Spotsylvania
Spotsylvania station in April 2018.
General information
Location9442 Crossroads Parkway
Olive (Fredericksburg), Virginia
United States
Coordinates38°13′17″N 77°26′28″W / 38.2214°N 77.4410°W / 38.2214; -77.4410
Owned bySpotsylvania County
Operated byVirginia Railway Express
Line(s)RF&P Subdivision
Platforms1 side platform
Tracks3
Construction
Parking1,500 spaces[1]
AccessibleYes
Other information
Fare zone9
History
OpenedNovember 16, 2015[1][2]
Passengers
20151,300 daily (expected)[3]
Services
Preceding station Virginia Railway Express Following station
Terminus Fredericksburg Line Fredericksburg
Location
Map

Spotsylvania station is a commuter rail station on the Virginia Railway Express Fredericksburg Line, located off US Route 17 in Spotsylvania County, Virginia, about 5 miles (8.0 km) south of downtown Fredericksburg in the unincorporated community of Olive (with a Fredericksburg mailing address). It opened on November 16, 2015 – the first extension of VRE service since its opening.[1][2]

The station consists of a 700-foot (210 m)-long low-level platform with a canopy and a small headhouse with restrooms.[4][5] The station has 1500 parking spaces for commuters.[1]

History

[edit]

Initial plans

[edit]

Since its opening in July 1992, the Fredericksburg Line had terminated at its namesake city. Spotsylvania was not included in the 1992 VRE network because the county was not part of the original funding district.[6] However, the Fredericksburg lot served a substantial number of commuters from Spotsylvania County – between 900 and 1000 daily by 2012. This caused capacity problems at the lot and prevented local residents from parking there.[3] In 2004, VRE's Strategic Plan indicated the possibility of a station in Spotsylvania at a Route 17 site, citing existing ridership from the county and the need for increased parking, as well as noting that the extension could be constructed relatively cheaply, allowing for near-term implementation.[6]

Joining VRE

[edit]

On August 18, 2009, the Spotsylvania County Board of Supervisors voted to join VRE. In September 2009, they additionally voted to join its associated funding district, the Potomac and Rappahannock Transportation Commission (PRTC).[7][8] The North Virginia Transportation Commission (NVTC) approved the decision (which included provisions for a VRE station in Spotsylvania) in November 2009, and Spotsylvania joined VRE and the PRTC in February 2010.[7] In August 2010, a Spotsylvania-funded study indicated that a site just south of Route 17 was the optimum location for the station.[7] The Spotsylvania County Board of Supervisors approved the site in October 2010.[9]

Planning and delays

[edit]

The VRE board issued preliminary approval of the extension in June 2012 and devoted about $400,000 in VRE funds to the project.[10]

A Department of Environmental Quality public comment period regarding the third track lasted from January to February 2013.[11] Design work started in June 2012 and was finished by March 2013.[12] In March 2013, the VRE board voted to issue an invitation for bids, due in May 2013.[13][14] On May 17, the board issued a $2.349 million contract to Hammerhead Construction for station construction, with work intended to begin in June.[12] A $8 million contract for the third track was awarded in June.[15] A $20 million contract with CSX Transportation was approved in September 2013; this signing allowed construction but work did not yet begin.[16]

The station was originally planned to open in December 2013, but this was delayed several times. A completion date of March 2014 with the third track several months later was announced in September 2013.[16] A later date of June 2014 was announced in November 2013 due to delays in negotiations, as the owners of the property upon which the third track and parking lot will be built disputed the price they were to be paid for the land.[17] Construction on the third track started in early 2014, but not on the parking lot and station, due to a continued lack of agreement. In May 2014, VDOT took over negotiations from the county, as the state agency had more power of eminent domain.[18]

In July 2014, VDOT filed a certificate of take in a county court, which the property owners consented to; this allowed the land to be transferred even without a final agreement on the sale price.[19] Bidding for the parking lot and roadway construction opened on July 25, 2014, with bids due on August 27.[20][19][21] The $7.3 million lowest bid was selected in September 2014.[22]

Construction

[edit]

A groundbreaking ceremony was held on August 12, 2014.[23] By then the third track and station were to be complete by February 2015, but parking lot construction would take eight months to complete, further delaying opening until July 2015.[20][23] At the groundbreaking, officials stated that the station might open as soon as December 2014 even if the parking lot was not yet complete, but this did not come to fruition.[24]

