Jump to content

Calamba station

Coordinates: 14°12′25.02″N 121°09′29.08″E / 14.2069500°N 121.1580778°E / 14.2069500; 121.1580778
From Wikipedia, the free encyclopedia
(Redirected from Calamba railway station)
Calamba
Exterior of Calamba station
General information
LocationJ.P. Rizal Street, Poblacion
Calamba, Laguna
Philippines
Coordinates14°12′25.02″N 121°09′29.08″E / 14.2069500°N 121.1580778°E / 14.2069500; 121.1580778
Owned byPhilippine National Railways
Operated byPhilippine National Railways
Line(s)  South Main Line
Planned: South Commuter
Former:   Batangas
PlatformsSide platform
TracksThree:
2 siding tracks
1 mainline track
Construction
Structure typeAt grade
AccessibleYes
Other information
Station codeLA
History
OpenedJanuary 24, 1909; 115 years ago (1909-01-24)
December 2, 2014; 10 years ago (2014-12-02) (current station)[1]
Rebuilt2013; 11 years ago (2013)
Services
Preceding station PNR Following station
Mamatid
towards Tutuban
Metro South Commuter Pansol
towards IRRI
Biñan
towards Tutuban
Bicol Express San Pablo
towards Legazpi
Isarog Limited San Pablo
towards Naga
Location
Calamba is located in Laguna
Calamba
Calamba
Location in Laguna
Calamba is located in Luzon
Calamba
Calamba
Location in Luzon
Calamba is located in Philippines
Calamba
Calamba
Location in the Philippines

Calamba station is a railway station located on the South Main Line in Laguna, Philippines. It is one of two railway stations in the city and it is a major station on the line, serving as the junction between the South Main Line and the old Calamba–Batangas branch line which used to connect to Batangas City. It is also envisioned to be the terminus of the Commuter Express when rehabilitation work is complete. The station was first opened on January 24, 1909.

The existing PNR line from Calamba to Legazpi is conventional ballasted track, where parallel steel rails are laid upon sleepers embedded in ballast (except on open deck bridges). Embankment is either on fill or at grade. Rails weigh 37 kg/m and are laid on sleepers of both wood and concrete. From Calamba to Legazpi, most stations and flag stops have been used for non-railway purposes such as residences, storage areas or as public gathering areas. Most of these stations south of Calamba are in conditions insufficient for efficient and safe operations as a railway passenger station. From Calamba to Legazpi, the line is single-tracked and, similar to the Commuter Line, is narrow gauge (1,067 mm).Overall, the condition of the existing PNR line from Calamba to Legazpi is in fair condition largely on account of good construction, relatively light axle loads and very little accumulated traffic. Most rail defects and damage is due to poor maintenance of joints. Bridges are in widely varying states largely due to lack of maintenance, old age and inadequate protection from natural elements.[2]

Major landmarks near the station include SM City Calamba, the Calamba Central Bus and Jeepney Terminal, and the Calamba Medical Center.

Hybrid Electric Train

[edit]
DOST-MIRDC Hybrid Electric Train (HET) awaiting departure at Calamba station

The Hybrid Electric Train headquarters is also located at Calamba station departure, built by Department of Science and Technology's Metals Industry Research and Development Center, It is the main station of the Hybrid Electric Train (HET), runs from Calamba to San Pablo in Laguna to the south on May 6, 2019. The train project began 2012 and built in year 2014–2015.[3][4] The project was introduced to the public and the media in June 2016.[5]

Reconstruction

[edit]

A new Calamba station will be constructed beside the José Rizal Coliseum (simple) at Barangay Real as part of the North–South Commuter Railway. This new station is expected to be fully operational along with the rest of the system by 2029.[6]

On October 21, 2024, the PNR resumed its PNR South Main Line services for the Lucena-Calamba-Lucena line. The PNR train stops include San Pablo station, Calamba, Sariaya, Lutucan, Candelaria, Tiaong (Lalig), IRRI, UP Los Baños station-Junction station, Masili and Pansol stations.[7]

References

[edit]
  1. ^ "PNR launches Tutuban-Calamba route tomorrow". Official Gazette. December 1, 2014.
  2. ^ https://ppp.gov.ph/wp content/uploads/2015/08/NSRP_PIM_FINAL.pdf
  3. ^ Cruz, Cherryl Ann (February 21, 2019). "Meet the First Filipino-Built Train: The Hybrid Electric Train (HET)". Carmudi. Retrieved April 24, 2019.
  4. ^ Rey, Aika (January 22, 2019). "PNR to run first Philippine-made train". Rappler. Retrieved April 24, 2019.
  5. ^ "DOST Usec. Guevarra join the Hybrid Electric Train Project Team in its crush load testing". Metals Industry Research and Development Center. Archived from the original on July 27, 2018. Retrieved April 24, 2019.
  6. ^ "4 North-South Railway contracts awarded". PortCalls Asia. October 6, 2022. Retrieved October 6, 2022.
  7. ^ "PNR resumes Lucena-Calamba-Lucena trips". GMA Network. October 21, 2024. Retrieved October 22, 2024.