File:1979 MBTA Commuter Rail map.png
Original file (976 × 979 pixels, file size: 1.59 MB, MIME type: image/png)
This is a file from the Wikimedia Commons. Information from its description page there is shown below. Commons is a freely licensed media file repository. You can help. |
Summary
Description1979 MBTA Commuter Rail map.png |
English: A 1979 map of the MBTA Commuter Rail system. The November 1979 changes for Southwest Corridor construction are shown, as are the January 1980 extensions to Gardner and Concord. However, the December 1979 extension to Haverhill is shown as not yet completed; it shows never-opened stations at North Andover and Rosemont, plus a never-opened branch to Methuen. |
||||||||
Date | |||||||||
Source |
|
||||||||
Author | Massachusetts Bay Transportation Authority | ||||||||
Permission (Reusing this file) |
|
Items portrayed in this file
depicts
1979
image/png
fbdc52526d9e696371f652d4fe72a8fb168672aa
1,670,800 byte
979 pixel
976 pixel
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 20:15, 11 June 2020 | 976 × 979 (1.59 MB) | Pi.1415926535 | File:1980 MBTA system map reverse.png cropped 72 % horizontally, 68 % vertically using CropTool with precise mode. |
File usage
Metadata
This file contains additional information, probably added from the digital camera or scanner used to create or digitize it.
If the file has been modified from its original state, some details may not fully reflect the modified file.
File change date and time | 20:10, 11 June 2020 |
---|