Jump to content

National Route 606 (Costa Rica): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Monkbot (talk | contribs)
m Task 20: replace {lang-??} templates with {langx|??} ‹See Tfd› (Replaced 1);
 
(13 intermediate revisions by 8 users not shown)
Line 1: Line 1:
{{Short description|Road in Costa Rica}}
{{Multiple issues|{{copy edit|date=September 2019}}{{cleanup|date=September 2019|reason=punctuations}}}}

{{Infobox road
{{Infobox road
|country=CRI
|country=CRI
|type=Tertiary
|type=Tertiary
|maint=[[Public Works and Transport Ministry]]
|route=606
|route=606
|name=National Tertiary Route 606
|alternate_name=
|alternate_name=
|map=
|map=
Line 19: Line 16:
|locations=Puriscal
|locations=Puriscal
|image=
|image=
|length_km=
|length_km=52.880
|length_round=1
|length_round=2
|length_ref=
|length_ref=
|established=
|established=
|history=
|history=
|previous_type=RNT
|previous_route=605
|next_type=RNT
|next_route=607
}}
}}
'''National Tertiary Route 606''', or just '''Route 606''' ({{langx|es|Ruta Nacional Terciaria 606}}, or {{lang|es|Ruta 606}}) is a [[National Road Network of Costa Rica|National Road Route]] of [[Costa Rica]], located in the [[Guanacaste Province|Guanacaste]], [[Puntarenas Province|Puntarenas]] provinces.<ref name='geoportal'>{{cite web |title=GeoPortal |url=https://sig.mopt.go.cr:8084/geo/index.html |publisher=Ministerio de Obras Públicas y Transporte de Costa Rica |access-date=28 May 2020}}</ref> It is known as {{lang|es|Carretera a Monteverde}}, between [[National Route 1 (Costa Rica)|Route 1]] in Puntarenas province and [[Monteverde]]. It is the main access road to the dairy farms and tourist-attraction rain forests of Monteverde.


==Description==
'''National Tertiary Route 606''', known as {{lang|es|Carretera a Monteverde}} is a road in [[Costa Rica]] between [[National Route 1 (Costa Rica)|Route 1]], at Puntarenas province and [[Monteverde]]. It is the main access road to the dairy farms and touristic rain forests of Monteverde.
In [[Guanacaste Province|Guanacaste]] province the route covers [[Abangares (canton)|Abangares]] canton ([[Sierra District|Sierra]] district), [[Tilarán (canton)|Tilarán]] canton ([[Quebrada Grande District|Quebrada Grande]], [[Cabeceras District, Tilarán|Cabeceras]] districts).

In [[Puntarenas Province|Puntarenas]] province the route covers [[Puntarenas (canton)|Puntarenas]] canton ([[Guacimal District|Guacimal]], [[Monte Verde District|Monte Verde]], [[Acapulco District|Acapulco]] districts).
<!--
NOTE: To fill the junction list table.
READ AND FOLLOW: [[Wikipedia:Manual of Style/Road junction lists]]

1) if only one province is covered, remove the province column, add text staying so, ie:
"The entire route is in Alajuela province."
1.b) the same goes for canton, and district, ie:
"The entire route is in Upala canton of Alajuela province."
"The entire route is in Upala district of Upala canton of Alajuela province."
2) remove regions/rows without junctions.
3) rearrange the rows in the route order, be concise on starting from direction_a to
direction_b according to the Infobox. Regions are provided and sorted by their postal
code order, NOT IN ROUTE ORDER.
4) measure in OSM/Google Maps from direction_a to every junction and fill distances.
5) merge (rowspan) province/canton cells to show the region only once
6) destinations are ONLY junctions! use {{Jct|country=CRI|RN?|###}} template
6.b) or end point of interest (airport, dock, river...), but not each town -->
<!--
==Junction list==
{| class="wikitable"
|-
! scope="col" | Province
! scope="col" | Canton
! scope="col" | District
! scope="col" | {{abbr|km|kilometre}}
! scope="col" | {{abbr|mi|mile}}
! scope="col" | Destinations
! scope="col" | Notes
|-
| [[Guanacaste Province|Guanacaste]]
| [[Abangares (canton)|Abangares]]
| [[Sierra District|Sierra]]
|
|
|
|
|-
| [[Guanacaste Province|Guanacaste]]
| [[Tilarán (canton)|Tilarán]]
| [[Quebrada Grande District|Quebrada Grande]]
|
|
|
|
|-
| [[Puntarenas Province|Puntarenas]]
| [[Puntarenas (canton)|Puntarenas]]
| [[Guacimal District|Guacimal]]
|
|
|
|
|-
| [[Puntarenas Province|Puntarenas]]
| [[Puntarenas (canton)|Puntarenas]]
| [[Monte Verde District|Monte Verde]]
|
|
|
|
|-
| [[Puntarenas Province|Puntarenas]]
| [[Puntarenas (canton)|Puntarenas]]
| [[Acapulco District|Acapulco]]
|
|
|
|
|} -->