In March 2015, the VRE board voted to terminate the $8.7 million contract with one company, which had been working on the third track project, due to numerous safety violations. The termination was expected to delay the third track but not the station opening.[25] Negotiations about the cost of the parking land failed in 2015; the case will go to trial in May 2016.[26] By July 2015 the station was planned to open in September, though work on the third track did not resume until August 2015.[26][27][28]

Opening

[edit]

On October 26, 2015, VRE announced that the station would open at the start of service on November 16, 2015.[2][29] The station saw full service on the 16th, with a mid-morning ribbon-cutting ceremony.[1] It was the first extension of VRE service since the system opened in 1992, but not the first station added to the system – Lorton and Franconia–Springfield opened as infill stations in the mid-1990s.[30]

During the first week of operations, daily ridership at Spotsylvania averaged 550 boardings.[31] The third track opened on May 17, 2016.[32] Later that month, an agreement for a price of $3 million – substantially higher than VRE's original offer – was reached for the purchase of the parking lot property.[33]

Funding

[edit]

The station itself cost $3.4 million to build, while the associated 2.6 miles (4.2 km) of third track with high-speed crossovers cost $32.5 million.[10] The project was funded by state funds and by Spotsylvania County.[34] Funding for operations on the extension comes from Spotsylvania County.[3] In August 2012, the county announced that revenues from bond sales would be used to fund the extension.[35]

VRE oversaw the design and construction of the station for the county.[34]

