Times. 4 September 2010. Retrieved 9 August 2024.
- ^ "REPORT INTO BUILDING SAFETY EVALUATION PROCESSES IN THE CENTRAL BUSINESS DISTRICT FOLLOWING THE 4 SEPTEMBER 2010 EARTHQUAKE" (PDF). Canterbury Earthquakes Royal Commission. 2011. Retrieved 7 June 2024.
- ^ a b c d e f g h i j k l m n o "Canterbury earthquake timeline: Government's and Parliament's response – New Zealand Parliament". www.parliament.nz. 25 June 2024. Retrieved 9 June 2024.
- ^ "Magnitude 5.0, Mon Sep 6 2010 11:40 PM". GeoNet. Retrieved 7 June 2024.
- ^ "Polluted water biggest risk to health – medic". Stuff. 7 September 2010. Retrieved 7 June 2024.
- ^ "Message following the earthquake in New Zealand, 7 September 2010". The British Monarchy. 7 September 2010. Archived from the original on 25 December 2010. Retrieved 9 September 2010.
- ^ "Brownlee made Minister for Earthquake Recovery – 3news.co.nz". 3 News. 7 September 2010. Archived from the original on 28 September 2012. Retrieved 7 June 2024.
- ^ "Magnitude 4.7, Wed Sep 8 2010 7:49 AM". GeoNet. Retrieved 10 June 2024.
- ^ a b c "Major Christchurch Events before February 22" (PDF). canterbury.royalcommission.govt.nz. July 2012. Retrieved 10 June 2024.
- ^ "Christchurch Earthquake – Boil Water Notice". Christchurch City Council. 8 September 2010. Archived from the original on 10 September 2010. Retrieved 9 September 2010.
- ^ "Canterbury earthquake: Schools to stay shut". The New Zealand Herald. 8 September 2010. Retrieved 7 June 2024.
- ^ "Majority of Canterbury schools reopen". Newshub. 12 September 2010. Retrieved 7 June 2024.
- ^ a b c "Earthquake: E. Coli found in Kaiapoi water sample". The New Zealand Herald. 13 September 2010. Retrieved 7 June 2024.
- ^ "Canterbury Earthquake Response and Recovery Act 2010". legislation.govt.nz. Retrieved 9 June 2024.
- ^ "Canterbury quake: Govt pledges $10m for heritage buildings". The New Zealand Herald. 17 September 2010. Retrieved 7 June 2024.
- ^ "Post-quake digger assault alleged". The New Zealand Herald. 21 September 2010. Retrieved 9 June 2024.
- ^ "Engineer attacked with digger". The Press. 17 September 2010. Retrieved 9 June 2024.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 22 July 2011. Retrieved 25 October 2010.
{{cite web}}
: CS1 maint: archived copy as title (link) Darfield Earthquake 4 September 2010 – Stage 1 Geotechnical Land Damage Assessment & Reinstatement Report. - ^ "Magnitude 4.8, Tue Oct 19 2010 11:32 AM". GeoNet. Retrieved 10 June 2024.
- ^ "End in sight for Manchester Demolition". The Press. 20 January 2011. Archived from the original on 7 June 2024. Retrieved 7 June 2024 – via Stuff.
- ^ Luscombe, Jane (15 September 2010). "Music stars band together for Christchurch". 3 News (MediaWorks New Zealand). Archived from the original on 29 September 2012. Retrieved 23 October 2010.
- ^ "No reports of damage following Canterbury aftershock". Otago Daily Times Online News. 14 November 2010. Retrieved 10 September 2024.
- ^ a b "Canterbury Earthquake EQC Claims Info". The Press. 15 January 2011. Retrieved 16 August 2024.
- ^ "Darfield Earthquake 4 September 2010 – Stage 2 Geotechnical Land Damage Assessment & Reinstatement Report". Archived from the original on 6 December 2010. Retrieved 7 December 2010.
- ^ "Quake impact more evident now". The Press. 1 January 2011. Retrieved 10 June 2024.
- ^ "Relocation Analysis of the Christchurch City "Boxing Day" Earthquakes" (PDF). Earthquake Commission. Retrieved 9 June 2024.
- ^ "Quake directly beneath Christchurch". Stuff. 27 December 2010.
- ^ "4 September 2010 Canterbury earthquake for kids". my.christchurchcitylibraries.com. Retrieved 9 June 2024.
- ^ "150 claims after swarm of quakes". NZPA. 27 December 2010. Retrieved 9 August 2024.
- ^ "A building weakened by red tape". The Press. 12 March 2011. Retrieved 13 August 2024.
- ^ "Almost 3500 claims from Boxing Day quake". NZPA. 6 January 2011. Retrieved 9 August 2024.
- ^ "Boxing Day Christchurch quake claims near 7000". The New Zealand Herald. 14 January 2011. Retrieved 9 June 2024.
- ^ "Canterbury Earthquake EQC Claims Info". The Press. 15 January 2011. Retrieved 16 August 2024.
- ^ "Magnitude 4.8, Thu Jan 20 2011 6:03 AM". GeoNet. Retrieved 2 August 2024.
- ^ a b c Moore, Chris (2011). Earthquake! Christchurch, New Zealand, 22 February 2011. The Press. Random House (published 1 July 2011). ISBN 978-1-86979-699-0.
- ^ "Christchurch has another go at Boxing Day sales". RNZ. 12 February 2011. Retrieved 10 August 2024.
- ^ "Valentine's Day tweet predicted Christchurch quake? Ken Ring". Newshub. 22 February 2011. Retrieved 23 June 2024.
- ^ a b "Temporary Accommodation Allowance extended" (PDF). Department of the Prime Minister and Cabinet. 27 September 2012. Retrieved 1 July 2024.
- ^ "M 6.2 Christchurch Tue, Feb 22 2011". GeoNet. Retrieved 6 June 2024.
- ^ "The 2011 Christchurch earthquake". Te Ara: The Encyclopedia of New Zealand. Retrieved 10 June 2024.
- ^ "Crisis management centre activated". Otago Daily Times Online News. 22 February 2011. Retrieved 10 June 2024.
- ^ "Magnitude 5.5, Tue Feb 22 2011 1:04 PM". GeoNet. Retrieved 7 June 2024.
- ^ "Magnitude 5.6, Tue Feb 22 2011 2:50 PM". GeoNet. Retrieved 7 June 2024.
- ^ "Message of condolence following the earthquake in New Zealand". royal.uk. 22 February 2011. Retrieved 7 June 2024.
- ^ "Twin town Christchurch's condolences for quake victims". BBC. 22 February 2011.
- ^ "65 dead in devastating Christchurch quake". Stuff. 23 February 2011. Retrieved 23 June 2024.
- ^ "Christchurch earthquake - Work resumes at CTV building". New Zealand Police. 24 February 2011. Retrieved 22 June 2024.
- ^ "Survivor recalls 26 hours trapped in rubble 10 years on from Christchurch quake". 1News. 22 February 2021. Retrieved 2 August 2024.
- ^ Price, Anna (31 March 2016). "Sydenham Heritage Church rubble to be cleared after five years". The Press. Retrieved 9 June 2024 – via Stuff.
- ^ "Taiwanese rescue team on way to New Zealand". Focus Taiwan. 23 February 2011. Archived from the original on 20 January 2012. Retrieved 23 June 2024.
- ^ a b c d e f g "Christchurch earthquake: Updates". The New Zealand Herald. 24 February 2011. Retrieved 23 June 2024.