==History==
==History==
While it has historically been mostly a gravel road, there have been recent efforts to asphalt the road in its entirety due to its use by tourists.<ref>{{cite web |title=Mejoras en la Ruta 606 entre Guacimal y Santa Elena benefician Comunidades de Monteverde |url=https://presidencia.go.cr/comunicados/2018/02/mejoras-en-la-ruta-606-entre-guacimal-y-santa-elena-benefician-comunidades-de-monteverde/ |date=14 February 2018 |access-date=24 September 2019}}</ref>


Work started in June 2017, with a projected end date of September 2018, to stabilize and widen some sections of the road. Work also began to pave the remaining 17-kilometer dirt and gravel section from Guacimal to Santa Elena. However, some of the residents have concerns about the effect of increased traffic and visitors on the area.<ref>{{cite news |last1=Ávila |first1=Laura |title=Construcción de Nueva Carretera a Monteverde reta al desarrollo turístico de la zona |url=https://www.nacion.com/economia/negocios/construccion-de-nueva-carretera-a-monteverde-reta/UZDAWTYC6NHULD65E655VE4QKI/story/ |access-date=24 September 2019 |date=4 May 2019}}</ref>
While it has been mostly a gravel road, there have been recent efforts to asphalt the road in its entirety due to its touristic attractiveness. <ref>{{cite web |title=Mejoras en la Ruta 606 entre Guacimal y Santa Elena benefician Comunidades de Monteverde |url=https://presidencia.go.cr/comunicados/2018/02/mejoras-en-la-ruta-606-entre-guacimal-y-santa-elena-benefician-comunidades-de-monteverde/ |date=14 February 2018 |accessdate=24 September 2019}}</ref>


By December 2018, the contractor Grupo Orosi had a 22% advance on the work, with a three-month delay after the original project end date. The contract was canceled due to the lack of progress and financial uncertainties of the contractor. There were also concerns by the National Laboratory of Materials and Structural Models (LANAMME) about the quality of the material in use. The last segment remains unpaved as of October 2019, while awaiting a new contract with a different company to continue the work, projected to start in May 2020.<ref>{{cite news |last1=Recio |first1=Patricia |title=Asfaltado de 17 kilómetros a Monteverde vuelve a quedar varado |url=https://www.nacion.com/el-pais/infraestructura/asfaltado-de-17-kilometros-a-monteverde-vuelve-a/SAOPAYH5INF23EDDYI62M7IWZM/story/ |access-date=24 September 2019 |date=22 December 2018}}</ref><ref>{{cite news |last1=Recio |first1=Patricia |title=MOPT Prueba en Monteverde nuevo Modelo para construir carreteras |url=https://www.nacion.com/el-pais/infraestructura/mopt-prueba-en-monteverde-nuevo-modelo-para/CBSF5GJIEZG5VB7W4XNDELM4Y4/story/ |access-date=24 September 2019 |date=28 March 2019}}</ref><ref>{{cite news |last1=Recio |first1=Patricia |title=Asfaltado de ruta a Monteverde se iniciaría hasta mayo del otro año |url=https://www.nacion.com/el-pais/infraestructura/asfaltado-de-ruta-a-monteverde-se-iniciaria-hasta/BF5RZOHDCFFMVLBYL6633S76JU/story/ |access-date=2 October 2019 |date=2 October 2019}}</ref>
Work started in June 2017 with a projected end date of September 2018, to stabilize and widen some sections for the road in its entirety. They also started work for the remaining 17 kilometers of dirt and gravel section from Guacimal to Santa Elena. However, some of the residents have concerns about the effect of the increased traffic and visitors and their footprint on the area. <ref>{{cite news |last1=Ávila |first1=Laura |title=Construcción de Nueva Carretera a Monteverde reta al desarrollo turístico de la zona |url=https://www.nacion.com/economia/negocios/construccion-de-nueva-carretera-a-monteverde-reta/UZDAWTYC6NHULD65E655VE4QKI/story/ |accessdate=24 September 2019 |date=4 May 2019}}</ref>


