Jump to content

Lunderskov–Esbjerg railway line

From Wikipedia, the free encyclopedia
(Redirected from Lunderskov-Esbjerg line)
Lunderskov–Esbjerg railway line
The Lunderskov–Esbjerg railway line west of Vejen station in 2020
Overview
Native nameLunderskov-Esbjerg-banen
StatusOperational
OwnerBanedanmark[1]
Line number29[1]
LocaleSouthern Jutland
Termini
Stations9
Service
TypeHeavy rail
SystemDanish railway
Operator(s)Danish State Railways
GoCollective
History
Commenced24 April 1868 (1868-04-24)
Opened3 October 1874 (1874-10-03)
Technical
Line length55.7[1] km (34.6 mi)
Number of tracksDouble track
CharacterPassenger trains
Freight trains
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV AC 50 Hz
Operating speed180[1] km/h (110 mph)
The Lunderskov–Esbjerg railway line
Map of the Lunderskov–Esbjerg railway line.
Lunderskov–Esbjerg line
Lunderskov
DSB workshops
Andst
goods station
Vejen
DSB workshops
goods station
Brørup
Holsted
Gørding
DSB workshops
Bramming
Tjæreborg
E20-DK.svg
E20
Esbjerg motorway
Jerne
goods station
DSB workshops
Esbjerg

The Lunderskov-Esbjerg line is the railway between Lunderskov and Esbjerg in Southern Jutland. It was opened on 3 October 1874, along with the first part of the Esbjerg–Struer railway line to Varde.

History

[edit]

The construction of the line was authorised by a law of 24 April, 1868, together with the West Jutland longitudinal line, the Vendsyssel line and the Silkeborg line. On the same date, a law concerning the construction of the port of Esbjerg was also passed. In 1909, the railway bridge over Snæum river was destroyed by a 3 metres (10 ft) storm surge.[2]

Stations

[edit]

Operation

[edit]

From January 2003, the Esbjerg-Bramming section is operated by both Arriva and DSB, while the Bramming-Lunderskov section is only be operated by DSB with both Regional services to Aarhus and InterCity services to Copenhagen.

Electrification

[edit]

In the wake of the delay in the delivery of the scandal-ridden IC4 trains, it was proposed several times through the late '00s and early '10s to electrify the main line of the Danish railway network in order to be able to buy proven standard equipment to remedy the growing shortage of train equipment.[3] However, this was rejected just as many times, as electrification of the railway network would require a simultaneous upgrading of the signaling system, which was already being replaced throughout the country by ERTMS 2. [4]

In this context, the Esbjerg-Lunderskov section was interesting, because in 1997 the section had already been almost completely upgraded in preparation for a forthcoming electrification, just before the electrification program was cancelled.[5] On 7 February 2012, the Social Democrats, the Radical Left, SF, Venstre, DF, Liberal Alliance and the Conservative People's Party therefore agreed to electrify the track, so it was ready for electric trains by the end of 2015. [6]  

The main idea behind the electrification was that it would allow for the rapid purchase of 15 new electric train sets, which could replace a similar number of IC3 train sets. [7] To further secure the track for the future, it was subsequently decided, on 12 March 2013, by the same conciliation group to electrify the track with a system rated for 200 km/h (120 mph). [8]  

Electrification was later postponed to 2016 due to economies of scale, as the contractors could thereby go directly from this section to the other sections that were to be electrified subsequently. [9] The electrification was begun on 6 August 2017, [10] but was later hit by operational problems and a complete shutdown for electric trains, due to problems with the Siemens Sicat SX overhead distribution system. After a replacement of the faulty rope wheels, the track was reopened for electric operation on 13 August 2018. [10]

References

[edit]

Citations

[edit]
  1. ^ a b c d "Line information (TIB)" (in Danish). Banedanmark. Retrieved 2024-06-28.
  2. ^ Munch-Petersen, J. (1910). The Storm Flood on December 3-4, 1909. p. 68-70. Retrieved April 1, 2021.
  3. ^ Nicolai Østergaard (2010). "IC4 delay forces DSB to modernize ME locomotives". Ingeniøren. Retrieved 2013-08-10.
  4. ^ Nicolai Østergaard (2009). "Social Democrats: Government Pickles Electrification". Ingeniøren. Retrieved 2013-08-10.
  5. ^ ""Modernization of the Railway Network in Western Denmark"" (PDF). 2010. Retrieved 2013-08-10.
  6. ^ ""Broad agreement on electrification of the railway, etc. - Ministry of Transport"". Trm.dk. 2012-02-07. Retrieved 2013-08-10.
  7. ^ Nicolai Østergaard (2013-06-27). ""Here is the solitaire card that gives DSB's commuters 2,000 extra seats". Ingeniøren. Retrieved 2013-08-10.
  8. ^ ""The train will be speeding at 200 km/h". dr.dk. 2013-03-13. Retrieved 2013-08-10.
  9. ^ Østergaard, Christian. ""The first electrification of the railway will be delayed by one year " Ingeniøren, 16 December 2014. Accessed: 16 December 2014.
  10. ^ a b Railway electrification is celebrated with a feast day in two cities | jv.dk

Bibliography

[edit]

See also

[edit]
[edit]