Bee Network
Bee Network | |
---|---|
Overview | |
Owner | Transport for Greater Manchester |
Area served | Greater Manchester |
Transit type |
|
Number of stations | Bus: 12,000
Train: 101 Tram: 99 |
Headquarters | Manchester |
Website | tfgm |
Operation | |
Began operation | September 2023 |
Operator(s) |
The Bee Network is an integrated transport network for Greater Manchester, comprising bus, tram, cycling and walking routes. Transport for Greater Manchester (TfGM) is expected to have the network operational by 2025, with commuter rail services expected to be joining the network in 2028. Initially unveiled in 2018, the project is aiming to create a London-style transport system, to encourage more people to take public transport instead of cars.[1]
The design of the network is inspired around the Greater Manchester symbol, the worker bee, with bus and tram liveries coloured yellow and black to represent this.[2]
History
[edit]Chris Boardman, the Greater Manchester Cycling and Walking Commissioner published documents in 2017 setting out plans.[3] The project would include 121 kilometres (75 mi) of segregated cycling lanes, brand new electric buses, around 2,900 kilometres (1,800 mi) of new dedicated walking and cycling routes, 2,400 new road crossings and a new cycle hire scheme throughout the region.[4][5]
Following on from the GMCA's decision to bring in a bus franchising scheme under the Bus Services Act 2017 in March 2021, the Bee Network concept was expanded to cover all forms of public transport - tram, bus and commuter rail - as well as active travel. The active travel component of the network was rebranded as the Bee Active Network.
A cycle hire scheme launched in late 2021 using Beryl bikes.[6]
In June 2022, Mayor of Greater Manchester Andy Burnham announced capped fares for buses from September 2022 in order to help with cost-of-living rises. The new fares would see full day fares capped at £5, and single trips capped at £2.[7][a]
The first fleet of 50 Alexander Dennis Enviro400EV battery electric buses were rolled out across Bolton, Wigan and parts of Bury and Salford on 24 September 2023. Go North West and Diamond North West have been awarded two large franchises and seven small franchises, respectively, displacing the current operations of Arriva North West, First Greater Manchester, Stagecoach Manchester and Vision Bus in this area.[8][9] The fleet was expanded with an additional 50 Enviro400EV buses in Oldham, Rochdale and the remainder of Bury on 24 March 2024,[8][10] as well as with 67 Alexander Dennis Enviro200 MMCs on services operated by Diamond North West.[11]
Cycling
[edit]One of the major policies of the Bee Network is making it easy, safe and attractive for people to travel on foot or by bike for everyday trips. A large focus is being put on to cycling in this project, therefore TfGM are investing money in many things that encourage cycling in combination with Local Authorities such as cycling infrastructure, Cycle hire scheme, Cycle hubs and many courses to help people learn to ride a bike.
The Bee Network will include the UK's largest cycling and walking network, with 1,800 miles of routes and 2,400 new crossings. Active Neighbourhoods also form part of the Bee Network.[12][13]
As a result of investment in cycling infrastructure, the City of Manchester was named as the first ACES European Capital of Cycling for 2024, following a bid submitted by Manchester City Council in September 2023.[14]
Bus franchising
[edit]The bus network in Greater Manchester is partially deregulated, with local control of services having been removed in 1986 as a consequence of the Transport Act 1985. However, following the enactment of the Bus Services Act 2017, mayoral combined authorities like the Greater Manchester Combined Authority have had the power to bring buses back under the control of local government by means of a franchising scheme. The GMCA is the first combined authority to use the powers under the Act,[15] and is in the process of re-regulating its system which will be implemented in three tranches from 2023 to 2025.
Tranche 1
[edit]Bolton, Wigan and parts of Bury and Salford were the first areas to be brought under the new franchising scheme from 24 September 2023. Diamond North West and Go North West were awarded contracts to operate services in this area.[8][16]
Tranche 2
[edit]The franchised area expanded to Oldham, Rochdale, the rest of Bury, further parts of Salford and north Manchester on 24 March 2024. Diamond North West, First Greater Manchester and Stagecoach Manchester were awarded contracts to operate services in this area.[17][18]
Tranche 3
[edit]The remaining parts of Greater Manchester (Stockport, Tameside, Trafford, and the rest of Manchester and Salford) will join the scheme from 5 January 2025. Metroline, Stagecoach Manchester, Go North West and Diamond North West have been awarded contracts to operate services in this area.[19]
Railways
[edit]Network Rail and Transport for Greater Manchester (TfGM) signed a collaboration agreement in August 2023 to deliver upgrades and regeneration opportunities across Manchester and Salford’s central railway stations.[20] The work will contribute toward the successful delivery of the Bee Network.
And as part of the integration of local rail services into the Bee Network, the first contactless payment on rail outside London is to be trialled on the Stalybridge to Victoria and Glossop to Piccadilly lines by early 2025. This will be followed by other lines, and a multi-modal fare cap introduced by 2030.[21]
Commuter rail was expected to fully join the Bee Network by 2030 at the latest, creating a service similar to the London Overground, but in March 2024, the Mayor of Greater Manchester announced that the date for commuter rail to join the Bee Network is intended to be brought forward from 2030 to 2028.