Landslides are common in the rainy season.<ref>{{cite news |last1=Cabezas |first1=Yaslin |title=Derrumbe mantiene cerrado el paso en Monteverde |url=https://www.crhoy.com/nacionales/derrumbe-mantiene-cerrado-el-paso-en-monteverde/ |access-date=2 October 2020 |work=crhoy.com |date=2 October 2020}}</ref>
By December 2018, the contractor Grupo Orosi had a 22% advance on the works, with a three-month delay after the signed end date. The contract was canceled due to the lack of progress and financial uncertainties of the contractor. There were also concerns by the [http://www.lanamme.ucr.ac.cr/ National Laboratory of Materials and Structural Models] (LANAMME) about the quality of the material in use. The last segment remains unpaved as of September 2019, while awaiting a new contract with a new company to continue the works.<ref>{{cite news |last1=Recio |first1=Patricia |title=Asfaltado de 17 kilómetros a Monteverde vuelve a quedar varado |url=https://www.nacion.com/el-pais/infraestructura/asfaltado-de-17-kilometros-a-monteverde-vuelve-a/SAOPAYH5INF23EDDYI62M7IWZM/story/ |accessdate=24 September 2019 |date=22 December 2018}}</ref><ref>{{cite news |last1=Recio |first1=Patricia |title=MOPT Prueba en Monteverde nuevo Modelo para construir carreteras |url=https://www.nacion.com/el-pais/infraestructura/mopt-prueba-en-monteverde-nuevo-modelo-para/CBSF5GJIEZG5VB7W4XNDELM4Y4/story/ |accessdate=24 September 2019 |date=28 March 2019}}</ref>


==References==
==References==
Line 41: Line 116:
{{Road Transport in Costa Rica}}
{{Road Transport in Costa Rica}}


[[Category:Road transport in Costa Rica]]
[[Category:Highways in Costa Rica]]

[[es:Ruta 606 (Costa Rica)]]

Latest revision as of 10:15, 25 October 2024

National Tertiary Route 606 shield}}
National Tertiary Route 606
Ruta nacional terciaria 606
Route information
Maintained by Ministry of Public Works and Transport
Length52.880 km (32.858 mi)
Major junctions
South end Route 1 (Sardinal)
Major intersections Route 605
North endSanta Elena, Monteverde
Location
CountryCosta Rica
Highway system
Route 605 Route 607

National Tertiary Route 606, or just Route 606 (Spanish: Ruta Nacional Terciaria 606, or Ruta 606) is a National Road Route of Costa Rica, located in the Guanacaste, Puntarenas provinces.[1] It is known as Carretera a Monteverde, between Route 1 in Puntarenas province and Monteverde. It is the main access road to the dairy farms and tourist-attraction rain forests of Monteverde.

Description

[edit]

In Guanacaste province the route covers Abangares canton (Sierra district), Tilarán canton (Quebrada Grande, Cabeceras districts).

In Puntarenas province the route covers Puntarenas canton (Guacimal, Monte Verde, Acapulco districts).

History

[edit]

While it has historically been mostly a gravel road, there have been recent efforts to asphalt the road in its entirety due to its use by tourists.[2]

Work started in June 2017, with a projected end date of September 2018, to stabilize and widen some sections of the road. Work also began to pave the remaining 17-kilometer dirt and gravel section from Guacimal to Santa Elena. However, some of the residents have concerns about the effect of increased traffic and visitors on the area.[3]

By December 2018, the contractor Grupo Orosi had a 22% advance on the work, with a three-month delay after the original project end date. The contract was canceled due to the lack of progress and financial uncertainties of the contractor. There were also concerns by the National Laboratory of Materials and Structural Models (LANAMME) about the quality of the material in use. The last segment remains unpaved as of October 2019, while awaiting a new contract with a different company to continue the work, projected to start in May 2020.[4][5][6]

Landslides are common in the rainy season.[7]

References

[edit]
  1. ^ "GeoPortal". Ministerio de Obras Públicas y Transporte de Costa Rica. Retrieved 28 May 2020.
  2. ^ "Mejoras en la Ruta 606 entre Guacimal y Santa Elena benefician Comunidades de Monteverde". 14 February 2018. Retrieved 24 September 2019.
  3. ^ Ávila, Laura (4 May 2019). "Construcción de Nueva Carretera a Monteverde reta al desarrollo turístico de la zona". Retrieved 24 September 2019.
  4. ^ Recio, Patricia (22 December 2018). "Asfaltado de 17 kilómetros a Monteverde vuelve a quedar varado". Retrieved 24 September 2019.
  5. ^ Recio, Patricia (28 March 2019). "MOPT Prueba en Monteverde nuevo Modelo para construir carreteras". Retrieved 24 September 2019.
  6. ^ Recio, Patricia (2 October 2019). "Asfaltado de ruta a Monteverde se iniciaría hasta mayo del otro año". Retrieved 2 October 2019.
  7. ^ Cabezas, Yaslin (2 October 2020). "Derrumbe mantiene cerrado el paso en Monteverde". crhoy.com. Retrieved 2 October 2020.