Uptown Dubai Tower 1
Uptown Dubai Tower 1 (Burj 2020) | |
---|---|
Alternative names | Burj 2020 |
General information | |
Status | Proposed [1] |
Type | Commercial, Retail and hotel |
Location | Jumeirah Lake Towers, Dubai, United Arab Emirates |
Coordinates | 25°03′40″N 55°08′25″E / 25.061056°N 55.140278°E |
Construction started | May 2025 |
Completed | 2030 |
Owner | DMCC |
Management | DMCC |
Height | |
Roof | 711 metres (2,333 ft) |
Technical details | |
Floor count | 115 |
Design and construction | |
Structural engineer | Thornton Tomasetti |
The Uptown Dubai Tower 1 or Burj 2020 is a proposed 711 metres (2,333 ft) mega-tall skyscraper to be built in Jumeirah Lake Towers, Dubai, United Arab Emirates. It will include many amenities that will serve for various purposes.
History
[edit]First announced by developer Dubai Multi Commodities Centre at Cityscape Global in September 2015, it has been designed by Adrian Smith + Gordon Gill Architecture. When Dubai won the bid to host the Expo 2020 in 2013, in honour of the win, the Uptown Dubai Tower 1 was nicknamed Burj 2020 (Tower 2020). Responding to media questions about the status of the project in May 2017, the developer insisted the project will go ahead, saying "Significant steps were taken in 2016 to finalise Burj 2020 District master development plans, to include two iconic super-tall towers designed by leading architects Adrian Smith & Gordon Gill."[2] Now with the Uptown Tower By DMC already completed, the Burj 2020 has started site work. However, the actual construction will only start around May 2025. The anticipated year of completion is 2030.
References
[edit]- ^ "Uptown Dubai Tower 1 - the Skyscraper Center".
- ^ "What's Going On With The Burj 2020 Tower In JLT And Will It Ever Be Finished?". lovindubai.com. 14 May 2017.