- ^ "Water restored to half of Christchurch after earthquake". The New Zealand Herald. 25 February 2011. Retrieved 24 June 2024.
- ^ "Christchurch Earthquake: Extra Chinese workers boost foreign aid numbers". Star News. 25 February 2011. Archived from the original on 24 July 2011. Retrieved 23 June 2024.
- ^ "William and Kate express sorrow over quake". Stuff. 26 February 2011. Retrieved 23 June 2024.
- ^ a b "Volunteers flying hot meals to residents". RNZ. 26 February 2011. Retrieved 23 June 2024.
- ^ a b c "Christchurch quake - official death toll 145". 3 News. 26 February 2011. Archived from the original on 8 December 2011. Retrieved 9 August 2024.
- ^ "Christchurch earthquake: Barney Rubble emerges from cathedral". The New Zealand Herald. 2 March 2011. Retrieved 24 October 2024.
- ^ "Rescued pigeon freed to signal rebirth of a city". The Press. 2 March 2011. Retrieved 24 October 2011 – via Press Reader.
- ^ "Help for Christchurch businesses and workers after earthquake". Stuff. 1 March 2011. Retrieved 22 June 2024.
- ^ "Two minutes silence for Christchurch quake victims". RNZ. 1 March 2011. Retrieved 9 June 2024.
- ^ fijivillage. "PM signs condolence book at NZ High Commission". www.fijivillage.com. Retrieved 23 June 2024.
- ^ a b "Christchurch red zone cordon finally lifted". The New Zealand Herald. 30 June 2013. Retrieved 14 July 2024.
- ^ a b c d "Earthquake Update Eighteen – Canterbury DHB | Scoop News". www.scoop.co.nz. Retrieved 27 June 2024.
- ^ "Painstaking work continues at devastated buildings". RNZ. 4 March 2011. Retrieved 22 June 2024.
- ^ "OCR reduced to 2.5 percent". Reserve Bank of New Zealand. 10 March 2011.
- ^ "Japanese search and rescue team races home". The New Zealand Herald. 12 March 2011. Retrieved 23 June 2024.
- ^ a b "Canterbury earthquake: Technical investigation". dbh.govt.nz. Archived from the original on 3 October 2011. Retrieved 18 June 2024.
- ^ "Seat of learning shifts to marquees and portacoms". The Press. 15 March 2011. Retrieved 24 June 2024.
- ^ "Singapore Armed Forces Assistance Appreciated | Scoop News". www.scoop.co.nz. Retrieved 24 June 2024.
- ^ "Canterbury Earthquake Commemoration Day". legislation.govt.nz. Retrieved 6 June 2024.
- ^ "National Christchurch memorial service". Te Ara: The Encyclopedia of New Zealand. Retrieved 1 August 2024.
- ^ "PM welcomes Prince William's visit to Christchurch and Greymouth". Beehive.govt.nz. 10 March 2011. Retrieved 1 August 2018.
- ^ "19 March 2011". Otago Daily Times. 19 March 2011. Retrieved 2 August 2024.
- ^ "Angry cordon jumpers seek talks". The Press. 21 March 2011. Retrieved 7 July 2024.
- ^ Clark, Hamish (21 March 2011). "Angry Chch business owners storm red zone cordon". 3 News. Archived from the original on 1 July 2013. Retrieved 7 July 2024.
- ^ "Christchurch cordon to save lives". www.scoop.co.nz. 22 March 2011. Retrieved 7 July 2024.
- ^ "Establishment of the Canterbury Earthquake Recovery Authority" (PDF). Department of the Prime Minister and Cabinet. Retrieved 10 June 2024.
- ^ "Canterbury Earthquake EQC Claims Info". The Press. 15 January 2011. Retrieved 16 August 2024.
- ^ a b "Disestablishment of CERA". Department of the Prime Minister and Cabinet. Retrieved 6 June 2024.
- ^ "Transition from Civil Defence to CERA" (PDF). Department of the Prime Minister and Cabinet. 29 April 2011.
- ^ "Historic Christchurch hotel is demolished". RNZ. 9 April 2024. Retrieved 9 June 2024.
- ^ Davis, Joanna (10 April 2011). "Historic hotel for urgent demolition". The Press. Retrieved 9 June 2024 – via Stuff.
- ^ "Birthing unit reopens". The Press. 11 April 2011. Retrieved 8 June 2024 – via Stuff.
- ^ "Time capsules' contents revealed". The Press. 12 April 2011. Retrieved 9 June 2024 – via Stuff.
- ^ "Royal Commission of Inquiry into Building Failure caused by Canterbury Earthquakes – 2011-go2491 – New Zealand Gazette". gazette.govt.nz. Retrieved 6 June 2024.
- ^ "GDP stats delayed for 2 weeks after earthquake disruption". interest.co.nz. The New Zealand Herald. 14 April 2011. Retrieved 15 December 2024.
- ^ "Magnitude 5.0, Sat Apr 16 2011 5:49 PM". GeoNet. Retrieved 7 June 2024.
- ^ a b "Canterbury Earthquake Recovery Act 2011". legislation.govt.nz. Retrieved 6 June 2024.
- ^ "Canterbury Earthquake Response and Recovery Act 2010". legislation.govt.nz. Retrieved 9 June 2024.
- ^ a b "Final alliance agreement signed in Christchurch" (PDF). Department of the Prime Minister and Cabinet. 22 September 2011. Retrieved 11 June 2024.
- ^ "Local alliance to rebuild local infrastructure". Beehive. 3 May 2011. Retrieved 1 July 2024.
- ^ "Christchurch's 10,000-plus ideas". Stuff. 16 May 2011. Retrieved 28 June 2024.
- ^ "Census preparation underway". Statistics New Zealand. 27 May 2011. Archived from the original on 15 February 2018. Retrieved 23 June 2024.
- ^ Mathewson, Nicole (20 July 2011). "HSBC tenants move back in". The Press. Retrieved 8 June 2024 – via Stuff.
- ^ "Magnitude 5.1, Mon Jun 6 2011 9:09 AM". GeoNet. Retrieved 7 June 2024.
- ^ "Single access programme for Red Zone" (PDF). Department of the Prime Minister and Cabinet. 9 June 2011. Retrieved 10 June 2024.
- ^ "Magnitude 5.3, Mon Jun 13 2011 1:01 PM". GeoNet. Retrieved 7 June 2024.
- ^ a b c "Latest updates: More aftershocks to come – GNS". The New Zealand Herald. 13 June 2011. Retrieved 7 June 2024.
- ^ "Magnitude 6.0, Mon Jun 13 2011 2:20 PM". GeoNet. Retrieved 6 June 2024.
- ^ "Magnitude 5.2, Mon Jun 13 2011 2:21 PM". GeoNet. Retrieved 7 June 2024.
- ^ "Timeball Station collapses in quake". The New Zealand Herald. 13 June 2011. Retrieved 7 June 2024.
- ^ "Magnitude 5.2, Tue Jun 21 2011 10:34 PM". GeoNet. Retrieved 7 June 2024.
- ^ "Latest Christchurch land information released | Beehive.govt.nz". www.beehive.govt.nz. 24 June 2011. Retrieved 9 June 2024.
- ^ "Government outlines next steps for people of Canterbury" (PDF). Department of the Prime Minister and Cabinet. 23 June 2011. Retrieved 10 June 2024.
- ^ "Minute of decision" (PDF). Department of the Prime Minister and Cabinet. p. 5.