References

[edit]
  1. ^ a b c d e Lazo, Luz (November 15, 2015). "VRE Spotsylvania station to open Monday". Washington Post. Archived from the original on November 15, 2015. Retrieved November 16, 2015.
  2. ^ a b c "VRE to Open New Spotsylvania VRE Station" (Press release). Virginia Railway Express. October 26, 2015. Archived from the original on November 17, 2015. Retrieved October 27, 2015.
  3. ^ a b c Weir, Kytja (July 4, 2012). "VRE to expand into Spotsylvania County". Washington Examiner. Archived from the original on August 8, 2014. Retrieved October 7, 2012.
  4. ^ STV Inc. (March 27, 2013). "Spotsylvania Station" (PDF). Virginia Railway Express. Archived from the original (PDF) on September 27, 2013.
  5. ^ "Spotsylvania (Opening Nov.16, 2015)". Virginia Railway Express. Archived from the original on November 17, 2015.
  6. ^ a b Parsons, Brinckerhoff, Quade & Douglas Inc. (May 2004). "Potential Network Expansion" (PDF). VRE Strategic Plan. pp. 85–86. Archived from the original (PDF) on April 14, 2015.{{cite web}}: CS1 maint: multiple names: authors list (link)
  7. ^ a b c HDR Engineering (August 4, 2010). "Spotsylvania County VRE Commuter Rail Station Site Screening Analysis: Final Technical Memorandum" (PDF). Spotsylvania County. Archived from the original (PDF) on August 5, 2014. Retrieved January 17, 2013.
  8. ^ Anthony J. Romanello & Joseph L. Howard (September 8, 2009). "Action Item: Board of Supervisors" (PDF). Stafford Board of Supervisors. Archived (PDF) from the original on August 8, 2014. Retrieved May 17, 2013.
  9. ^ Spotsylvania County Board of Supervisors (October 26, 2010). "Agenda: October 26, 2010—Brief Update" (PDF). Spotsylvania County. Archived from the original (PDF) on August 14, 2014.
  10. ^ a b Shenk, Scott (June 15, 2012). "VRE makes moves on Spotsylvania station, third track". The Free Lance-Star. Archived from the original on March 21, 2023. Retrieved January 18, 2013.
  11. ^ "Public Notice – Environmental Project" (PDF). Virginia Department of Environmental Quality. Archived from the original (PDF) on February 2, 2013. Retrieved January 18, 2013.
  12. ^ a b Allen, Doug (May 17, 2013). "Authorization to Award a Contract for Construction of the Spotsylvania Station Project". Virginia Railway Express. Archived from the original on November 17, 2015. Retrieved May 17, 2013.
  13. ^ Allen, Doug (March 15, 2013). "AGENDA ITEM 8-A CONSENT AGENDA ITEM". Virginia Railway Express. Archived from the original on November 17, 2015. Retrieved April 3, 2013.
  14. ^ Shenk, Scott (March 15, 2013). "Spotsylvania another step closer to new VRE station". Fredericksburg News. Archived from the original on March 21, 2023. Retrieved November 17, 2015.
  15. ^ Shenk, Scott (June 21, 2013). "VRE picks builder for Spotsylvania third track project". Fredericksburg News. Archived from the original on March 21, 2023. Retrieved June 25, 2013.
  16. ^ a b Shenk, Scott (September 20, 2013). "Spotsylvania VRE station opening pushed back". Fredericksburg News. Archived from the original on December 23, 2020. Retrieved September 22, 2013.
  17. ^ Shenk, Scott (November 15, 2013). "VRE station in Spotsy pushed back again". Fredericksburg News. Retrieved November 15, 2013.
  18. ^ Shenk, Scott (May 11, 2014). "GETTING THERE: Spotsylvania VRE station stalled over parking lot". Fredericksburg News. Archived from the original on June 1, 2014. Retrieved June 1, 2014.
  19. ^ a b Shenk, Scott (July 29, 2014). "Spotsy ready to roll on new VRE station". Fredericksburg News. Archived from the original on March 21, 2023. Retrieved August 5, 2014.
  20. ^ a b "INVITATION FOR BID (IFB) #14-03-21 Virginia Railway Express (VRE) Station Parking Lot & Site Access Improvements Construction Project" (PDF). County of Spotsylvania, Procurement Division. July 25, 2014. Archived from the original (PDF) on August 5, 2014. Retrieved August 5, 2014.
  21. ^ "Attachment A: Bid Form, Virginia Railway Express (VRE) Station Parking Lot, Site Access Improvements Construction Project" (PDF). County of Spotsylvania, Procurement Division. July 25, 2014. Archived from the original (PDF) on August 5, 2014. Retrieved August 5, 2014.
  22. ^ Shenk, Scott (September 10, 2014). "Contractor picked for VRE station lot project in Spotsy". The Lance Free-Star. Archived from the original on March 21, 2023. Retrieved September 11, 2014.
  23. ^ a b "Spotsylvania and VRE to Construct New Station" (PDF) (Press release). Virginia Railway Express. August 6, 2014. Archived (PDF) from the original on November 17, 2015. Retrieved August 9, 2014.
  24. ^ Shenk, Scott (August 12, 2014). "Officials break ground at Spotsylvania VRE station". Fredericksburg News. Archived from the original on March 21, 2023. Retrieved August 14, 2014.
  25. ^ Shenk, Scott (March 21, 2015). "VRE to cancel contract with third-track contractor". The Free Lance-Star. Archived from the original on March 21, 2023. Retrieved March 21, 2015.
  26. ^ a b Shenk, Scott (July 9, 2015). "Spotsylvania VRE station expected to open in late summer: DESPITE SETBACKS, SPOTSY DEPOT COULD BE READY FOR COMMUTERS BY SEPTEMBER". Free Lance-Star. Archived from the original on March 21, 2023. Retrieved July 11, 2015.
  27. ^ Shenk, Scott (November 16, 2015). "First VRE trains leave new Spotsylvania station". Free Lance-Star. Archived from the original on September 18, 2017. Retrieved November 16, 2015.
  28. ^ Shenk, Scott (April 11, 2016). "VRE third track expected to open this month". Free Lance-Star. Archived from the original on March 21, 2023. Retrieved April 12, 2016.
  29. ^ Lazo, Luz (October 26, 2015). "VRE's Spotsylvania station to open next month". Washington Post. Archived from the original on October 27, 2015. Retrieved October 27, 2015.
  30. ^ Taube, Richard K. (August 11, 2008). "Chronology of the Virginia Railway Express: 1964 to Present" (PDF). Virginia Railway Express. Archived (PDF) from the original on November 17, 2015. Retrieved November 16, 2015.
  31. ^ "Editorial: Riders, officials hail Spotsylvania's VRE station". Fredericksburg News. November 22, 2015. Archived from the original on August 25, 2018. Retrieved November 23, 2015.
  32. ^ "VRE Completes Spotsylvania Third Track Project". Fredericksburg Today. May 18, 2016. Archived from the original on June 4, 2016. Retrieved May 20, 2016.
  33. ^ Branscome, Jeff (May 22, 2016). "VDOT and Spotsylvania agree to pay millions for VRE parking lot". Fredericksburg News. Archived from the original on March 21, 2023. Retrieved May 22, 2016.
  34. ^ a b Zehner, Dale (July 15, 2012). "AGENDA ITEM 9-F ACTION ITEM". Virginia Railway Express. Archived from the original on November 17, 2015. Retrieved January 17, 2013.
  35. ^ "Spotsylvania, Va" (PDF). Commuter Update. Virginia Railway Express. August 2012. Archived from the original (PDF) on January 20, 2013.
[edit]