Choir–Sainshand Transmission Line

From Wikipedia, the free encyclopedia

Choir–Sainshand Transmission Line
Чойр-Сайншандын Цахилгаан Дамжуулах Aгаарын Шугам
Location
CountryMongolia
FromChoir
ToSainshand
Construction information
Construction started2025
Expected2027
Technical information
Typetransmission line
Type of currentAC
Total length220 km (140 mi)
AC voltage220 kV

The Choir–Sainshand Transmission Line (Mongolian: Чойр-Сайншандын Цахилгаан Дамжуулах Aгаарын Шугам) is an transmission line in Mongolia connecting Choir and Sainshand.

History

[edit]

The construction of the transmission line is expected to start in 2025 and completed by 2027.[1][2]

Technical specifications

[edit]

The transmission line will have a total length of 220 km with voltage level of 220 kV. It will be a double circuit line. It will also include the construction of substations in both towns.[1]

Finance

[edit]

The construction of the transmission line will be financed by funds from the European Union, European Bank for Reconstruction and Development and various donors with a total amount of EUR79.67 million.[1]

See also

[edit]

References

[edit]
  1. ^ a b c B., Ooluun (10 October 2024). "Mongolia Partners with the EU and EBRD to Boost Renewable Energy Infrastructures". Mongolian National News Agency. Retrieved 6 January 2025.
  2. ^ "EU and Mongolia sign transmission line deal". Transformers Magazine. 11 October 2024. Retrieved 6 January 2025.