Note that on 23 June 2011, the Prime Minister and I announced four land damage zones for greater Christchurch.
- ^ "Landcheck site notches up ten million hits" (PDF). Department of the Prime Minister and Cabinet. 16 September 2011. Retrieved 11 June 2024.
- ^ "Our job here is done, soldiers say". The Press. 28 June 2013. Retrieved 7 July 2024.
- ^ a b "Defence Force ceremony to mark 857 days service" (PDF). Department of the Prime Minister and Cabinet. 30 June 2013. Retrieved 14 July 2024.
- ^ "Defence staff farewelled from central city". The Press. 30 June 2013. Retrieved 14 July 2024.
- ^ Heather, Ben (4 June 2011). "New villages almost ready for residents". The Press. Retrieved 24 June 2024.
- ^ "Govt provides $16m for Canty DHB quake costs | Beehive.govt.nz". www.beehive.govt.nz. Retrieved 10 June 2024.
- ^ "EQC passes $1 billion mark" (PDF). Department of the Prime Minister and Cabinet. 4 July 2011. Retrieved 10 June 2024.
- ^ "More support for Canterbury mental health services" (PDF). Department of the Prime Minister and Cabinet. 7 July 2011. Retrieved 10 June 2024.
- ^ "Steady economic data prior to June quakes" (PDF). Department of the Prime Minister and Cabinet. 12 July 2011. Retrieved 10 June 2024.
- ^ "Magnitude 4.7, Fri Jul 22 2011 5:39 AM". GeoNet. Retrieved 11 June 2024.
- ^ "Red zone checked and cleared following 5.1 aftershock" (PDF). Department of the Prime Minister and Cabinet. 22 July 2011. Retrieved 11 June 2024.
- ^ "Expo for residents affected by land decisions" (PDF). Department of the Prime Minister and Cabinet. 22 July 2011. Retrieved 10 June 2024.
- ^ a b "Expo offers help for quake-hit N Canty". The Press. 10 December 2011. Retrieved 26 August 2024 – via ProQuest.
- ^ "Bus exchange among buildings added to demolition list". RNZ. 4 August 2011. Retrieved 6 June 2024.
- ^ a b "Red zone offers get three month extension" (PDF). Department of the Prime Minister and Cabinet. 20 April 2012. Retrieved 20 June 2024.
- ^ "Historic homestead re-opens doors after quake damage fixed". The Press. 1 August 2011. Retrieved 9 June 2024.
- ^ "Further snowfalls expected tonight". The New Zealand Herald. 16 August 2011. Retrieved 25 June 2024.
- ^ "Big digger for Christchurch demo". The Press. 8 September 2011. Retrieved 8 June 2024 – via Stuff.
- ^ "Canty Museum 'will bring people back'". The Press. 2 September 2011. Retrieved 21 August 2024.
- ^ "Most of Port Hills land now zoned green" (PDF). Department of the Prime Minister and Cabinet. 5 September 2011. Retrieved 11 June 2024.
- ^ "Canterbury's latest economic data promising" (PDF). Department of the Prime Minister and Cabinet. 5 September 2011. Retrieved 11 June 2024.
- ^ "Draft Recovery Strategy released for review" (PDF). Department of the Prime Minister and Cabinet. 5 September 2011. Retrieved 11 June 2024.
- ^ Greenhill, Marc (8 September 2011). "The Palms reopens after quake repairs". The Press. Retrieved 9 June 2024.
- ^ "April target to remove cordon". The Press. 10 September 2011. Retrieved 7 July 2024.
- ^ "Homeowners receive first red zone settlement" (PDF). Department of the Prime Minister and Cabinet. 13 September 2011. Retrieved 11 June 2024.
- ^ "Landcheck site notches up ten million hits" (PDF). Department of the Prime Minister and Cabinet. 16 September 2011. Retrieved 11 June 2024.
- ^ Greenhill, Marc (11 January 2012). "Reopening after no structural issues found". The Press. Retrieved 8 June 2024 – via Stuff.
- ^ "Government Response to draft Central City Plan" (PDF). Department of the Prime Minister and Cabinet. 11 October 2011. Retrieved 11 June 2024.
- ^ "Economic recovery continues in Canterbury" (PDF). Department of the Prime Minister and Cabinet. 14 October 2011. Retrieved 11 June 2024.
- ^ "Nearly 5500 more properties zoned green" (PDF). Department of the Prime Minister and Cabinet. 14 October 2011. Retrieved 13 June 2024.
- ^ Stylianou, Georgina (14 October 2011). "Historic chapel saved from wreckers". The Press. Retrieved 9 June 2024.
- ^ "Changes to speed up urban planning in Christchurch" (PDF). Department of the Prime Minister and Cabinet. 14 October 2011. Retrieved 13 June 2024.
- ^ "6430 orange zone properties turned green" (PDF). Department of the Prime Minister and Cabinet. 28 October 2011. Retrieved 15 June 2024.
- ^ Cairns, Lois (30 October 2011). "Ravaged retail centre reborn". Stuff.co.nz. Sunday Star Times. Retrieved 9 August 2015.
- ^ a b "Photography Competition to Capture Vision for Christchurch" (PDF). Department of the Prime Minister and Cabinet. 3 November 2011. Retrieved 15 June 2024.
- ^ "The Christchurch Cathedral file" (PDF). Department of the Prime Minister and Cabinet. 4 November 2011. Retrieved 15 June 2024.
- ^ Bayer, Kurt (31 October 2011). "Red zone tours start this week". The New Zealand Herald. Retrieved 16 June 2024.
- ^ Wright, Michael (4 November 2011). "Christchurch red zone tours set to begin". Stuff. Retrieved 16 June 2024.
- ^ Christchurch Cathedral. "Christchurch Cathedral : Emergency Architecture, New Zealand". christchurchcathedral.co.nz. Archived from the original on 8 February 2013. Retrieved 11 January 2014.
- ^ "8300 non-residential properties zoned green" (PDF). Department of the Prime Minister and Cabinet. 17 November 2011. Retrieved 15 June 2024.
- ^ "Further 758 Christchurch properties rezoned" (PDF). Department of the Prime Minister and Cabinet. 17 November 2011. Retrieved 15 June 2024.
- ^ "400 Brooklands homes go red". The Press. 18 November 2011. Retrieved 13 August 2024.
- ^ "8300 non-residential properties zoned green" (PDF). Department of the Prime Minister and Cabinet. 17 November 2011. Retrieved 13 August 2024.
- ^ "CBD weekend bus trip time frames extended" (PDF). Department of the Prime Minister and Cabinet. 22 November 2011. Retrieved 16 June 2024.
- ^ "Thousands take Cathedral Square walkway". RNZ. 26 November 2011. Retrieved 8 July 2024.
- ^ a b "Cathedral Square Walkway to open one last day" (PDF). Department of the Prime Minister and Cabinet. 19 December 2011. Retrieved 17 June 2024.
- ^ a b "No seats left on CBD weekend bus trips" (PDF). Department of the Prime Minister and Cabinet. 2 December 2011. Retrieved 16 June 2024.
- ^ "Updated guidance for the repair and reconstruction of homes in Canterbury published" (PDF). Department of the Prime Minister and Cabinet. 9 December 2011. Retrieved 16 June 2024.
- ^ a b Young, Rachel (3 July 2012). "Red-zone bus tours to start soon". The Press. Retrieved 16 June 2024 – via Stuff.