He also announced the first eight routes planned to join the Bee Network, as follows:[22][23]
- Wigan Wallgate – Manchester Victoria
- Stalybridge – Southport
- Glossop/Hadfield – Manchester Piccadilly
- Rose Hill Marple – Manchester Piccadilly
- Buxton – Manchester Piccadilly
- Alderley Edge – Manchester Piccadilly
- Rochdale stopping services
- Manchester Airport stopping services
In addition, a new station due to be opened at Golborne in Wigan in the mid-2020s will also be part of the Bee Network.[24]
Design
[edit]The design of the network will be based around the worker bee. The worker bee is the most well known symbol representing the city and region, and was adopted during the industrial revolution. The liveries of the trams, buses and bikes will be yellow and black, representing the worker bee. The facilities supporting the network will also follow this design[2] similar to the adoption of London Red across almost all public transport services, following the nationalisation of the London General Omnibus Company in 1933.
Gallery
[edit]Bus franchising
[edit]-
Wright Gemini 3 bodied Volvo B5LH acquired from First Manchester at St.Peter's Gate in October 2024
-
Another Wright Gemini 3 bodied Volvo B5LH at Bridge Street in October 2024
-
Enviro400EV at Bolton Interchange in September 2024
-
Bee Network branded Alexander Dennis Enviro400 MMC and Enviro 400EV, operated by Stagecoach Manchester at Oldham bus station in April 2024
-
Enviro400 City at Piccadilly Gardens in November 2024
-
Enviro400EV at Piccadilly Gardens in September 2024
Notes
[edit]- ^ The announcement of a £2 single bus journey fare cap in Greater Manchester inspired the creation of a national scheme by the Department for Transport, where from 1st Jan 2023 all bus fares are subsidised to a maximum of £2 in England only.
References
[edit]- ^ "The Bee Network". TfGM Bee Active. Retrieved 29 October 2022.
- ^ a b "Greater Manchester transport: Bee Network design revealed". BBC News. 23 September 2022. Retrieved 29 October 2022.
- ^ Boardman, Chris (December 2017). "Made to Move - 15 steps to transform Greater Manchester, by changing the way we get around" (PDF). Archived from the original (PDF) on 20 July 2021. Retrieved 11 August 2023.
- ^ "Manchester makes a Beeline for new Dutch-style cycling network". The Guardian. 26 June 2018. Retrieved 29 October 2022.
- ^ "Bee Network explained to making getting from A to B easier in Bolton". The Bolton News. 24 October 2022. Retrieved 29 October 2022.
- ^ Cox, Charlotte (27 January 2022). "How is Greater Manchester's new bike hire scheme going two months in?". Manchester Evening News. Retrieved 22 March 2023.
- ^ "Greater Manchester capped bus fares could start in September, mayor says". BBC News. 16 June 2022. Retrieved 29 October 2022.
- ^ a b c Deakin, Tim (24 December 2022). "Go-Ahead wins initial Manchester large bus franchises". Route One. Archived from the original on 24 December 2022. Retrieved 24 December 2022.
- ^ "Greater Manchester appoints first bus operators for new system". BBC News. 23 December 2022. Retrieved 24 December 2022.
- ^ "TfGM orders 50 Enviro400EVs for Bee Network". Route One. 22 September 2022. Retrieved 22 September 2022.
- ^ "Rotala orders 67 Enviro200s for Manchester franchises". routeone. 30 June 2023. Retrieved 1 July 2023.
- ^ "Active Neighbourhoods". TfGM Bee Active. Transport for Greater Manchester.
- ^ "Parsonage Road safer streets". Manchester City Council.
- ^ Britton, Paul (8 December 2023). "Manchester crowned first ever European Capital of Cycling for 2024". Manchester Evening News. Retrieved 29 April 2024.
- ^ Topham, Gwyn (8 October 2019). "Manchester to consult on bringing buses under public control". The Guardian.
- ^ Vesty, Helena (24 September 2023). "I got up at 3.30am to travel on the first revolutionary Bee Network bus... this is what it was like". Manchester Evening News. Retrieved 24 September 2023.
- ^ Davies, Ethan (23 June 2023). "Go North West is out as Stagecoach handed new Bee Network contract". Manchester Evening News. Retrieved 24 September 2023.
- ^ "Stagecoach wins in Manchester bus franchising second tranche". Route One. 23 June 2023. Retrieved 11 August 2023.
- ^ Deakin, Tim (28 March 2024). "Metroline dominates Greater Manchester franchising third tranche". routeone. Retrieved 30 March 2024.
- ^ May, Tiana (2 August 2023). "TfGM and Network Rail to Deliver Upgrades at 6 Stations in Greater Manchester". Railway-News.
- ^ Timan, Joseph (1 February 2024). "17 Greater Manchester train stations where you can tap-in and out from next year". Manchester Evening News. Retrieved 2 April 2024.
- ^ Timan, Joseph (2024-03-21). "Andy Burnham announces Bee Network rail plans to be brought forward". Manchester Evening News. Archived from the original on 2024-03-21. Retrieved 2024-04-02.
- ^ "Burnham urges rail sector to accelerate integration into Manchester's Bee Network". Railway Gazette. 2024-04-08. Retrieved 2024-05-29.
- ^ "A new rail station for Golborne". Bee Network | TfGM. Retrieved 2 April 2024.