Jump to content

Jimen Qiao station

Coordinates: 39°57′59″N 116°20′57″E / 39.966304°N 116.349137°E / 39.966304; 116.349137
From Wikipedia, the free encyclopedia
(Redirected from Jimenqiao station)
Jimen Qiao[1]

蓟门桥
Beijing Subway
Line 12 platform (December 2024)

Changping Line platform (December 2024)
General information
LocationJimen Bridge (蓟门桥), Intersection of North Third Ring West Road, North Third Ring Middle Road and Xitucheng Road
Boundary of Beitaipingzhuang Subdistrict and Huayuanlu Subdistrict, Haidian District, Beijing
China
Coordinates39°57′59″N 116°20′57″E / 39.966304°N 116.349137°E / 39.966304; 116.349137
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Line 12
     Changping line
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
OpenedDecember 15, 2024; 11 days ago (2024-12-15)
Services
Preceding station Beijing Subway Following station
Dazhong Si Line 12 Beitaipingzhuang
towards Dongbabei
Xitucheng Changping line Terminus
Location
Jimen Qiao[1] is located in Beijing
Jimen Qiao[1]
Jimen Qiao[1]
Location in central Beijing

Jimen Qiao station[1][2][3] (Chinese: 蓟门桥站; pinyin: Jìmén Qiáo zhàn) is an interchange station on Line 12 and Changping line of the Beijing Subway.[4][5] It opened on December 15, 2024, and is the southern terminus of Changping line.

Layout

[edit]

The station has underground island platforms for both Line 12 and Changping line.

Station art

[edit]

The two public art works of the Changping line station are themed with Jimen Yanshu, one of the Eight Great Sights in Yanjing. Among them, the wall of the non-paid area of the station hall is decorated with an art glass named "Yanshu Changning", and a metal sculpture of the smoke tree is arranged between the two pillars of the station hall, named "Yanshu Changning-2".[6]

Exits

[edit]

There are 6 exits, lettered A, B1, B2, C, D and E.

References

[edit]
  1. ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2024-12-22.
  2. ^ "轨道交通17号线、19号线一期、昌平线南延一期工程沿线车站命名预案" (PDF). 北京市规划和自然资源委员会. 2021-07-19. Retrieved 2023-01-18.
  3. ^ "地名公告". Archived from the original on 2022-06-11. Retrieved 2023-01-18.
  4. ^ "昌平线南延+16号线南段!北京两条地铁新线最后"冲刺"". 北京日报客户端. 2022-12-23. Retrieved 2023-01-18. 昌平线南延北起清河站,南至西土城站,线路全长10.6公里,设车站6座:朱房北站(暂缓开通)、清河小营桥站、学知园站、六道口站、学院桥站、西土城站
  5. ^ "地铁昌平线南延线进入按图空载试运行". cnr.cn. 2022-11-23. Archived from the original on 2022-11-23. Retrieved 2023-01-18.
  6. ^ "北京轨道交通昌平线南延公共空间艺术品方案(公示稿)" (PDF). 北京市规划和自然资源委员会. 2022-12-06. Retrieved 2023-01-18.
[edit]