- ^ "Tender awarded for Crowne Plaza demolition" (PDF). Department of the Prime Minister and Cabinet. 12 December 2011. Retrieved 16 June 2024.
- ^ a b "Multi agency door-to-door programme to run next week" (PDF). Department of the Prime Minister and Cabinet. 8 December 2011. Retrieved 16 June 2024.
- ^ "Online map tracks CBD cordon reduction" (PDF). Department of the Prime Minister and Cabinet. 14 December 2011. Retrieved 16 June 2024.
- ^ "CBD red zone cordon reduction" (PDF). Department of the Prime Minister and Cabinet. 16 December 2011. Retrieved 17 June 2024.
- ^ "Panel discussion to air on Maori Television this weekend" (PDF). Department of the Prime Minister and Cabinet. 16 December 2011. Retrieved 17 June 2024.
- ^ "More Port Hills properties zoned green" (PDF). Department of the Prime Minister and Cabinet. 19 December 2011. Retrieved 17 June 2024.
- ^ "Magnitude 5.8, Fri Dec 23 2011 1:58 PM". GeoNet. Retrieved 7 June 2024.
- ^ "Essential repairs done by Christmas Day – council". RNZ. 24 December 2011. Retrieved 7 June 2024.
- ^ "Christchurch earthquake Friday 23 December 2011" (PDF). Department of the Prime Minister and Cabinet. 23 December 2011. Retrieved 17 June 2024.
- ^ "Magnitude 5.0, Fri Dec 23 2011 2:00 PM". GeoNet. Retrieved 7 June 2024.
- ^ "Magnitude 5.4, Fri Dec 23 2011 2:06 PM". GeoNet. Retrieved 7 June 2024.
- ^ "Magnitude 5.9, Fri Dec 23 2011 3:18 PM". GeoNet. Retrieved 7 June 2024.
- ^ "Demolition of BNZ building begins". RNZ. 19 January 2012. Retrieved 8 June 2024.
- ^ "Convention Centre demolition to proceed" (PDF). Department of the Prime Minister and Cabinet. 13 January 2012. Retrieved 17 June 2024.
- ^ "Magnitude 5.1, Mon Jan 2 2012 1:27 AM". GeoNet. Retrieved 9 June 2024.
- ^ "Magnitude 5.5, Mon Jan 2 2012 5:45 AM". GeoNet. Retrieved 9 June 2024.
- ^ "CERA open but office closed to the public" (PDF). Department of the Prime Minister and Cabinet. 4 January 2012. Retrieved 17 June 2024.
- ^ "Magnitude 5.2, Sat Jan 7 2012 1:21 AM". GeoNet. Retrieved 9 June 2024.
- ^ "More Christchurch buildings marked for demolition". The Press. 12 January 2012. Retrieved 17 August 2024.
- ^ "Construction worker injured" (PDF). Department of the Prime Minister and Cabinet. 20 January 2012. Retrieved 17 June 2024.
- ^ "Recent seismic activity to be discussed on Maori Television" (PDF). Department of the Prime Minister and Cabinet. 20 January 2012. Retrieved 17 June 2024.
- ^ "Urgent demolition for Park Terrace ordered". The Press. 3 February 2012. Retrieved 8 June 2024 – via Stuff.
- ^ "Report into CTV building collapse released" (PDF). Department of the Prime Minister and Cabinet. 9 February 2012. Retrieved 18 June 2024.
- ^ "Residential zone announcement Friday 10 February" (PDF). Department of the Prime Minister and Cabinet. 10 February 2012. Retrieved 20 June 2024.
- ^ "Traffic Changes for Terrace on the Park Demolition" (PDF). Department of the Prime Minister and Cabinet. 13 February 2012. Retrieved 20 June 2024.
- ^ Wood, Alan (15 February 2012). "Christchurch's Holiday Inn to be demolished". Stuff. Retrieved 8 June 2024.
- ^ "Riccarton Road Building Cordoned Of" (PDF). Department of the Prime Minister and Cabinet. 17 February 2012. Retrieved 20 June 2024.
- ^ "Installation represents victims' personalities". The Press. 23 February 2012. Retrieved 6 June 2024 – via Stuff.
- ^ Mann, Charley (27 March 2012). "Work on cathedral demolition under way". The Press. Retrieved 7 June 2024.
- ^ "Demolition about to start in northern areas". The Press. 5 March 2012. Retrieved 8 June 2024 – via Stuff.
- ^ "Christ Church Cathedral to be pulled down". Stuff. 2 March 2012. Retrieved 22 June 2024.
- ^ "Demolition of quake-hit PWC building starts". The New Zealand Herald. 14 March 2012. Retrieved 8 June 2024.
- ^ "Cathedral Square Walkway popular" (PDF). Department of the Prime Minister and Cabinet. 18 March 2012. Retrieved 20 June 2024.
- ^ Mathewson, Nicole (23 March 2012). "New riverside red zone". The Press. Retrieved 9 June 2024.
- ^ "New temporary village announced" (PDF). Department of the Prime Minister and Cabinet. 23 March 2012. Retrieved 20 June 2024.
- ^ "Southshore West stays orange for now" (PDF). Department of the Prime Minister and Cabinet. 23 March 2012. Retrieved 20 June 2024.
- ^ "Land zone announcement Friday 23 March 2012" (PDF). Department of the Prime Minister and Cabinet. 23 March 2012. Retrieved 20 June 2024.
- ^ Brownlee, Gerry (18 April 2012). "Launch of the Central Christchurch Development Unit". beehive.govt.nz. Retrieved 25 August 2024.
- ^ "New unit for the rebuild of central Christchurch" (PDF). Department of the Prime Minister and Cabinet. 18 April 2012. Retrieved 20 June 2024.
- ^ "Crane begins tower's demolition". The Press. 23 April 2012. Retrieved 22 June 2024.
- ^ "Magnitude 6.2, Fri Apr 24 2015 3:36 PM". GeoNet. Retrieved 9 June 2024.
- ^ "Crowne Plaza demolition almost complete". The Press. April 2012. Retrieved 7 June 2024 – via Stuff.
- ^ "The Cathedral File released to public" (PDF). Department of the Prime Minister and Cabinet. 27 April 2012. Retrieved 20 June 2024.
- ^ "Kaiapoi to trial prohibited access signs" (PDF). Department of the Prime Minister and Cabinet. 27 April 2012. Retrieved 20 June 2024.
- ^ "No Southshore decision yet" (PDF). Department of the Prime Minister and Cabinet. 1 May 2012. Retrieved 20 June 2024.
- ^ "Hotel Grand Chancellor comes to a spectacular end". The New Zealand Herald. 8 May 2012. Retrieved 8 June 2024.
- ^ "Orange zone gone but some still in limbo". The Press. Stuff. 19 May 2012. Retrieved 2 July 2024.
- ^ a b "Land zone announcement Friday 18 May 2012". Canterbury Earthquake Recovery Authority. 18 May 2012. Archived from the original on 16 November 2012. Retrieved 9 June 2024.
- ^ "Parklands East stays green TC3" (PDF). Department of the Prime Minister and Cabinet. Retrieved 21 June 2024.
- ^ "Magnitude 5.5, Fri May 25 2012 2:44 PM". GeoNet. Retrieved 9 June 2024.
- ^ "Earthquake Recovery Strategy launched" (PDF). Department of the Prime Minister and Cabinet. 31 May 2012. Retrieved 21 June 2024.
