Landing Platform Vessel 1
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
History | |
---|---|
United States | |
Name | Landing Platform Vessel 1 |
Owner | Blue Origin |
Port of registry | Port Canaveral, Florida[1] |
Laid down | 21 February 2023[2] |
Launched | 31 January 2024[2] |
Completed | 8 August 2024[1] |
In service | 2024 (planned) |
Identification | IMO number: 9998676 |
General characteristics | |
Type | Floating landing platform |
Tonnage | 13,818 GT |
Length | 115.9 m (380 ft)[2] |
Beam | 45.72 m (150.0 ft)[2] |
Depth | 6.706 m (22.00 ft) |
Landing Platform Vessel 1, nicknamed Jacklyn, is a barge which was manufactured for Blue Origin in 2024 for use as a landing platform ship. It is meant to enter service in 2024 for the New Glenn launch vehicle.
The LPV1 barge replaced the ship, also named Jacklyn, that Blue Origin had purchased in 2018 and intended to use as a landing platform vessel until 2022, when Blue Origin scrapped it.
History
[edit]Landing Platform Vessel 1 (LPV1) is a specialized barge designed to support Blue Origin's New Glenn rocket launches. It was laid down at a shipyard in Romania in February 2023 and launched in January 2024. The partially completed vessel was towed to Damen Shipyards in Brest, France for finishing works and commissioning in April 2024.[3] Before being named LPV1, it carried the yard identification Damen Mangalia 522520.[4] After brief sea trials, the vessel departed Brest for Florida in August 2024. As of June 2024[update], LPV1 was planned to see its first use in October 2024, during the maiden launch of the New Glenn rocket, where it will attempt to capture and land the rocket's first stage,[1][5] but by September, the initial launch had been delayed by Blue Origin.
Blue Origin announced on 2 September 2024, that LPV1 would be nicknamed named Jacklyn.[6] This tribute honors Jeff Bezos's mother, Jacklyn Bezos, whose name was previously given to a ship that Blue Origin had considered using for landing New Glenn while the ship was underway.[1]
See also
[edit]- Autonomous spaceport drone ship – Floating landing platform operated by SpaceX
References
[edit]- ^ a b c d Cornwell, Gav. "Jacklyn (Landing Platform Vessel #1) – Blue Origin". space-offshore.com. Retrieved 20 June 2024.
- ^ a b c d Cornwall, Gav [@SpaceOffshore] (30 May 2024). "Published stats from the American Bureau of Shipping (No guarantee these are accurate) Length Overall: 380ft / 115.9m Breadth Molded: 150ft / 45.72m Depth Molded: 22ft / 6.706m 10-Jan-2023 - Steel Cutting Date 21-Feb-2023 - Keel Laying Date 31-Jan-2024 - Launch Date" (Tweet). Retrieved 2 September 2024 – via Twitter.
- ^ "Landing Platform Vessel 1, future landing platform for New Glenn, to be based at Port Canaveral, Florida was towed thru Bosphorus en route from Damen's Mangalia shipyard towards Med".
- ^ "LPV-1, Rocket Launch Support Ship, IMO 9998676". Retrieved 4 September 2024.
- ^ "LANDING PLATFORM VESSEL 1, IMO 9998676 – Ship info, Owner, Manager, ISM, Classification Society, contacts | Marine Vessel Traffic". www.marinevesseltraffic.com. Retrieved 20 June 2024.
- ^ @blueorigin (2 September 2024). "Jacklyn, our #NewGlenn landing vessel, is arriving very soon" (Tweet) – via Twitter.
External links
[edit]- New Glenn: The Road to Space at YouTube by Blue Origin, 16 January 2019. Landing sequence on LPV starts at 01:18.