Line 3 (Jinan Metro)
Appearance
(Redirected from Longao Building station)
Line 3 | |
---|---|
Overview | |
Other name(s) | R3[1] (construction name) |
Status | operating |
Locale | Jinan |
Termini | |
Stations | 18 |
Service | |
Type | rapid transit |
System | Jinan Metro |
Rolling stock | 6-car Type B |
History | |
Opened | 28 December 2019[2] |
Technical | |
Line length | 33.675 km (20.9 mi) (Future: 34.328 km (21.3 mi)) |
Character | underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 100 km/h (62 mph) |
Jinan Metro Line 3 (Chinese: 济南地铁3号线; pinyin: Jǐnán Dìtiě Sān Hào Xiàn) is a rapid transit line in Jinan, China. The line use six-car Type B rolling stock. The line is 33.675 kilometres (20.9 miles) long. It is completely underground.
Phase 1 of Line 3 was opened on 28 December 2019.[2] Phase 2 of Line 3 opened on 22 November 2024 (Jichangbei station is still under construction).[3][4]
Timeline
[edit]Segment | Opened | Length | Station(s) | Name |
---|---|---|---|---|
Longdong — Tantou | 28 December 2019[2] | 21.592 km (13.4 mi) | 12 | Phase 1 |
Peijiaying | 25 October 2023[5] | n/a | 1 | infill station |
Tantou — Jichangnan | 22 November 2024[3] | 12.083 km (7.5 mi) | 5 | Phase 2 |
Jichangnan — Jichangbei | 2027 or 2028 (U/C) | 0.653 km (0.4 mi) | 1 |
Stations
[edit]Station Name | Connections | Distance km |
District | ||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
Longdong | 龙洞 | 0 | Lixia | ||||
Mengjiazhuang | 孟家庄 | ||||||
Longao Building | 龙奥大厦 | ||||||
Olympic Center | 奥体中心 | ||||||
Anchengjie[note 1] | 安成街 | ||||||
Dingjiazhuang | 丁家庄 | ||||||
Huayuandonglu | 花园东路 | ||||||
Bajianpu | 八涧堡 | 2 | Licheng | ||||
Zhangmatun | 张马屯 | ||||||
Wangsheren | 王舍人 | ||||||
Peijiaying | 裴家营 | ||||||
Jinandong Railway Station | 济南东站 | MDK | |||||
Tantou | 滩头 | ||||||
Qujiazhuang | 曲家庄 | ||||||
Chuanliu | 川流 | ||||||
Lingangbeilu | 临港北路 | ||||||
Linkong | 临空 | ||||||
Jichangnan (Jinan International Airport South) | 机场南 | 33.675 | |||||
Jichangbei (Jinan International Airport North) (U/C) | 机场北 | 34.328 | Licheng / Zhangqiu | ||||
Notes
[edit]- ^ Was Ligenglu until 22 November 2024.
References
[edit]- ^ "济南市城市轨道交通第二期建设规划社会稳定风险评估公众参与公示". 2019-05-21.
- ^ a b c "定了!济南地铁3号线12月28日正式通车".
- ^ a b "壹探轨道 济南地铁3号线二期计划于11月22日11时通车运营". 2024-11-21.
- ^ "地铁3号线牵起济南四大交通枢纽". 2024-11-18.
- ^ "济南地铁3号线裴家营站明日启用,首班车6.05始发". Sina. 24 October 2023. Retrieved 26 October 2023.