- ^ a b "Zoning review process in place" (PDF). Department of the Prime Minister and Cabinet. 15 June 2012. Retrieved 22 June 2024.
- ^ "Snow issues - 11.50am Wednesday 6 June 2012" (PDF). Department of the Prime Minister and Cabinet. 6 June 2012. Retrieved 21 June 2024.
- ^ "Canterbury Club's history revealed". The Press. 2 May 2012. Retrieved 6 June 2024.
- ^ "Road change update" (PDF). Department of the Prime Minister and Cabinet. 14 June 2012. Retrieved 21 June 2024.
- ^ a b "Durham Street open again". RNZ. 15 June 2012. Retrieved 9 October 2024.
- ^ "Upcoming CBD cordon changes" (PDF). Department of the Prime Minister and Cabinet. 13 June 2012. Retrieved 21 June 2024.
- ^ "Red zone offer extended to new categories" (PDF). Department of the Prime Minister and Cabinet. 15 June 2012. Retrieved 21 June 2024.
- ^ "Hearing CTV Building Beginning 25 June 2012 – Royal Commission of Inquiry into Building Failure Caused by the Canterbury Earthquakes". canterbury.royalcommission.govt.nz. Retrieved 6 June 2024.
- ^ "Over 1100 Port Hills properties zoned green" (PDF). Department of the Prime Minister and Cabinet. 29 June 2012. Retrieved 22 June 2024.
- ^ "285 Port Hills properties zoned red" (PDF). Department of the Prime Minister and Cabinet. 29 June 2012. Retrieved 22 June 2024.
- ^ "Small number of properties remain white zoned" (PDF). Department of the Prime Minister and Cabinet. 29 June 2012. Retrieved 22 June 2024.
- ^ a b c d e f "Royal Commission of Inquiry into Building Failure Caused by the Canterbury Earthquakes – Royal Commission of Inquiry into Building Failure Caused by the Canterbury Earthquakes". canterbury.royalcommission.govt.nz. Retrieved 6 June 2024.
- ^ "Flat land zoning review – applications closed" (PDF). Department of the Prime Minister and Cabinet. 2 July 2012. Retrieved 22 June 2024.
- ^ "Red zone offers a roaring success" (PDF). Department of the Prime Minister and Cabinet. 15 June 2012. Retrieved 21 June 2024.
- ^ "Panel Discussion on Winter Resilience" (PDF). Department of the Prime Minister and Cabinet. 11 July 2012. Retrieved 22 June 2024.
- ^ "Gloucester Street pedestrian Open Day" (PDF). Department of the Prime Minister and Cabinet. 12 July 2012. Retrieved 25 June 2024.
- ^ "Red zone bus tours begin". RNZ. 17 July 2012. Retrieved 16 June 2024.
- ^ "Digging to start for cardboard cathedral". RNZ. 23 July 2012. Retrieved 6 June 2024.
- ^ "Christchurch Central Recovery Plan | Department of the Prime Minister and Cabinet (DPMC)". www.dpmc.govt.nz. 23 December 2021. Retrieved 6 June 2024.
- ^ "Impressive projects anchor a compact, green city" (PDF). Department of the Prime Minister and Cabinet. 30 July 2012. Retrieved 28 June 2024.
- ^ "Victoria Square tree planting ceremony" (PDF). Department of the Prime Minister and Cabinet. 31 July 2012. Retrieved 28 June 2024.
- ^ a b "Helping Canterbury to recover". Ministry of Social Development. Retrieved 26 June 2024.
- ^ a b c d "Christchurch Central Recovery Plan community meetings" (PDF). Department of the Prime Minister and Cabinet. 3 August 2012. Retrieved 28 June 2024.
- ^ Bayer, Kurt (8 August 2012). "CTV construction manager not 'up to the job'". The New Zealand Herald. Retrieved 8 June 2024.
- ^ "Further 126 Port Hills properties rezoned" (PDF). Department of the Prime Minister and Cabinet. 17 August 2012. Retrieved 29 June 2024.
- ^ "Old railway station demolition begins". The Press. 15 August 2012. Retrieved 9 June 2024 – via Stuff.
- ^ "The Blueprint comes alive !" (PDF). Departmento f the Prime Minister and Cabinet. 16 August 2012. Retrieved 28 June 2024.
- ^ "Reopening of Tuam Street" (PDF). Department of the Prime Minister and Cabinet. 6 September 2012. Retrieved 29 June 2024.
- ^ "Christchurch's roadmap for infrastructure rebuild" (PDF). Department of the Prime Minister and Cabinet. 7 September 2012.
- ^ "Port Hills rock roll zoning complete" (PDF). Department of the Prime Minister and Cabinet. 13 September 2012. Retrieved 29 June 2024.
- ^ "CTV builder's lies exposed". The Press. 15 September 2012. Retrieved 8 June 2024 – via PressReader.
- ^ "CERA to harness philanthropic offers" (PDF). Department of the Prime Minister and Cabinet. 20 September 2012. Retrieved 30 June 2024.
- ^ "Temporary closure of Gloucester Street" (PDF). Department of the Prime Minister and Cabinet. 24 September 2012. Retrieved 1 July 2024.
- ^ "CERA releases flat land geotechnical data" (PDF). Department of the Prime Minister and Cabinet. 27 September 2012. Retrieved 1 July 2024.
- ^ "Our disappearing city centre". The Press. 29 September 2012. Retrieved 8 June 2024 – via Stuff.
- ^ "Dome saved from destruction". The Press. 27 September 2012. Retrieved 23 August 2024.
- ^ "Watch the Farmers car park demolition". The Press. 11 October 2012. Retrieved 8 June 2024 – via Stuff.
- ^ a b "Cameras combating crime in the Red Zone" (PDF). Department of the Prime Minister and Cabinet. 3 May 2013. Retrieved 11 July 2024.
- ^ a b Smith, Cullen (5 October 2012). "Cranmer Court demolition 'all bad news'". Christchuch Star. Retrieved 10 July 2024.
- ^ "Protests as Cranmer Court is demolished". 3 News. 4 October 2012. Archived from the original on 20 October 2012. Retrieved 10 July 2024.
- ^ "Port Hills review process announced" (PDF). Department of the Prime Minister and Cabinet. 9 October 2012. Retrieved 2 July 2024.
- ^ "TC3 workshop a positive step" (PDF). Department of the Prime Minister and Cabinet. 10 October 2012. Retrieved 2 July 2024.
- ^ Smith (12 October 2012). "Cranmer Court falls". The Star. Archived from the original on 23 February 2013. Retrieved 10 July 2024.
- ^ Georgina Stylianou (28 October 2011). "Ballantynes Set To Reopen In Christchurch City-Centre..." Stuff.co.nz. Retrieved 7 June 2024.
- ^ "Port Hills zoning review applications closing tonight" (PDF). Department of the Prime Minister and Cabinet. 26 October 2012. Retrieved 2 July 2024.
- ^ "Port Hills 3D rockfall study released" (PDF). Department of the Prime Minister and Cabinet. 26 October 2012. Retrieved 2 July 2024.
- ^ a b "Residential land zoning complete" (PDF). Department of the Prime Minister and Cabinet. 31 October 2012. Retrieved 2 July 2024.
- ^ "Zoning review applications now tallied" (PDF). Department of the Prime Minister and Cabinet. 31 October 2012. Retrieved 3 July 2024.
- ^ Stylianou, Georgina (9 November 2012). "C1 Espresso finally reopens". Stuff. Archived from the original on 19 March 2024. Retrieved 3 August 2024.
