Line 3 (Suzhou Rail Transit)

From Wikipedia, the free encyclopedia
(Redirected from Line 3, Suzhou Rail Transit)
Line 3
A train of Suzhou Rail Transit Line 3
Overview
StatusIn operation
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations37
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
History
Opened25 December 2019; 4 years ago (2019-12-25)[1]
Technical
Line length45.272 km (28.131 mi)[2]
Track gauge1,435 mm (4 ft 8+12 in)

Line 3 is an east-west line of Suzhou Rail Transit. The line is 45.272 kilometers long.[2] The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.

Line 3 started trial operations from December 6 to December 10, 2019.[3] Official operation started on December 25, 2019.[1]

Stations

[edit]

Service routes

[edit]
  • Suzhou Xinqu Railway Station — Huaqiao (Line 11)
  • Suzhou Xinqu Railway Station — Fengtingdadao, in rush hours
Service routes Station name Connections Distance
km
Location
English Chinese
Suzhou Xinqu Railway Station 苏州新区火车站  6 
Suzhou New District railway station ITH
Suzhou Tram Tram line 2
0.00 0.00 Huqiu
Huichanglu 惠昌路
Wenchanglu 文昌路 Suzhou Tram Tram line 2 (branch)
Changting 长亭
Tongdun 铜墩
Mayunlu 马运路
Xijinqiao 西津桥  8   9 
Heshan 何山
Shizishan 狮子山  1  Suzhou Tram Tram line 1
Shishanlu 狮山路
Shajinqiao 沙金桥
Suoshanqiao West 索山桥西  5 
Hengshan 横山
Hengtang 横塘
Shihu North 石湖北
Xinguo 新郭 Gusu
Panlilu 盘蠡路  2  Wuzhong
Baodailu 宝带路  4 
Yingchunlu 迎春路
Beiganglu 北港路
Tongyuanlu South 通园路南  7  SIP
Shupulu North 墅浦路北
Dongzhenlu 东振路
Jinsheqiao 金厍桥  5 
Ligongdi West 李公堤西  6 
Dongfangzhimen 东方之门  1 
Yanyuqiao 烟雨桥  9 
Nibang 泥浜
Tangzhuang 唐庄  8 
Kuatang 跨塘
Suzhou Yuanqu Railway Station 苏州园区火车站  8  Suzhou Industrial Park railway station KAH
Fangwanjie 方湾街
Fenghelu 丰和路
Shuangmajie 双马街
Fengtingdadao 葑亭大道  5 
Gexiangjie 戈巷街
Weiting 唯亭
Through service to/from Huaqiao on  11 

Through service

[edit]

Through service between Line 3 and Line 11 started on December 23, 2023.[4] During 23 December 2023 and 29 June 2024, with through train to/from line 11, Gexiangjie and Weiting were only served by Line 11 trains.

Rolling stock

[edit]
Fleet numbers Year Built Time in service Builder Class Number in service No
of
car
Assembly Rolling stock Number Depots Line assigned Notes
300 (50 sets) 2017-2021 2018-2024 CRRC Nanjing Puzhen B 60 (10 sets) 6 Tc+Mp+M - M + Mp+Tc PM101
PM102
PM116
030101-035006
(0301-0350)
Songling Depot
Yuanhe Yard
Tian'Edang Yard
 4  All cars will be converted to PM259 after the first overhaul and re-equipped to Line 7 by late 2024.
Cars assigned to Line 3 service out of regular service since June 29, 2024 and removed from the service since September 28, 2024.
300 (50 sets) 2023-2025 2024-present CRRC Nanjing Puzhen B 186 (31 sets) 6 Tc+Mp+M - M + Mp+Tc PM247 030101-035006
(0301-0350)
Xushuguan Depot
South Weiting Yard
Chaoyang Road Depot
Huaqiao Yard
 3   11 

Map

[edit]
[edit]

References

[edit]
  1. ^ a b "苏州轨道交通3号线明日(12月25日)11点30分开通". 2019-12-24.
  2. ^ a b "轨交3号线铺轨,预计2019年底试运营". 2018-01-10.
  3. ^ "轨交3号线试乘首日迎来众多市民"打卡"". 2019-12-07. 此次"万人试乘"活动时间为12月6日至10日,为期5天。每天试乘时限为7:00至19:00
  4. ^ "地铁S1线拟更名为11号线 预计2023年底与3号线贯通运营".