- ^ a b "Draft Transport Plan open for public consultation" (PDF). Department of the Prime Minister and Cabinet. 15 November 2012. Retrieved 3 July 2024.
- ^ a b "Helping Canterbury to recover". Ministry of Social Development. Retrieved 26 June 2024.
- ^ "Canterbury Skills and Employment Hub opens". Beehive. 23 November 2012. Retrieved 26 June 2024.
- ^ "Speedy demolition this weekend" (PDF). Department of the Prime Minister and Cabinet. 21 November 2012. Retrieved 3 July 2024.
- ^ "CTV royal commission finds deficiencies". Stuff. 10 December 2012. Retrieved 24 June 2024.
- ^ "Economic recovery programme launched" (PDF). Department of the Prime Minister and Cabinet. 6 December 2012. Retrieved 3 July 2024.
- ^ "Appointments made for work on first CBD anchor projects" (PDF). Department of the Prime Minister and Cabinet. 20 December 2012. Retrieved 3 July 2024.
- ^ "Prestons donates soil to CBD rebuild" (PDF). Department of the Prime Minister and Cabinet. 30 January 2013. Retrieved 4 July 2024.
- ^ "Last chance to have a say on transport in central Christchurch" (PDF). Department of the Prime Minister and Cabinet. 24 January 2013. Retrieved 4 July 2024.
- ^ "Time-lapse video of the Christchurch Central Business District, 1 February 2012 to 31 January 2013" (PDF). Department of the Prime Minister and Cabinet. 8 February 2013. Retrieved 4 July 2024.
- ^ "Central city officially a rebuild zone | Beehive.govt.nz". www.beehive.govt.nz. Retrieved 6 June 2024.
- ^ "Port Hills zoning review ongoing" (PDF). Department of the Prime Minister and Cabinet. 21 February 2013. Retrieved 5 July 2024.
- ^ "Foundation pour cements signs of progress" (PDF). Department of the Prime Minister and Cabinet. 27 February 2013. Retrieved 5 July 2024.
- ^ "University of Canterbury James Hight Library". Hawkins NZ. Retrieved 7 June 2024.
- ^ Greenhill, Marc (5 July 2012). "Abandoned central-city hotel bears signs of better times". The Press. Christchurch. p. A3.
- ^ "Quake museum on the move". Christchurch City Council. 16 June 2017. Retrieved 21 August 2024.
- ^ "Housing quake repairs off target - Labour". The Press. Retrieved 7 October 2024.
- ^ "New tourism opportunities in Rebuild Zone" (PDF). Department of the Prime Minister and Cabinet. 6 March 2013. Retrieved 5 July 2024.
- ^ "Sod turning marks start of Avon River Precinct" (PDF). Department of the Prime Minister and Cabinet. 23 March 2013. Retrieved 5 July 2024.
- ^ "CBD Rebuild Zone tours get green light" (PDF). Department of the Prime Minister and Cabinet. 27 March 2013. Retrieved 7 July 2024.
- ^ "Cordon reduction opens up further access to CBD" (PDF). Department of the Prime Minister and Cabinet. 28 March 2013. Retrieved 7 July 2024.
- ^ "Another blow for Port Hills". The Press. 10 April 2013. Retrieved 16 July 2024.
- ^ "Residential Advisory Service to be launched" (PDF). Department of the Prime Minister and Cabinet. 19 April 2013. Retrieved 8 July 2024.
- ^ "Cordon reduced in three more areas" (PDF). Department of the Prime Minister and Cabinet. 19 April 2013. Retrieved 8 July 2024.
- ^ "Greater Christchurch Recovery Update May 2013" (PDF). Department of the Prime Minister and Cabinet. May 2013. Retrieved 9 June 2024.
- ^ Gates, Charlie (16 April 2013). "New Regent St reopens with five shops". The Press. Retrieved 28 February 2016.
- ^ "Cordon reduced in three more areas" (PDF). Department of the Prime Minister and Cabinet. 19 April 2013. Retrieved 8 July 2024.
- ^ Hume, Myles (17 December 2015). "Anzac Day deadline for Bridge of Remembrance". The Press. p. A1. Retrieved 6 June 2024.
- ^ Stylianou, Georgina (1 May 2013). "Rendezvous Hotel reopens today". The Press. p. A2. Retrieved 7 June 2024.
- ^ "Further rebuild zone reductions" (PDF). Department of the Prime Minister and Cabinet. 14 May 2013. Retrieved 11 July 2024.
- ^ "Residential red zone demolition full steam ahead" (PDF). Department of the Prime Minister and Cabinet. 15 May 2013. Retrieved 11 July 2024.
- ^ "Residential Advisory Service going live" (PDF). Department of the Prime Minister and Cabinet. 15 May 2013. Retrieved 11 July 2024.
- ^ "Canterbury's strength in recovery highlighted at United Nations forum" (PDF). Department of the Prime Minister and Cabinet. 22 May 2013. Retrieved 11 July 2024.
- ^ Lee, Francesca (25 May 2013). "Million dollar donation to rebuild Lyttelton Timeball". The Press. Retrieved 9 August 2024.
- ^ "Case-by-case extension criteria confirmed" (PDF). Department of the Prime Minister and Cabinet. 28 May 2013. Retrieved 12 July 2024.
- ^ "Residents return home after Lucas Lane work completed" (PDF). Department of the Prime Minister and Cabinet. 31 May 2013. Retrieved 12 July 2024.
- ^ "700 new homes announced for Christchurch" (PDF). Department of the Prime Minister and Cabinet. 31 May 2013. Retrieved 12 July 2024.
- ^ Lee, Francesca (6 June 2013). "Tower blocks 'slammed' during quakes". The Press. Retrieved 8 June 2024 – via Stuff.
- ^ "Rebuild Zone cordon now removed north of Gloucester Street" (PDF). Department of the Prime Minister and Cabinet. 7 June 2013. Retrieved 12 July 2024.
- ^ "Offer period extension for Port Hills residents" (PDF). Department of the Prime Minister and Cabinet. 10 June 2013. Retrieved 12 July 2024.
- ^ "Second inner city area of Rebuild Zone cordon removed" (PDF). Department of the Prime Minister and Cabinet. 14 June 2013. Retrieved 12 July 2024.
- ^ "Extensions granted for Red Zone property owners" (PDF). Department of the Prime Minister and Cabinet. 21 June 2013. Retrieved 12 July 2024.
- ^ "Index sets the scene for recovery" (PDF). Department of the Prime Minister and Cabinet. 26 June 2013. Retrieved 12 July 2024.
- ^ "Crown and Council agree recovery costs" (PDF). Department of the Prime Minister and Cabinet. 27 June 2013. Retrieved 14 July 2024.
- ^ Stewart, Ashleigh (29 June 2013). "Red-zone fences come down". The Press. Retrieved 6 June 2024.
- ^ a b Small, Jamie (30 April 2017). "Christchurch City Council buys Linwood temporary housing village off Government". The Press. Retrieved 24 June 2024.
- ^ "Copthorne Hotel site future up in air". businessday. 10 July 2013. Retrieved 8 June 2024 – via Stuff.
- ^ "CTV site purchased by the Crown" (PDF). Department of the Prime Minister and Cabinet. 17 July 2013. Retrieved 14 July 2024.
- ^ "The ChristChurch Cathedral". my.christchurchcitylibraries.com. Retrieved 6 June 2024.
- ^ "Final offers sent to property owners in anchor project areas" (PDF). Department of the Prime Minister and Cabinet. 9 August 2013. Retrieved 14 July 2024.
- ^ "Novotel Christchurch Celebrates Reopening | Scoop News". www.scoop.co.nz. 22 August 2013. Retrieved 7 June 2024.
- ^ "Government postpones Port Hills announcement" (PDF). Department of the Prime Minister and Cabinet. 28 August 2013. Retrieved 14 July 2024.
- ^ Bayer, Kurt (29 August 2013). "Vote saves Christchurch Town Hall". The New Zealand Herald. Retrieved 7 June 2024.
- ^ "First stage of first anchor project opens" (PDF). Department of the Prime Minister and Cabinet. 29 August 2013. Retrieved 14 July 2024.
- ^ "Market Update" (PDF). Department of the Prime Minister and Cabinet. 29 August 2013. Retrieved 14 July 2024.
- ^ "Interactive city map now online" (PDF). Department of the Prime Minister and Cabinet. 2 September 2013. Retrieved 14 July 2024.
- ^ "Decisions reached on properties in The Frame as rebuild progresses" (PDF). Department of the Prime Minister and Cabinet. 5 September 2013. Retrieved 17 July 2024.
- ^ Pearson, Anna (18 September 2013). "Linwood quake homes unveiled". The Press. Retrieved 24 June 2024.
- ^ "Crown purchases PGC site" (PDF). Department of the Prime Minister and Cabinet. 19 September 2013. Retrieved 17 July 2024.
- ^ "Crown buys PGC site for north frame". The Press. 19 September 2013. Retrieved 18 July 2024.
- ^ "Minister attends trifecta of CBD progress" (PDF). Department of the Prime Minister and Cabinet. 20 September 2013. Retrieved 29 July 2024.
- ^ "Market Update - Justice and Emergency Services Precinct" (PDF). Department of the Prime Minister and Cabinet. 4 September 2013. Retrieved 17 July 2024.
- ^ a b "Wellbeing survey targets the voice of youth" (PDF). Department of the Prime Minister and Cabinet. 25 September 2013. Retrieved 18 July 2024.
- ^ "First compulsory acquisitions in Christchurch CBD" (PDF). Department of the Prime Minister and Cabinet. 2 October 2013. Retrieved 19 July 2024.
- ^ "Further delay for Port Hills landowners". RNZ. 26 October 2013. Retrieved 16 July 2024.
- ^ "Amazing Place CBD project competition winners unveiled" (PDF). Department of the Prime Minister and Cabinet. 30 October 2013. Retrieved 20 July 2024.
- ^ "Inner city Christchurch transport plan released" (PDF). Department of the Prime Minister and Cabinet. 30 October 2013. Retrieved 23 July 2024.
- ^ "St. Paul's Anglican Church Cemetery, Papanui". my.christchurchcitylibraries.com. Retrieved 9 June 2024.
- ^ "Port Hills slope stability report released". The New Zealand Herald. 6 November 2013. Retrieved 16 July 2024.
- ^ "Greater Christchurch Education Renewal Property Programme". beehive.govt.nz. 15 November 2013. Retrieved 7 December 2024.
- ^ "Rebuilding Christchurch schools". Ministry of Education. 30 September 2024. Retrieved 7 December 2024.
- ^ Gates, Charlie (29 November 2013). "New Regent St fence being removed". The Press. Retrieved 9 June 2024 – via Stuff.
- ^ "Judgment allows Port Hills zoning review to progress" (PDF). Department of the Prime Minister and Cabinet. 3 December 2013. Retrieved 26 July 2024.
- ^ "Crown and Council Reach Cost Share Agreement" (PDF). Department of the Prime Minister and Cabinet. 3 December 2013. Retrieved 26 July 2024.
- ^ "Port Hills zoning review announced" (PDF). Department of the Prime Minister and Cabinet. 5 December 2013. Retrieved 26 July 2024.
- ^ a b "Christmas support service hours" (PDF). Department of the Prime Minister and Cabinet. 24 December 2013. Retrieved 27 July 2024.
- ^ O'Connor, Sarah-Jane (20 January 2014). "Victoria Apartments demolition begins". The Press. Retrieved 8 June 2024 – via Stuff.
- ^ "Silence at Scott Base for quake victims". RNZ. 22 February 2014. Retrieved 9 June 2024.
- ^ "1000th Christchurch state house repair marked". Housing New Zealand. 11 April 2014. Retrieved 13 October 2024.
- ^ "Development of new Bus Interchange to be aligned with street works" (PDF). Department of the Prime Minister and Cabinet. 28 April 2014. Retrieved 17 October 2024.
- ^ "Work begins for An Accessible City" (PDF). Department of the Prime Minister and Cabinet. 5 May 2014. Retrieved 17 October 2024.
- ^ "New start for Re:START Mall". Canterbury Earthquake Recovery Authority. 13 June 2014. Archived from the original on 24 January 2015. Retrieved 9 June 2024.
- ^ "Construction begins on Bus Interchange" (PDF). Department of the Prime Minister and Cabinet. 24 June 2014. Retrieved 19 October 2024.
- ^ "Christchurch Justice and Emergency Services Precinct contractor announced". beehive.govt.nz. 1 July 2014. Retrieved 13 August 2024.
- ^ "Memorial design ideas impress" (PDF). Department of the Prime Minister and Cabinet. 3 September 2014. Retrieved 29 October 2024.
- ^ "Construction starts on The Terraces" (PDF). Department of the Prime Minister and Cabinet. 10 October 2014. Retrieved 29 July 2024.
- ^ "Victoria Clock Tower / Jubilee Clock". my.christchurchcitylibraries.com. Retrieved 9 June 2024.
- ^ "Acting chief executive of CERA appointed" (PDF). Department of the Prime Minister and Cabinet. 19 November 2014. Retrieved 27 July 2024.
- ^ "1240 central Christchurch buildings demolished". The Press. Stuff. 20 February 2015. Retrieved 17 June 2024.
- ^ Hume, Myles (31 May 2015). "Watch: Christchurch's central police station implosion". The Press. Retrieved 7 June 2024.
- ^ "Ministers welcome 5000th Christchurch repair". beehive.govt.nz. 27 November 2015. Retrieved 7 October 2024.
- ^ Gates, Charlie (19 December 2015). "Christchurch Art Gallery reopening after nearly 5 years of closure". The Press. Retrieved 7 June 2024.
- ^ "Multimillion-dollar Margaret Mahy playground open for fun in Christchurch". The Press. 22 December 2015. Retrieved 9 June 2024.
- ^ "Historical emergencies". www.civildefence.govt.nz. Retrieved 10 June 2024.
- ^ "Canterbury Skills & Employment Hub extended for two years". Beehive. 5 April 2016. Retrieved 26 June 2024.
- ^ "The Bridge of Remembrance". my.christchurchcitylibraries.com. Retrieved 29 July 2024.
- ^ Spink, Emily (2 May 2016). "New Regent Street back on track for trams". The Press. p. A3. Retrieved 9 June 2024.
- ^ "$276 million announced for Canterbury schools rebuild". The New Zealand Herald. 30 May 2016. Retrieved 7 December 2024.
- ^ "Avon River terraces help bring Chch alive - PM". RNZ. 23 June 2016. Retrieved 29 July 2024.
- ^ "Rockfall: Design considerations for passive protection structures". Ministry of Business, Innovation and Employment. 29 November 2016. Retrieved 12 July 2024.
- ^ Gates, Charlie (22 December 2016). "Rolleston back where he belongs". The Press. p. A3. Retrieved 9 June 2024.
- ^ "Quake-hit farmers applaud cheap homes offered by Government". Stuff. 18 January 2017. Retrieved 24 June 2024.
- ^ "Christchurch's Sign of the Kiwi reopens in time for 100th anniversary". The Press. 23 January 2017. Retrieved 7 June 2024 – via Stuff.
- ^ "Responses to the Canterbury Earthquakes Royal Commission recommendations" (PDF). Ministry of Business, Innovation and Employment. February 2017. Retrieved 12 July 2024.
- ^ "Fendalton war memorial church | NZ History". nzhistory.govt.nz. Retrieved 6 June 2024.
- ^ "Canterbury earthquake memorial to open for February 22, 2017 anniversary". The Press. 6 January 2017. Retrieved 6 June 2024.
- ^ "New home for Community Church". Waterford Press. 23 March 2017. p. 97. Retrieved 11 July 2024 – via Issuu.
- ^ "Lancaster Park Stadium to be deconstructed". Newsline. 27 March 2017. Retrieved 6 June 2024.
- ^ "Brownlee bows out of Christchurch rebuild". RNZ. 24 April 2017. Retrieved 7 June 2024.
- ^ "Christchurch's Linwood Park reverts back to sportsfield a decade after earthquakes". The Press. 21 December 2021. Retrieved 24 June 2024.
- ^ "Post-quake village at Kaiapoi no more". RNZ. 17 May 2017. Retrieved 24 June 2024.
- ^ "Sydenham church heritage rubble gone by end of July". The Press. 12 June 2017. Retrieved 9 June 2024 – via Stuff.
- ^ McDonald, Liz (29 June 2017). "Christchurch's new Crowne Plaza hotel to open this weekend after 'long haul'". The Press. Retrieved 8 June 2024 – via Stuff.
- ^ "Lyttelton Timeball". Heritage New Zealand. Archived from the original on 25 June 2018. Retrieved 9 August 2024.
- ^ "Restored Rose Chapel blooms again". Newsline. 24 July 2018. Retrieved 9 June 2024.
- ^ "Whole of Government Report: Lessons from the Canterbury earthquake sequence". Department of the Prime Minister and Cabinet. 30 July 2017. Retrieved 1 July 2024.
- ^ "New Christchurch Crowne Plaza launching with conference spaces". Stuff. 11 April 2017. Retrieved 14 June 2017.
- ^ Mann, Charley (27 March 2012). "Work on cathedral demolition under way". The Press. Retrieved 7 June 2024.
- ^ "Work begins on restoring Nurses' Memorial Chapel". Newsline. 13 September 2017. Retrieved 9 June 2024.
- ^ "Christchurch statues". my.christchurchcitylibraries.com. Retrieved 9 June 2024.
- ^ McDonald, Liz (31 January 2018). "Christchurch container mall tenants scatter as six-year-old 'temporary' community ends". The Press. Retrieved 19 June 2024.
- ^ McDonald, Liz. "New Distinction Hotel opens in former central Christchurch Millennium building". stuff.co.nz. Retrieved 9 March 2018.
- ^ "Joint venture agreement on Cathedral signed". Christchurch City Council. 22 August 2018. Retrieved 7 June 2024.
- ^ "Re-opening of the Nurses Memorial Chapel". gg.govt.nz. 27 October 2018. Retrieved 24 July 2023.
- ^ "Lyttelton Timeball". Heritage New Zealand. Archived from the original on 28 November 2018. Retrieved 9 August 2024.
- ^ Hayward, Michael (24 February 2019). "Public gets first taste of $167m Christchurch Town Hall restoration". The Press. Retrieved 7 June 2024.
- ^ "Prince William pays his respects at the Canterbury Earthquake Memorial". The New Zealand Herald. 26 April 2019. Retrieved 1 August 2024.
- ^ "Earthquake-hit ex-Rydges hotel building clears High Court insurance battle". Stuff. 30 April 2019. Retrieved 8 June 2024.
- ^ "Bishop chooses demolition for Christchurch's historic Catholic cathedral". The Press. 4 August 2019. Retrieved 12 December 2024.
- ^ "Christchurch's Lancaster Park stadium demo nears end". Newsline. 10 September 2019. Retrieved 7 June 2024.
- ^ "Sign of the Takahe to reopen as a 'friendly and welcoming' cafe and bar". Star News. 27 June 2019. Retrieved 1 September 2024.
- ^ "Opawa Library rebuild to start this month". Star News. 19 September 2019. Retrieved 16 July 2024.
- ^ "A person was killed in the 2010 earthquake, but we've only just found out about it". Stuff. 12 November 2022. Retrieved 29 July 2024.
- ^ "Linwood Park temporary housing on the move". Newsline. 4 December 2019. Retrieved 24 June 2024.
- ^ "Historic Odeon Theatre sells at busy auction in Christchurch". One Roof. 21 August 2020. Retrieved 17 August 2024.
- ^ "Demolition work starts on quake-damaged Christchurch Catholic cathedral". The Press. 1 September 2020. Retrieved 12 December 2020.
- ^ "Last emergency earthquake house moved off Christchurch's Linwood Park". The Press. 6 September 2020. Retrieved 24 June 2024.
- ^ "Christchurch earthquake: Never before seen photos to be released to mark 10th anniversary". The New Zealand Herald. 16 February 2021. Retrieved 5 October 2024.
- ^ "Church back in Church Corner: 10-year effort to repair quake-damaged building". Stuff. 28 February 2021. Retrieved 25 August 2021.
- ^ "Final Christchurch red zone demolition underway | Toitū Te Whenua – Land Information New Zealand". www.linz.govt.nz. 21 September 2021. Retrieved 9 June 2024.
- ^ "Christchurch residential red zones | Toitū Te Whenua – Land Information New Zealand". www.linz.govt.nz. 4 August 2023. Retrieved 9 June 2024.
- ^ "Te Pae opens in Christchurch with 100 events booked for 2022". Stuff. 17 December 2021. Retrieved 6 October 2024.
- ^ "Govt announces $301 million for Chch schools damaged by earthquakes". 1News. 3 March 2023. Retrieved 7 December 2024.
- ^ Gates, Charlie (28 March 2023). "Public invited to take chair home from famous earthquake memorial". The Press. Stuff. Retrieved 26 July 2023.
- ^ a b Harris, Dominic (22 February 2024). "In pictures: the end of a city eyesore". The Press. Retrieved 8 June 2024.
- ^ "Work begins to restore central landmark hotel". Star News. 19 December 2023. Retrieved 8 June 2024 – via Otago Daily Times.
- ^ "Shipping containers finally removed from Odeon Theatre". Otago Daily Times. 15 January 2024. Retrieved 17 August 2024.
- ^ "Scaffolding removed". The Press. 20 April 2024. Retrieved 9 June 2024 – via PressReader.
- ^ "Christ Church Cathedral: No more taxpayer funding for rebuild". RNZ. 9 August 2024. Retrieved 10 August 2024.
- ^ Leask, Anna (25 September 2024). "CTV building collapse: Design company owner knew employee 'lacked the necessary experience to design such buildings' and 'failed to provide adequate supervision'". The New Zealand Herald. Archived from the original on 25 September 2024. Retrieved 25 September 2024.